-
1
-
-
18144425787
-
Collision free path planning of cooperative crane manipulators using genetic algorithm
-
Ali, M. S., Babu, N. R. & Varghese, K. (2005), Collision free path planning of cooperative crane manipulators using genetic algorithm, Journal of Computing in Civil Engineering, 19(2), 182-93.
-
(2005)
Journal of Computing in Civil Engineering
, vol.19
, Issue.2
, pp. 182-193
-
-
Ali, M.S.1
Babu, N.R.2
Varghese, K.3
-
2
-
-
60749133385
-
Summary of modeling and simulation for NIST RoboCrane applications
-
in Detroit, MI, September 29-October 3
-
Amatucci, E., Bostelman, R., Dagalakis, N. & Tsai, T. (1997), Summary of modeling and simulation for NIST RoboCrane applications, in Proceedings of the 1997 Deneb International Simulation Conference and Technology Showcase, Detroit, MI, September 29-October 3.
-
(1997)
Proceedings of the 1997 Deneb International Simulation Conference and Technology Showcase
-
-
Amatucci, E.1
Bostelman, R.2
Dagalakis, N.3
Tsai, T.4
-
4
-
-
0031259167
-
On-line assistance for crane operators
-
Bernold, L. E., Lorenc, S. J. & Luces, E. (1997), On-line assistance for crane operators, Journal of Computing in Civil Engineering, 11(4), 248-59.
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.4
, pp. 248-259
-
-
Bernold, L.E.1
Lorenc, S.J.2
Luces, E.3
-
5
-
-
60749102564
-
-
Morgan Kaufmann Publishers Inc, San Francisco, CA
-
Champlain, M. & Patrick, G. B. (2005), C# 2.0: Practical Guide for Programmers, Morgan Kaufmann Publishers Inc, San Francisco, CA.
-
(2005)
C# 2.0: Practical Guide for Programmers
-
-
Champlain, M.1
Patrick, G.B.2
-
6
-
-
0036028115
-
Integrating barcode and GIS for monitoring construction progress
-
Cheng, M. Y. & Chen, J. C. (2002), Integrating barcode and GIS for monitoring construction progress, Automation in Construction, 11, 23-33.
-
(2002)
Automation in Construction
, vol.11
, pp. 23-33
-
-
Cheng, M.Y.1
Chen, J.C.2
-
7
-
-
60749125945
-
"Physics-Based Simulation of Detailed Erection Activities of Construction Cranes"
-
Master Thesis, Department of Civil Engineering, National Taiwan University, Taiwan
-
Chi, H. L. (2007), "Physics-Based Simulation of Detailed Erection Activities of Construction Cranes", Master Thesis, Department of Civil Engineering, National Taiwan University, Taiwan.
-
(2007)
-
-
Chi, H.L.1
-
8
-
-
0026172694
-
A model for determining optimum crane position
-
in Birmingham, U.K
-
Choi, C. W. & Harris, F. C. (1991), A model for determining optimum crane position, in Proceedings of Institution in Civil Engineers, Part 1, 627-34, Birmingham, U.K.
-
(1991)
Proceedings of Institution in Civil Engineers
, Issue.PART 1
, pp. 627-634
-
-
Choi, C.W.1
Harris, F.C.2
-
9
-
-
0004070667
-
-
Prentice-Hall, Upper Saddle River, NJ, USA
-
Chopra, K. A. (2000), Dynamics of Structures: Theory and Applications to Earthquake Engineering, Prentice-Hall, Upper Saddle River, NJ, USA.
-
(2000)
Dynamics of Structures: Theory and Applications to Earthquake Engineering
-
-
Chopra, K.A.1
-
11
-
-
85103590248
-
A kinematic notation for lower-pair mechanism based on matrices
-
Denavit, J. & Hartenberg, R. S. (1955), A kinematic notation for lower-pair mechanism based on matrices, Journal of Applied Mechanics, 215-21.
-
(1955)
Journal of Applied Mechanics
, pp. 215-221
-
-
Denavit, J.1
Hartenberg, R.S.2
-
12
-
-
78649324741
-
A model for the selection of the optimum crane for construction sites
-
Furusaka, S. & Gray, C. (1984), A model for the selection of the optimum crane for construction sites, Construction Management and Economics, 2, 157-76.
