메뉴 건너뛰기




Volumn 2, Issue 3, 2008, Pages 231-252

Deadlock-free scheduling of flexible job shops with limited capacity buffers

Author keywords

Dadlock free scheduling; Insertion algorithm; Job shop; Limited buffer; Mathematical formulations; MIP; Mixed integer programming; Rank matrix

Indexed keywords

ALGORITHMS; INTEGER PROGRAMMING; MATHEMATICAL MODELS; MATRIX ALGEBRA; SCHEDULING;

EID: 41749111378     PISSN: 17515254     EISSN: 17515262     Source Type: Journal    
DOI: 10.1504/EJIE.2008.017685     Document Type: Article
Times cited : (15)

References (29)
  • 1
    • 0030289711 scopus 로고    scopus 로고
    • Lot scheduling in a two-machine cell with swapping devices
    • Agnetis, A., Pacciarelli, D. and Rossi, F. (1996) 'Lot scheduling in a two-machine cell with swapping devices', IIE Transactions, Vol. 28, pp.911-917.
    • (1996) IIE Transactions , vol.28 , pp. 911-917
    • Agnetis, A.1    Pacciarelli, D.2    Rossi, F.3
  • 2
    • 0038522575 scopus 로고    scopus 로고
    • Insertion techniques for static and dynamic resource-constrained project scheduling
    • Artigues, C., Philippe, M. and Reusser, S. (2003) 'Insertion techniques for static and dynamic resource-constrained project scheduling', European Journal of Operational Research, Vol. 149, pp.249-267.
    • (2003) European Journal of Operational Research , vol.149 , pp. 249-267
    • Artigues, C.1    Philippe, M.2    Reusser, S.3
  • 3
    • 0034561509 scopus 로고    scopus 로고
    • A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
    • Artigues, C. and Roubellat, F. (2000) 'A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes', European Journal of Operational Research, Vol. 127, pp.297-316.
    • (2000) European Journal of Operational Research , vol.127 , pp. 297-316
    • Artigues, C.1    Roubellat, F.2
  • 4
    • 0036507645 scopus 로고    scopus 로고
    • An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependant setup times
    • Artigues, C. and Roubellat, F. (2002) 'An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependant setup times', Production Planning & Control, Vol. 13, pp.175-186.
    • (2002) Production Planning & Control , vol.13 , pp. 175-186
    • Artigues, C.1    Roubellat, F.2
  • 5
    • 0031362845 scopus 로고    scopus 로고
    • Deadlock analysis of Petri nets using siphons and mathematical programming
    • Chu, F. and Xie, X-L. (1997) 'Deadlock analysis of Petri nets using siphons and mathematical programming', IEEE Transactions on Robotics and Automation, Vol. 13, pp.793-804.
    • (1997) IEEE Transactions on Robotics and Automation , vol.13 , pp. 793-804
    • Chu, F.1    Xie, X.-L.2
  • 6
    • 0032273451 scopus 로고    scopus 로고
    • Scheduling and deadlock avoidance of a flexible manufacturing system
    • Man and Cybernetics
    • Damasceno, B.C. and Xie, X. (1998) 'Scheduling and deadlock avoidance of a flexible manufacturing system', Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, Vol. 1, pp.564-569.
    • (1998) Proceedings of the IEEE International Conference on Systems , vol.1 , pp. 564-569
    • Damasceno, B.C.1    Xie, X.2
  • 9
    • 33750453739 scopus 로고    scopus 로고
    • Feasible insertions in job shop scheduling, short cycles and stable sets
    • Gröflin, H. and Klinkert, A. (2007) 'Feasible insertions in job shop scheduling, short cycles and stable sets', European Journal of Operational Research, Vol. 177, pp.763-785.
    • (2007) European Journal of Operational Research , vol.177 , pp. 763-785
    • Gröflin, H.1    Klinkert, A.2
  • 10
    • 3042586002 scopus 로고    scopus 로고
    • Deadlock-free scheduling method for automated manufacturing systems using genetic algorithm and Petri nets
