Volumn 23, Issue 1, 2009, Pages 104-115

A formal mapping-based approach for distributed schedule coordination on projects

Author keywords

Distributed processes; Process coordination; Project management; Scheduling

Indexed keywords

CONSTRUCTION INDUSTRY; PROJECT MANAGEMENT;

EID: 57549090622     PISSN: 14740346     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.aei.2008.07.004     Document Type: Article
Times cited : (6)

References (30)
  • 1
    • 39449106118 scopus 로고    scopus 로고
    • Challenges, approaches and architecture for distributed process integration in heterogeneous environments
    • O'Brien W.J., Hammer J., Siddiqui M.K., and Topsakal O. Challenges, approaches and architecture for distributed process integration in heterogeneous environments. Advanced Engineering Informatics 22 (2008) 28-44
    • (2008) Advanced Engineering Informatics , vol.22 , pp. 28-44
    • O'Brien, W.J.1    Hammer, J.2    Siddiqui, M.K.3    Topsakal, O.4
  • 6
    • 0026381933 scopus 로고
    • Construction scheduling. Principles, practices, and six case studies
    • Cole L.J.R. Construction scheduling. Principles, practices, and six case studies. Journal of Construction Engineering and Management 117 4 (1991) 579-588
    • (1991) Journal of Construction Engineering and Management , vol.117 , Issue.4 , pp. 579-588
    • Cole, L.J.R.1
  • 7
    • 33745292984 scopus 로고    scopus 로고
    • Survey of the construction industry relative to the use of CPM scheduling for construction projects
    • Galloway P.D. Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management 132 7 (2006) 697-711
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.7 , pp. 697-711
    • Galloway, P.D.1
  • 8
    • 84891338054 scopus 로고    scopus 로고
    • W.J. O'Brien, M.K. Siddiqui, T.-K. Wang, Process connectors: distributed schedule coordination via alternative exploration and evaluation, ASCE Computing in Civil Engineering, Pittsburgh, PA, 2007, pp. 355-363.
    • W.J. O'Brien, M.K. Siddiqui, T.-K. Wang, Process connectors: distributed schedule coordination via alternative exploration and evaluation, ASCE Computing in Civil Engineering, Pittsburgh, PA, 2007, pp. 355-363.
  • 9
    • 57549098912 scopus 로고    scopus 로고
    • W.J. O'Brien, T.-K. Wang, M.K. Siddiqui, J. Hammer, R. Wakefield, Process connectors: linking distributed processes, in: The Construction Supply Chain, Joint International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 2006, pp. 2960-2969.
    • W.J. O'Brien, T.-K. Wang, M.K. Siddiqui, J. Hammer, R. Wakefield, Process connectors: linking distributed processes, in: The Construction Supply Chain, Joint International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 2006, pp. 2960-2969.
  • 10
    • 57549101315 scopus 로고    scopus 로고
    • M.K. Siddiqui, W.J. O'Brien, T.-K. Wang, A mapping based approach to schedule integration, in: Heterogeneous Environments, Joint International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 2006, pp. 2615-2624.
    • M.K. Siddiqui, W.J. O'Brien, T.-K. Wang, A mapping based approach to schedule integration, in: Heterogeneous Environments, Joint International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 2006, pp. 2615-2624.
  • 11
    • 57549114188 scopus 로고    scopus 로고
    • Is scheduling a solved problem?
    • Kendall G., Burke E., Petrovic S., and Gendreau M. (Eds)
    • Smith S.F. Is scheduling a solved problem?. In: Kendall G., Burke E., Petrovic S., and Gendreau M. (Eds). Multidisciplinary Scheduling: Theory and Applications (2005) 3-18
    • (2005) Multidisciplinary Scheduling: Theory and Applications , pp. 3-18
    • Smith, S.F.1
  • 14
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng C.W., Liu L., and Burns S.A. Using genetic algorithms to solve construction time-cost trade-off problems. Journal of Computing in Civil Engineering 11 3 (1997) 184-189
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.W.1    Liu, L.2    Burns, S.A.3
  • 15
    • 0003267827 scopus 로고
    • Is Construction planning really doing its job? A critical examination of focus, role and process
    • Laufer A., and Tucker R. Is Construction planning really doing its job? A critical examination of focus, role and process. Construction Management and Economics 5 3 (1987) 243-246
    • (1987) Construction Management and Economics , vol.5 , Issue.3 , pp. 243-246
    • Laufer, A.1    Tucker, R.2
  • 16
    • 57549087520 scopus 로고    scopus 로고
    • S. Lichtenberg, Medieval remains in modern project management, in: Proceedings of IPMA World Congress, Rotterdam, 1985.
    • S. Lichtenberg, Medieval remains in modern project management, in: Proceedings of IPMA World Congress, Rotterdam, 1985.
  • 20
    • 0026850714 scopus 로고
    • Schedule 'games' people play, and some suggested 'remedies'
    • Zack Jr. J.G. Schedule 'games' people play, and some suggested 'remedies'. Journal of Management in Engineering 8 2 (1992) 138-152
    • (1992) Journal of Management in Engineering , vol.8 , Issue.2 , pp. 138-152
    • Zack Jr., J.G.1
  • 21
    • 2942750055 scopus 로고    scopus 로고
    • Multi-constraint information management and visualization for collaborative planning and control in construction, ITcon
    • Sriprasert E., and Dawood N. Multi-constraint information management and visualization for collaborative planning and control in construction, ITcon. Special Issue on eWork and eBusiness 8 (2003) 341-366
    • (2003) Special Issue on eWork and eBusiness , vol.8 , pp. 341-366
    • Sriprasert, E.1    Dawood, N.2
  • 22
    • 0142155982 scopus 로고    scopus 로고
    • Agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes
    • Kim K., and Paulson B.C. Agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes. Journal of Computing in Civil Engineering 17 1 (2003) 10-18
    • (2003) Journal of Computing in Civil Engineering , vol.17 , Issue.1 , pp. 10-18
    • Kim, K.1    Paulson, B.C.2
  • 23
    • 57549103077 scopus 로고    scopus 로고
    • IOS, Quantities and units - Part 11: Mathematical signs and symbols for use in the physical sciences and technology, International Organization for Standardization, Genáeve, Switzerland, 1992.
    • IOS, Quantities and units - Part 11: Mathematical signs and symbols for use in the physical sciences and technology, International Organization for Standardization, Genáeve, Switzerland, 1992.
  • 24
    • 0020849266 scopus 로고
    • Maintaining knowledge about temporal intervals
    • Allen J.F. Maintaining knowledge about temporal intervals. Communications of the ACM 26 11 (1983) 832-843
    • (1983) Communications of the ACM , vol.26 , Issue.11 , pp. 832-843
    • Allen, J.F.1
  • 26
    • 12344305389 scopus 로고    scopus 로고
    • Cost impacts, scheduling impacts, and the claims process during construction
    • Chester M., and Hendrickson C. Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management 131 1 (2005) 102-107
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 102-107
    • Chester, M.1    Hendrickson, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.