-
(1984)
Construction Management and Economics
, vol.2
, pp. 157-176
-
-
Furusaka, S.1
Gray, C.2
-
13
-
-
0000096763
-
A systematic approach to the selection of an appropriate crane for a construction site
-
Gray, C. & Little, J. (1985), A systematic approach to the selection of an appropriate crane for a construction site, Construction Management and Economics, 3, 121-44.
-
(1985)
Construction Management and Economics
, vol.3
, pp. 121-144
-
-
Gray, C.1
Little, J.2
-
14
-
-
0032634048
-
A fuzzy logic approach to the selection of cranes
-
Hanna, A. S. & Lotfallah, W. B. (1999), A fuzzy logic approach to the selection of cranes, Automation in Construction, 8(5), 597-608.
-
(1999)
Automation in Construction
, vol.8
, Issue.5
, pp. 597-608
-
-
Hanna, A.S.1
Lotfallah, W.B.2
-
15
-
-
14644425537
-
-
3rd edn., Prentice Hall, NJ
-
Hearn, D. & Baker, M. P. (2003), Computer Graphics with OpenGL, 3rd edn., Prentice Hall, NJ.
-
(2003)
Computer Graphics With OpenGL
-
-
Hearn, D.1
Baker, M.P.2
-
16
-
-
1842832075
-
Trends of 4D CAD applications for construction planning
-
Heesom, D. & Mahdjoubi, L. (2004), Trends of 4D CAD applications for construction planning, Construction Management and Economics, 22(2), 171-82.
-
(2004)
Construction Management and Economics
, vol.22
, Issue.2
, pp. 171-182
-
-
Heesom, D.1
Mahdjoubi, L.2
-
17
-
-
60749136709
-
-
New Riders Press
-
Hubbell, J. & Boardman, T. (1999), Inside 3D Studio MAX 3 Modeling, Materials, and Rendering, New Riders Press.
-
(1999)
Inside 3D Studio MAX 3 Modeling, Materials, and Rendering
-
-
Hubbell, J.1
Boardman, T.2
-
18
-
-
26644458125
-
Dynamic 3D visualization of articulated construction equipment
-
Kamat, V. R. & Martinez, J. C. (2005), Dynamic 3D visualization of articulated construction equipment, Journal of Computing in Civil Engineering, 19(4), 356-68.
-
(2005)
Journal of Computing in Civil Engineering
, vol.19
, Issue.4
, pp. 356-368
-
-
Kamat, V.R.1
Martinez, J.C.2
-
19
-
-
33744547057
-
Planning and visualization for automated robotic crane erection processes in construction
-
Kang, S. C. & Miranda, E. (2006), Planning and visualization for automated robotic crane erection processes in construction, Automation in Construction, 15(4), 398-414.
-
(2006)
Automation in Construction
, vol.15
, Issue.4
, pp. 398-414
-
-
Kang, S.C.1
Miranda, E.2
-
20
-
-
45749134660
-
Computational methods for coordinating multiple cranes
-
Kang, S. C. & Miranda, E. (2008), Computational methods for coordinating multiple cranes, Journal of Computing in Civil Engineering, 22(4), 252-63.
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.4
, pp. 252-263
-
-
Kang, S.C.1
Miranda, E.2
-
21
-
-
33748300746
-
Improving tower crane productivity using wireless technology
-
Lee, U. K., Kang, K. C., Kim, G. H. & Cho, H. H. (2006), Improving tower crane productivity using wireless technology, Computer-Aided Civil and Infrastructure Engineering, 21(8), 594-604.
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.8
, pp. 594-604
-
-
Lee, U.K.1
Kang, K.C.2
Kim, G.H.3
Cho, H.H.4
-
22
-
-
0033341078
-
Models for assessing hoisting times of tower cranes
-
Leung, W. T. & Tam, C. M. (1999), Models for assessing hoisting times of tower cranes, Journal of Construction Engineering and Management, 125(6), 385-91.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 385-391
-
-
Leung, W.T.1
Tam, C.M.2
-
23
-
-
0000597359
-
Multiple heavy lifts optimization
-
Lin, K. & Haas, C. (1996), Multiple heavy lifts optimization, Journal of Construction Engineering and Management, 122(4), 354-62.