    • Huang, Z. and Wu, Z. (2004a) 'Deadlock-free scheduling method for automated manufacturing systems using genetic algorithm and Petri nets', Proceedings of the IEEE International Conference on Robotics and Automation, Vol. 1, pp.566-571.
    • (2004) Proceedings of the IEEE International Conference on Robotics and Automation , vol.1 , pp. 566-571
    • Huang, Z.1    Wu, Z.2
  • 11
    • 3042570475 scopus 로고    scopus 로고
    • Deadlock-free scheduling method for automated manufacturing systems with limited central buffers
    • Huang, Z. and Wu, Z. (2004b) 'Deadlock-free scheduling method for automated manufacturing systems with limited central buffers', Proceedings of the IEEE International Conference on Robotics and Automation, Vol. 1, pp.560-565.
    • (2004) Proceedings of the IEEE International Conference on Robotics and Automation , vol.1 , pp. 560-565
    • Huang, Z.1    Wu, Z.2
  • 12
    • 0032044924 scopus 로고    scopus 로고
    • A mathematical model for job shop scheduling with multiple process plan consideration per job
    • Kim, K-H. and Egbelu, P.J. (1998) 'A mathematical model for job shop scheduling with multiple process plan consideration per job', Production Planning and Control, Vol. 9, pp.250-259.
    • (1998) Production Planning and Control , vol.9 , pp. 250-259
    • Kim, K.-H.1    Egbelu, P.J.2
  • 13
    • 0032690982 scopus 로고    scopus 로고
    • Scheduling in a production environment with multiple process plans per job
    • Kim, K-H. and Egbelu, P.J. (1999) 'Scheduling in a production environment with multiple process plans per job', International Journal of Production Research, Vol. 37, pp.2725-2753.
    • (1999) International Journal of Production Research , vol.37 , pp. 2725-2753
    • Kim, K.-H.1    Egbelu, P.J.2
  • 14
    • 84867956402 scopus 로고    scopus 로고
    • A lower bound for the job insertion problem
    • Kis, T. and Hertz, A. (2003) 'A lower bound for the job insertion problem', Discrete Applied Mathematics, Vol. 128, pp.395-419.
    • (2003) Discrete Applied Mathematics , vol.128 , pp. 395-419
    • Kis, T.1    Hertz, A.2
  • 15
    • 0026946377 scopus 로고
    • An improved formulation for the job-shop scheduling problem
    • Liao, C-J. and You, C-T. (1992) 'An improved formulation for the job-shop scheduling problem', Journal of Operational Research Society Vol. 43, pp.1047-1054.
    • (1992) Journal of Operational Research Society , vol.43 , pp. 1047-1054
    • Liao, C.-J.1    You, C.-T.2
  • 16
    • 0033350650 scopus 로고    scopus 로고
    • Scheduling for production systems with limited buffers
    • Man, and Cybernetics
    • Liljenvall, T. (1999) 'Scheduling for production systems with limited buffers', Proceedings of the IEEE International Conference on Systems, Man, and Cybernetics, Vol. 6, pp.469-474.
    • (1999) Proceedings of the IEEE International Conference on Systems , vol.6 , pp. 469-474
    • Liljenvall, T.1
  • 17
    • 0035836306 scopus 로고    scopus 로고
    • Mathematical modelling and heuristic approaches to scheduling problems in an FMS environment
    • Low, C. and Wu, T-H. (2001) 'Mathematical modelling and heuristic approaches to scheduling problems in an FMS environment', International Journal of Production Research, Vol. 39, pp.689-708.
    • (2001) International Journal of Production Research , vol.39 , pp. 689-708
    • Low, C.1    Wu, T.-H.2
  • 18
    • 27944475064 scopus 로고    scopus 로고
    • Mathematical modelling of multi-objective job shop scheduling with dependant setups and re-entrant operations
    • Low, C., Wu, T-H. and Hsu, C-H. (2005) 'Mathematical modelling of multi-objective job shop scheduling with dependant setups and re-entrant operations', International Journal of Advanced Manufacturing Technology, Vol. 27, pp.181-189.
