1
-
-
0011701850
-
An empirical investigation of different strategies for material requirements planning
-
BAHL, H. C., and RITZMAN, L. P., 1983, An empirical investigation of different strategies for material requirements planning. Journal of Operations Management, 3, 67-77.
-
(1983)
Journal of Operations Management
, vol.3
, pp. 67-77
-
-
Bahl, H.C.1
Ritzman, L.P.2
-
2
-
-
0027627202
-
The challenges of capacity planning
-
BAKKE, N. A., and HELLBERG, R., 1993, The challenges of capacity planning. International Journal of Production Economics, 30-31, 243-264.
-
(1993)
International Journal of Production Economics
, vol.30
, Issue.31
, pp. 243-264
-
-
Bakke, N.A.1
Hellberg, R.2
-
3
-
-
6244277927
-
Planning and Scheduling for Flexible Discrete Manufacturing. Phd Thesis
-
Enschede, The Netherlands
-
BOSSINK, G., 1992, Planning and Scheduling for Flexible Discrete Manufacturing. Phd Thesis, TechnicalUniversity of Twente, Enschede, The Netherlands.
-
(1992)
-
-
Bossink, G.1
-
4
-
-
6244287274
-
Architecture of a Factory Controller, Phd Thesis
-
Delft, The Netherlands
-
DRIFT, J. H. M., 1993, Architecture of a Factory Controller, Phd Thesis, Technical University of Delft, Delft, The Netherlands.
-
(1993)
-
-
Drift, J.H.M.1
-
5
-
-
0027555787
-
Cost-based scheduling of workers and equipment in a fabrication and assembly shop
-
FAALAND, B., and SCHMITT, T., 1993, Cost-based scheduling of workers and equipment in a fabrication and assembly shop. Operations Research, 41, 253-268.
-
(1993)
Operations Research
, vol.41
, pp. 253-268
-
-
Faaland, B.1
Schmitt, T.2
-
6
-
-
0002959778
-
A heuristic algorithm for capacity sensitive requirements planning
-
HARL, J. E., and RITZMAN, L. P., 1985, A heuristic algorithm for capacity sensitive requirements planning. Journal of Operations Management, 5, 309-326.
-
(1985)
Journal of Operations Management
, vol.5
, pp. 309-326
-
-
Harl, J.E.1
Ritzman, L.P.2
-
7
-
-
0020206915
-
Schedule based M.R.P.: An integrated approachto production scheduling and material requirements planning
-
HASTINGS, N. A., MARSHALL, P., and WILLIS, R. J., 1982, Schedule based M.R.P.: an integrated approachto production scheduling and material requirements planning. Journal of the Operational Research Society, 33, 1021-1029.
-
(1982)
Journal of the Operational Research Society
, vol.33
, pp. 1021-1029
-
-
Hastings, N.A.1
Marshall, P.2
Willis, R.J.3
-
8
-
-
0020305108
-
A heuristic algorithm for the multi-item lot-sizing problem with capacity constraints
-
KARNI, R., and ROLL, Y., 1982, A heuristic algorithm for the multi-item lot-sizing problem with capacity constraints. IIE Transactions, 14, 249-256.
-
(1982)
IIE Transactions
, vol.14
, pp. 249-256
-
-
Karni, R.1
Roll, Y.2
-
10
-
-
0025433556
-
Medium to short term finite capacity scheduling: A planning methodology for capacity constrained workshops
-
MCCARTHY, S. W., and BARBER, K. D., 1990, Medium to short term finite capacity scheduling: a planning methodology for capacity constrained workshops. Engineering Costs and Production Economics, 19, 189-199.
-
(1990)
Engineering Costs and Production Economics
, vol.19
, pp. 189-199
-
-
McCarthy, S.W.1
Barber, K.D.2
-
11
-
-
0003949709
-
Heuristic Scheduling Systems
-
New York, J. Wiley & Sons)
-
MORTON, T. E., and PENTICO, D. W., 1993, Heuristic Scheduling Systems, with Applications to Production Systems and Project Management (New York, J. Wiley & Sons).
-
(1993)
With Applications to Production Systems and Project Management
-
-
Morton, T.E.1
Pentico, D.W.2
-
12
-
-
0040362011
-
An experimental analysis of capacity- sensitive setup parameters for MRP lot sizing
-
RATURI, A. S., and HILL, A. V., 1989, An experimental analysis of capacity- sensitive setup parameters for MRP lot sizing. Decision Sciences, 19, 782-799.
-
(1989)
Decision Sciences
, vol.19
, pp. 782-799
-
-
Raturi, A.S.1
Hill, A.V.2
-
13
-
-
0026417693
-
Multi-item, multi-level lot sizing with an aggregate capacity constraint
-
ROLL, Y., and KARNI, R., 1991, Multi-item, multi-level lot sizing with an aggregate capacity constraint. European Journal of Operations Research, 51, 73-87.
-
(1991)
European Journal of Operations Research
, vol.51
, pp. 73-87
-
-
Roll, Y.1
Karni, R.2
-
14
-
-
84990557283
-
A new framework for manufacturing planning and control systems
-
SUM, C. C., and HILL, A. V., 1993, A new framework for manufacturing planning and control systems. Decision Sciences, 24, 739-760.
-
(1993)
Decision Sciences
, vol.24
, pp. 739-760
-
-
Sum, C.C.1
Hill, A.V.2
-
15
-
-
84985841623
-
The integration of cost and capacity considerations in material requirements planning systems
-
VERAL, E. A., and LAFORGE, L. R., 1990, The integration of cost and capacity considerations in material requirements planning systems. Decision Sciences, 21, 507-520.
-
(1990)
Decision Sciences
, vol.21
, pp. 507-520
-
-
Veral, E.A.1
Laforge, L.R.2
-
16
-
-
85008791498
-
A Review of Capacity Planning Techniques within Standard Software Packages. To appear in
-
WORTMANN, J. C., EUWE, M. J., TAAL, M., and WIERS, V. C. W., (Year), A Review of Capacity Planning Techniques within Standard Software Packages. To appear in Production
-
Production
-
-
|