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.4
, pp. 354-362
-
-
Lin, K.1
Haas, C.2
-
24
-
-
0033705724
-
Using VRML in Construction Industry Applications
-
in Monterey, CA, February 21-24
-
Lipman, R. R. & Reed, K. A. (2000), Using VRML in Construction Industry Applications, in Proceedings of Web3D: VRML 2000 Symposium, Monterey, CA, February 21-24, 1-7.
-
(2000)
Proceedings of Web3D: VRML 2000 Symposium
, pp. 1-7
-
-
Lipman, R.R.1
Reed, K.A.2
-
25
-
-
0029236197
-
Construction crane operation simulation
-
in Atlanta, June 5-8
-
Liu, L. Y. (1995), Construction crane operation simulation, in Proceedings of second Congress in Computing in Civil Engineering, 2, Atlanta, June 5-8, 1420-6.
-
(1995)
Proceedings of Second Congress in Computing in Civil Engineering
, vol.2
, pp. 1420-1426
-
-
Liu, L.Y.1
-
26
-
-
0037332784
-
Monitoring labor inputs: Automated-data-collection model and enabling technologies
-
Navon, R. & Goldschmidt, E. (2003), Monitoring labor inputs: automated-data-collection model and enabling technologies, Automation in Construction, 12(2), 185-199.
-
(2003)
Automation in Construction
, vol.12
, Issue.2
, pp. 185-199
-
-
Navon, R.1
Goldschmidt, E.2
-
29
-
-
0028599007
-
Graphical visualization for planning heavy lifts
-
in ASCE, Washington DC, June
-
O'Connor, J. T., Dharwadkar, P. V., Varghese, K. & Gatton, T. M. (1994), Graphical visualization for planning heavy lifts, in Proceedings of theFirst Congress on Computing in Civil Engineering, ASCE, Washington DC, June.
-
(1994)
Proceedings of TheFirst Congress on Computing in Civil Engineering
-
-
O'Connor, J.T.1
Dharwadkar, P.V.2
Varghese, K.3
Gatton, T.M.4
-
30
-
-
0033707986
-
The computer integrated road construction project
-
Peyret, F., Jurasz, J., Carrel, A., Zekri, E. & Gorham, B. (2000), The computer integrated road construction project, Automation in Construction, 9(5-6), 447-61.
-
(2000)
Automation in Construction
, vol.9
, Issue.5-6
, pp. 447-461
-
-
Peyret, F.1
Jurasz, J.2
Carrel, A.3
Zekri, E.4
Gorham, B.5
-
31
-
-
0004073074
-
-
3rd edn., Microsoft Press, Redmond, Washington
-
Platt, S. D. (2003), Introducing Microsoft. Net, 3rd edn., Microsoft Press, Redmond, Washington.
-
(2003)
Introducing Microsoft. Net
-
-
Platt, S.D.1
-
32
-
-
0036838279
-
Automated path planning for mobile crane lifts
-
Reddy, R. & Varghese, K. (2002), Automated path planning for mobile crane lifts, Computer-Aided Civil and Infrastructure Engineering, 17(6), 439-48.
-
(2002)
Computer-Aided Civil and Infrastructure Engineering
, vol.17
, Issue.6
, pp. 439-448
-
-
Reddy, R.1
Varghese, K.2
-
33
-
-
18744383106
-
Feasibility of automated monitoring of lifting equipment in support of project control
-
Sacks, R., Navon, R., Brodetskaia, I. & Shapira, A. (2005), Feasibility of automated monitoring of lifting equipment in support of project control, Journal of Construction Engineering and Management, 131(5), 604-14.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.5
, pp. 604-614
-
-
Sacks, R.1
Navon, R.2
Brodetskaia, I.3
Shapira, A.4
-
34
-
-
10444252035
-
-
4th edn., Addison-Wesley Professional, Boston
-
Shreiner, D., Woo, M., Davis, T. & Neider, J. (2003), OpenGL Programming Guide: The Official Guide to Learning OpenGL, Version 1.4, 4th edn., Addison-Wesley Professional, Boston.