    • (2005) International Journal of Advanced Manufacturing Technology , vol.27 , pp. 181-189
    • Low, C.1    Wu, T.-H.2    Hsu, C.-H.3
  • 19
    • 0035482220 scopus 로고    scopus 로고
    • A taboo search approach for deadlock-free scheduling of automated manufacturing systems
    • Mati, Y., Rezg, N. and Xie, X. (2001a) 'A taboo search approach for deadlock-free scheduling of automated manufacturing systems', Journal of Intelligent Manufacturing, Vol. 12, pp.535-552.
    • (2001) Journal of Intelligent Manufacturing , vol.12 , pp. 535-552
    • Mati, Y.1    Rezg, N.2    Xie, X.3
  • 20
    • 0035705696 scopus 로고    scopus 로고
    • Geometric approach and Taboo search for scheduling flexible manufacturing systems
    • Mati, Y., Rezg, N. and Xie, X. (2001b) 'Geometric approach and Taboo search for scheduling flexible manufacturing systems', IEEE Transactions on Robotics and Automation, Vol. 17, pp.805-818.
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , pp. 805-818
    • Mati, Y.1    Rezg, N.2    Xie, X.3
  • 21
    • 0345872345 scopus 로고    scopus 로고
    • An approach based on operation insertion for the one-machine real-time scheduling
    • Ourari, S. and Bouzonia, B. (2003) 'An approach based on operation insertion for the one-machine real-time scheduling', International Journal of Robotics and Automation, Vol. 18, pp.185-190.
    • (2003) International Journal of Robotics and Automation , vol.18 , pp. 185-190
    • Ourari, S.1    Bouzonia, B.2
  • 22
    • 7544244249 scopus 로고    scopus 로고
    • Mixed binary integer programming formulations for the re-entrant job shop scheduling problem
    • Pan, J.C-H. and Chen, J-S. (2005) 'Mixed binary integer programming formulations for the re-entrant job shop scheduling problem', Computers and Operations Research, Vol. 32, pp.1197-1212.
    • (2005) Computers and Operations Research , vol.32 , pp. 1197-1212
    • Pan, J.C.-H.1    Chen, J.-S.2
  • 23
  • 24
    • 0034209871 scopus 로고    scopus 로고
    • Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
    • Sawik, T. (2000) 'Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers', Mathematical and Computer Modeling, Vol. 31, pp.39-52.
    • (2000) Mathematical and Computer Modeling , vol.31 , pp. 39-52
    • Sawik, T.1
  • 25
    • 27944486101 scopus 로고    scopus 로고
    • Deadlock-free scheduling methods for FMSs using Beam search
    • Man, and Cybernetics
    • Shi, X. and Wu, Z. (2005) 'Deadlock-free scheduling methods for FMSs using Beam search', Proceedings of the IEEE International Conference on Systems, Man, and Cybernetics, Vol. 2, pp.1188-1193.
    • (2005) Proceedings of the IEEE International Conference on Systems , vol.2 , pp. 1188-1193
    • Shi, X.1    Wu, Z.2
  • 26
    • 0033283788 scopus 로고    scopus 로고
    • On the application of insertion techniques for job shop problems with setup times
    • Sotskov, Y.N., Tautenhahn, T. and Werner, F. (1999) 'On the application of insertion techniques for job shop problems with setup times', RAIRO Recherche Operationnelle, Vol. 33, pp.209-245.
    • (1999) RAIRO Recherche Operationnelle , vol.33 , pp. 209-245
    • Sotskov, Y.N.1    Tautenhahn, T.2    Werner, F.3
  • 28
    • 0000079325 scopus 로고
    • Insertion techniques for the heuristic solution of the job shop problem
    • Werner, F. and Winkler, A. (1995) 'Insertion techniques for the heuristic solution of the job shop problem', Discrete Applied Mathematics, Vol. 58, pp.191-211.
    • (1995) Discrete Applied Mathematics , vol.58 , pp. 191-211
    • Werner, F.1    Winkler, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.