Volumn 1, Issue 4, 2007, Pages 431-448

Heuristics for the single machine scheduling problem with early and quadratic tardy penalties

Author keywords

dispatching rules; early penalties; heuristics; no machine idle time; quadratic tardy penalties; scheduling; single machine

Indexed keywords


EID: 84969451575     PISSN: 17515254     EISSN: 17515262     Source Type: Journal    
DOI: 10.1504/EJIE.2007.015391     Document Type: Article
Times cited : (26)

References (22)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: areview
    • Baker, K.R. and Scudder, G.D. (1990) ‘Sequencing with earliness and tardiness penalties: areview’, Operations Research, Vol. 38, pp.22–36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 2
    • 0028399847 scopus 로고
    • A greedy heuristic for the mean tardiness sequencing problem
    • Fadlalla, A., Evans, J.R. and Levy, M.S. (1994) ‘A greedy heuristic for the mean tardiness sequencing problem’, Computers and Operations Research, Vol. 21, pp.329–336.
    • (1994) Computers and Operations Research , vol.21 , pp. 329-336
    • Fadlalla, A.1    Evans, J.R.2    Levy, M.S.3
  • 3
    • 0024010206 scopus 로고
    • One-processor scheduling with symmetric earliness and tardiness penalties
    • Garey, M.R., Tarjan, R.E. and Wilfong, G.T. (1988) ‘One-processor scheduling with symmetric earliness and tardiness penalties’, Mathematics of Operations Research, Vol. 13, pp.330–348.
    • (1988) Mathematics of Operations Research , vol.13 , pp. 330-348
    • Garey, M.R.1    Tarjan, R.E.2    Wilfong, G.T.3
  • 4
    • 0020809540 scopus 로고
    • Minimizing a quadratic function of job lateness on a single machine
    • Gupta, S.K. and Sen, T. (1983) ‘Minimizing a quadratic function of job lateness on a single machine’, Engineering Costs and Production Economics, Vol. 7, pp.187–194.
    • (1983) Engineering Costs and Production Economics , vol.7 , pp. 187-194
    • Gupta, S.K.1    Sen, T.2
  • 6
    • 0033685372 scopus 로고    scopus 로고
    • Scheduling with inserted idle time: problem taxonomy and literature review
    • Kanet, J.J. and Sridharan, V. (2000) ‘Scheduling with inserted idle time: problem taxonomy and literature review’, Operations Research, Vol. 48, pp.99–110.
    • (2000) Operations Research , vol.48 , pp. 99-110
    • Kanet, J.J.1    Sridharan, V.2
  • 7
    • 0028734441 scopus 로고
    • Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates
    • Kim, Y.D. and Yano, C.A. (1994) ‘Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates’, Naval Research Logistics, Vol. 41, pp.913–933.
    • (1994) Naval Research Logistics , vol.41 , pp. 913-933
    • Kim, Y.D.1    Yano, C.A.2
  • 8
    • 13844249320 scopus 로고
    • A pressing matter
    • Korman, K. (1994) ‘A pressing matter’, Video, pp.46–50.
    • (1994) Video , pp. 46-50
    • Korman, K.1
  • 9
    • 33749032686 scopus 로고
    • Group Technology and Cellular Manufacturing in the Westvaco Los Angeles VH Department
    • School of Business, University of Southern California
    • Landis, K. (1993) Group Technology and Cellular Manufacturing in the Westvaco Los Angeles VH Department, Project report in IOM 581, School of Business, University of Southern California.
    • (1993) Project report in IOM
    • Landis, K.1
  • 10
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • Ow, P.S. and Morton, T.E. (1989) ‘The single machine early/tardy problem’, Management Science, Vol. 35, pp.177–191.
    • (1989) Management Science , vol.35 , pp. 177-191
    • Ow, P.S.1    Morton, T.E.2
  • 11
    • 0037121183 scopus 로고    scopus 로고
    • Minimizing the sum of squares lateness on a single machine
    • Schaller, J. (2002) ‘Minimizing the sum of squares lateness on a single machine’, European Journal of Operational Research, Vol. 143, pp.64–79.
    • (2002) European Journal of Operational Research , vol.143 , pp. 64-79
    • Schaller, J.1
  • 12
    • 2342473349 scopus 로고    scopus 로고
    • Single machine scheduling with early and quadratic tardy penalties
