메뉴 건너뛰기




Volumn 131, Issue 1, 2005, Pages 102-107

Cost impacts, scheduling impacts, and the claims process during construction

Author keywords

Claims; Construction management; Cost control; Scheduling

Indexed keywords

CLAIMS; CONSTRUCTION MANAGEMENT; CONSTRUCTION PROJECTS; COST CONTROL;

EID: 12344305389     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:1(102)     Document Type: Article
Times cited : (39)

References (16)
  • 1
    • 0035454421 scopus 로고    scopus 로고
    • A methodology for determining price variation in project execution
    • Akpan, E. O. P., and Igwe, O. (2001). "A methodology for determining price variation in project execution." J. Constr. Eng. Manage., 127(5), 367-373.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.5 , pp. 367-373
    • Akpan, E.O.P.1    Igwe, O.2
  • 3
    • 84860080366 scopus 로고    scopus 로고
    • Calculating loss of productivity due to overtime using published charts-Fact or fiction
    • Revay and Associates Limited, Montréal
    • Brunies, R., and Eng, Z. E. (2003). "Calculating loss of productivity due to overtime using published charts-Fact or fiction." Technical Rep., Revay and Associates Limited, Montréal.
    • (2003) Technical Rep.
    • Brunies, R.1    Eng, Z.E.2
  • 4
    • 0036162657 scopus 로고    scopus 로고
    • Reasons for cost and schedule increase for engineer- Ing design projects
    • Chang, A. (2002). "Reasons for cost and schedule increase for engineer- ing design projects." J. Manage. Eng., 18(1), 29-36.
    • (2002) J. Manage. Eng. , vol.18 , Issue.1 , pp. 29-36
    • Chang, A.1
  • 6
    • 0032208519 scopus 로고    scopus 로고
    • A better way to estimate and mitigate disruption
    • Finke, M. (1998). "A better way to estimate and mitigate disruption." J. Constr. Eng. Manage., 124(6), 490-497.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 490-497
    • Finke, M.1
  • 7
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of work space conflicts in building construction
    • Guo, S.-J. (2002). "Identification and resolution of work space conflicts in building construction." J. Constr. Eng. Manage., 128(4), 287-295.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 287-295
    • Guo, S.-J.1
  • 8
    • 0032659199 scopus 로고    scopus 로고
    • Impact of change orders on labor efficiency for electrical construction
    • Hanna, A. S., Russell, J. S., Nordheim, E. V., and Bruggink, M. J. (1999). "Impact of change orders on labor efficiency for electrical construction." J. Constr. Eng. Manage., 125(4), 224-232.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 224-232
    • Hanna, A.S.1    Russell, J.S.2    Nordheim, E.V.3    Bruggink, M.J.4
  • 9
    • 11344268966 scopus 로고
    • Quantitative impacts of project change
    • Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • Ibbs, C. W., and Allen, W. E. (1995). "Quantitative impacts of project change." Source Document 108, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
    • (1995) Source Document , vol.108
    • Ibbs, C.W.1    Allen, W.E.2
  • 10
    • 0033342184 scopus 로고    scopus 로고
    • Generic methodology for analyzing delay claims
    • Kartam, S. (1999). "Generic methodology for analyzing delay claims." J. Constr. Eng. Manage., 125(6), 409-419.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 409-419
    • Kartam, S.1
  • 12
    • 0026173825 scopus 로고
    • Impact of change orders on construction productivity
    • Leonard, C., Moselhi, O., and Fazio, P. (1991). "Impact of change orders on construction productivity." Can. J. Civ. Eng., 18, 484-492.
    • (1991) Can. J. Civ. Eng. , vol.18 , pp. 484-492
    • Leonard, C.1    Moselhi, O.2    Fazio, P.3
  • 13
    • 84860077283 scopus 로고    scopus 로고
    • July 19, 2002
    • Pittsburgh Business Times (2002). "Pittsburgh office market still a bit weak." 〈http://www.bizjournals.eom/pittsburgh/stories/2002/07/15/daily48. html〉 (July 19, 2002).
    • (2002) Pittsburgh Office Market Still a Bit Weak
  • 14
    • 0034225578 scopus 로고    scopus 로고
    • Schedule acceleration, work flow, and labor productivity
    • Thomas, H. R. (2000). "Schedule acceleration, work flow, and labor productivity." J. Constr. Eng. Manage., 126(4), 261-267.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 261-267
    • Thomas, H.R.1
  • 15
    • 0029361062 scopus 로고
    • Quantitative effects of construction changes on labor productivity
    • Thomas, H. R., and Napolitan, C. L. (1995). "Quantitative effects of construction changes on labor productivity." J. Constr. Eng. Manage., 121(3), 290-296.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.3 , pp. 290-296
    • Thomas, H.R.1    Napolitan, C.L.2
  • 16
    • 0242560800 scopus 로고
    • Modification impact evaluation guide
    • Washington, D.C.
    • U.S. Army Corps of Engineers (1979). "Modification impact evaluation guide." Technical Rep. EP 415-1-3, Washington, D.C.
    • (1979) Technical Rep. , vol.EP 415-1-3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.