-
(2003)
OpenGL Programming Guide: The Official Guide to Learning OpenGL
-
-
Shreiner, D.1
Woo, M.2
Davis, T.3
Neider, J.4
-
35
-
-
60749131235
-
-
Simlog. available at: accessed May 2, 2005
-
Simlog. (2005). Personal Tower Crane Simulator, available at: http://www.simlog.com/personal-tower-crane.html, accessed May 2, 2005.
-
(2005)
Personal Tower Crane Simulator
-
-
-
36
-
-
16444376810
-
Automated path planning of cooperative crane lifts using heuristic search
-
Sivakumar, P. L., Varghese, K. & Babu, N. R. (2003), Automated path planning of cooperative crane lifts using heuristic search, Journal of Computing in Civil Engineering, 17(3), 197-207.
-
(2003)
Journal of Computing in Civil Engineering
, vol.17
, Issue.3
, pp. 197-207
-
-
Sivakumar, P.L.1
Varghese, K.2
Babu, N.R.3
-
37
-
-
0033116409
-
NIST research toward construction site integration and automation
-
Stone, W., Reed, K., Chang, P., Pfeffer, L. & Jacoff, A. (1999), NIST research toward construction site integration and automation, Journal of Aerospace Engineering, 50-7.
-
(1999)
Journal of Aerospace Engineering
, pp. 50-57
-
-
Stone, W.1
Reed, K.2
Chang, P.3
Pfeffer, L.4
Jacoff, A.5
-
38
-
-
0036165741
-
Nonlinear models for predicting hoisting times of tower cranes
-
Tam, C. M., Leung, A. W. T. & Liu, D. K. (2002), Nonlinear models for predicting hoisting times of tower cranes, Journal of Computing in Civil Engineering, 16(1), 76-81.
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.1
, pp. 76-81
-
-
Tam, C.M.1
Leung, A.W.T.2
Liu, D.K.3
-
39
-
-
0035392349
-
Genetic algorithm for optimizing supply location around tower crane
-
Tam, C. M., Tong, K. L. & Chan, K. W. (2001), Genetic algorithm for optimizing supply location around tower crane, Journal of Construction Engineering and Management, 127(4), 315-21.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.4
, pp. 315-321
-
-
Tam, C.M.1
Tong, K.L.2
Chan, K.W.3
-
40
-
-
84887993345
-
Automated planning and visualization of mobile crane operation based on building and schedule information
-
in ICCCBE 2006, June 14-16, Montreal, Canada
-
Tantisevi, K. & Alinci, B. (2006), Automated planning and visualization of mobile crane operation based on building and schedule information, in Proceedings of the Joint International Conference on Computing and Decision Making in Civil and Building Engineering, ICCCBE 2006, June 14-16, Montreal, Canada.
-
(2006)
Proceedings of the Joint International Conference on Computing and Decision Making in Civil and Building Engineering
-
-
Tantisevi, K.1
Alinci, B.2
-
41
-
-
1642598653
-
Application of fuzzy logic to simulation for construction operations
-
Zhang, P., Tam, C. M. & Shi, J. (2003), Application of fuzzy logic to simulation for construction operations, Journal of Computing in Civil Engineering, 17(1), 38-45.
-
(2003)
Journal of Computing in Civil Engineering
, vol.17
, Issue.1
, pp. 38-45
-
-
Zhang, P.1
Tam, C.M.2
Shi, J.3
-
42
-
-
0033101167
-
Location optimization for a group of tower cranes
-
Zhang, P., Harris, F. C., Olomolaiye, P. O. & Holt, G. D. (1999), Location optimization for a group of tower cranes, Journal of Construction Engineering and Management, 125(2), 115-22.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.2
, pp. 115-122
-
-
Zhang, P.1
Harris, F.C.2
Olomolaiye, P.O.3
Holt, G.D.4
|