Expert judgement in forecasting construction project completion
-
Al-Tabtabai, H., Kartam, N., Flood, I., and Alex, A. P. (1997). "Expert judgement in forecasting construction project completion." Engrg., Constr. and Archit. Mgmt., 4(4), 271-293.
-
(1997)
Engrg., Constr. and Archit. Mgmt.
, vol.4
, Issue.4
, pp. 271-293
-
-
Al-Tabtabai, H.1
Kartam, N.2
Flood, I.3
Alex, A.P.4
-
2
-
-
0028494341
-
Hong Kong performance yardsticks for concrete placing during building construction
-
Hong Kong, August 1994
-
Anson, M., and Wang, S. Q. (1994). "Hong Kong performance yardsticks for concrete placing during building construction." Trans., Hong Kong, August 1994, 1-18.
-
(1994)
Trans.
, pp. 1-18
-
-
Anson, M.1
Wang, S.Q.2
-
3
-
-
0027664048
-
Dynamic damping of payload motion
-
ASCE
-
Beliveau, Y., Dixit, S., and Dal, T. (1993). "Dynamic damping of payload motion." J. Constr. Engrg. and Mgmt., ASCE, 119(3), 631-644.
-
(1993)
J. Constr. Engrg. and Mgmt.
, vol.119
, Issue.3
, pp. 631-644
-
-
Beliveau, Y.1
Dixit, S.2
Dal, T.3
-
4
-
-
84948516864
-
A study of the factors affecting construction duration in Hong Kong
-
Chan, D. W. M., and Kumaraswamy, M. M. (1995). "A study of the factors affecting construction duration in Hong Kong." Constr. Mgmt. and Economics, 13(4), 319-333.
-
(1995)
Constr. Mgmt. and Economics
, vol.13
, Issue.4
, pp. 319-333
-
-
Chan, D.W.M.1
Kumaraswamy, M.M.2
-
5
-
-
0026172694
-
A model for determining optimum crane position
-
June
-
Choi, C. W., and Harris, F. C. (1989). "A model for determining optimum crane position." Proc., Inst. of Civ. Engrs., 90, June, 627-634.
-
(1989)
Proc., Inst. of Civ. Engrs.
, vol.90
, pp. 627-634
-
-
Choi, C.W.1
Harris, F.C.2
-
6
-
-
0003865366
-
-
Construction Safety Assoc. of Ontario, Toronto, Ont.
-
Dickie, D. E. (1981). Crane handbook. Construction Safety Assoc. of Ontario, Toronto, Ont., 288-292.
-
(1981)
Crane Handbook
, pp. 288-292
-
-
Dickie, D.E.1
-
7
-
-
78649324741
-
A model for the selection of the optimum crane for construction sites
-
Furusaka, S., and Gray, C. (1984). "A model for the selection of the optimum crane for construction sites." Constr. Mgmt. and Economics, 2, 157-176.
-
(1984)
Constr. Mgmt. and Economics
, vol.2
, pp. 157-176
-
-
Furusaka, S.1
Gray, C.2
-
8
-
-
0000096763
-
A systematic approach to the selection of an appropriate crane for a construction site
-
Gray, C., and Little, J. (1985). "A systematic approach to the selection of an appropriate crane for a construction site." Constr. Mgmt. and Economics, 3, 121-144.
-
(1985)
Constr. Mgmt. and Economics
, vol.3
, pp. 121-144
-
-
Gray, C.1
Little, J.2
-
9
-
-
0020941725
-
Single crane location optimisation
-
ASCE
-
Rodriguez-Ramos, W. E., and Francis, R. L. (1983). "Single crane location optimisation." J. Constr. Engrg. and Mgmt., ASCE, 109(4), 387-397.
-
(1983)
J. Constr. Engrg. and Mgmt.
, vol.109
, Issue.4
, pp. 387-397
-
-
Rodriguez-Ramos, W.E.1
Francis, R.L.2
-
10
-
-
0030110489
-
A computer-based model for optimizing the location of a single tower crane
-
Zhang, P., Harris, F. C., and Olonolaiye, P. O. (1996). "A computer-based model for optimizing the location of a single tower crane." Build. Res. and Info., 24(2), 113-123.
-
(1996)
Build. Res. and Info.
, vol.24
, Issue.2
, pp. 113-123
-
-
Zhang, P.1
Harris, F.C.2
Olonolaiye, P.O.3
|