    • Schaller, J. (2004) ‘Single machine scheduling with early and quadratic tardy penalties’, Computers and Industrial Engineering, Vol. 46, pp.511–532.
    • (2004) Computers and Industrial Engineering , vol.46 , pp. 511-532
    • Schaller, J.1
  • 13
    • 33846116652 scopus 로고    scopus 로고
    • A comparison of lower bounds for the single-machine early/tardy problem
    • Schaller, J. (2007) ‘A comparison of lower bounds for the single-machine early/tardy problem’, Computers and Operations Research, Vol. 34, pp.2279–2292.
    • (2007) Computers and Operations Research , vol.34 , pp. 2279-2292
    • Schaller, J.1
  • 14
    • 0030125484 scopus 로고
    • Minimizing a weighted quadratic function of job lateness in the single machine system
    • Sen, T., Dileepan, P. and Lind, M.R. (1995) ‘Minimizing a weighted quadratic function of job lateness in the single machine system’, International Journal of Production Economics, Vol. 42, pp.237–243.
    • (1995) International Journal of Production Economics , vol.42 , pp. 237-243
    • Sen, T.1    Dileepan, P.2    Lind, M.R.3
  • 15
    • 0032114993 scopus 로고    scopus 로고
    • A heuristic to minimize a quadratic function of job lateness on a single machine
    • Su, L-H. and Chang, P-C. (1998) ‘A heuristic to minimize a quadratic function of job lateness on a single machine’, International Journal of Production Economics, Vol. 55, pp.169–175.
    • (1998) International Journal of Production Economics , vol.55 , pp. 169-175
    • Su, L.-H.1    Chang, P.-C.2
  • 16
    • 0032628094 scopus 로고    scopus 로고
    • Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness
    • Sun, X., Noble, J.S. and Klein, C.M. (1999) ‘Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness’, IIE Transactions, Vol. 31, pp.113–124.
    • (1999) IIE Transactions , vol.31 , pp. 113-124
    • Sun, X.1    Noble, J.S.2    Klein, C.M.3
  • 18
    • 84969446323 scopus 로고    scopus 로고
    • An exact approach for the single machine scheduling problem with linear early and quadratic tardy penalties
    • Valente, J.M.S. (to appear) ‘An exact approach for the single machine scheduling problem with linear early and quadratic tardy penalties’, Asia-Pacific Journal of Operational Research.
    • Asia-Pacific Journal of Operational Research
    • Valente, J.M.S.1
  • 19
    • 4744370447 scopus 로고    scopus 로고
    • Improved heuristics for the early/tardy scheduling problem with no idle time
    • Valente, J.M.S. and Alves, R.A.F.S. (2005) ‘Improved heuristics for the early/tardy scheduling problem with no idle time’, Computers and Operations Research, Vol. 32, pp.557–569.
    • (2005) Computers and Operations Research , vol.32 , pp. 557-569
    • Valente, J.M.S.1    Alves, R.A.F.S.2
  • 20
    • 84969446326 scopus 로고    scopus 로고
    • Heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties
    • Valente, J.M.S. and Alves, R.A.F.S. (to appear) ‘Heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties’, Computers and Operations Research.
    • Computers and Operations Research
    • Valente, J.M.S.1    Alves, R.A.F.S.2
  • 21
    • 0032770980 scopus 로고    scopus 로고
    • Improved heuristics for the n-job single-machine weighted tardiness problem
    • Volgenant, A. and Teerhuis, E. (1999) ‘Improved heuristics for the n-job single-machine weighted tardiness problem’, Computers and Operations Research, Vol. 26, pp.35–44.
    • (1999) Computers and Operations Research , vol.26 , pp. 35-44
    • Volgenant, A.1    Teerhuis, E.2
  • 22
    • 0036626376 scopus 로고    scopus 로고
    • The production of several items in a single facility with linearly changing demand rates
    • Wagner, B.J., Davis, D.J. and Kher, H. (2002) ‘The production of several items in a single facility with linearly changing demand rates’, Decision Sciences, Vol. 33, pp.317–346.
    • (2002) Decision Sciences , vol.33 , pp. 317-346
    • Wagner, B.J.1    Davis, D.J.2    Kher, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.