1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, J., Balas, E. and Zawack, D. (1988) The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391-101.
-
(1988)
Management Science
, vol.34
, Issue.3
, pp. 391-1101
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
30244435608
-
Just-In-Time production of large assemblies
-
Institute for Systems Research, University of Maryland, College Park, MD
-
Agrawal, A., Harhalakis, G., Minis, I. and Nagi, R. (1994) Just-In-Time production of large assemblies. Technical Report No. TR 94-51, Institute for Systems Research, University of Maryland, College Park, MD.
-
(1994)
Technical Report No. TR 94-51
-
-
Agrawal, A.1
Harhalakis, G.2
Minis, I.3
Nagi, R.4
-
3
-
-
0040362442
-
A decomposition approach for the machine scheduling problem
-
Ashour, S. (1967) A decomposition approach for the machine scheduling problem. International Journal of Production Research, 6, 109-122.
-
(1967)
International Journal of Production Research
, vol.6
, pp. 109-122
-
-
Ashour, S.1
-
7
-
-
0020832935
-
Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
-
Billington, P.J., McClain, J.O. and Thomas, L.J. (1983) Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Management Science, 29(10), 1126-1141.
-
(1983)
Management Science
, vol.29
, Issue.10
, pp. 1126-1141
-
-
Billington, P.J.1
McClain, J.O.2
Thomas, L.J.3
-
8
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Boctor, F.F. (1990) Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research, 49, 3-9.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 3-9
-
-
Boctor, F.F.1
-
9
-
-
0000165767
-
An algorithm for solving the job shop problem
-
Carlier, J. and Pinson, E. (1989) An algorithm for solving the job shop problem. Management Science, 35(2), 164-176.
-
(1989)
Management Science
, vol.35
, Issue.2
, pp. 164-176
-
-
Carlier, J.1
Pinson, E.2
-
11
-
-
0008559997
-
Algorithms for project scheduling with resource constraints
-
Elsayed, E.A. (1982) Algorithms for project scheduling with resource constraints. International Journal of Production Research, 20, 95-103.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 95-103
-
-
Elsayed, E.A.1
-
13
-
-
3342887545
-
The interactive shop supervisor
-
Godin, V. and Jones C. (1969) The interactive shop supervisor. Industrial Engineering, 1, 16-22.
-
(1969)
Industrial Engineering
, vol.1
, pp. 16-22
-
-
Godin, V.1
Jones, C.2
-
14
-
-
3342912926
-
Optimized production timetable: A revolutionary program for industry
-
Oct 14-17, Los Angeles, CA
-
Goldratt, E. (1980) Optimized production timetable: a revolutionary program for industry, in APICS 23rd Annual Conference Proceedings Oct 14-17, Los Angeles, CA, 172-176.
-
(1980)
APICS 23rd Annual Conference Proceedings
, pp. 172-176
-
-
Goldratt, E.1
-
15
-
-
0000711418
-
A branch and bound solution to the general scheduling problem
-
Greenberg, H.H. (1968) A branch and bound solution to the general scheduling problem. Operations Research, 16, 353-361.
-
(1968)
Operations Research
, vol.16
, pp. 353-361
-
-
Greenberg, H.H.1
-
16
-
-
0001430010
-
Parallel sequencing and assembly line problems
-
Hu, T.C. (1961) Parallel sequencing and assembly line problems. Operations Research, 9(6), 841-848.
-
(1961)
Operations Research
, vol.9
, Issue.6
, pp. 841-848
-
-
Hu, T.C.1
-
18
-
-
0017679093
-
Job shop scheduling by implicit enumeration
-
Lageweg, B.J., Lenstra, J.K. and Rinnooy Kan, A.H.G. (1977) Job shop scheduling by implicit enumeration. Management Science, 24, 441-450.
-
(1977)
Management Science
, vol.24
, pp. 441-450
-
-
Lageweg, B.J.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
19
-
-
3342927417
-
-
Manufacturing Technology Information Analysis Center, Chicago, Illinois, Rep. MTIAC TA-85-04 October
-
Levulis, R.J. (1985) Finite capacity scheduling and simulation systems. Manufacturing Technology Information Analysis Center, Chicago, Illinois, Rep. MTIAC TA-85-04 (October).
-
(1985)
Finite Capacity Scheduling and Simulation Systems
-
-
Levulis, R.J.1
-
20
-
-
0027146758
-
Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
-
MacCarthy, B.L. and Liu, J. (1993) Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31(1), 59-79.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.1
, pp. 59-79
-
-
MacCarthy, B.L.1
Liu, J.2
-
21
-
-
0024731470
-
Scheduling mixed-model multilevel just-in-time production systems
-
Miltenburg, J. and Sinnamon, G. (1989) Scheduling mixed-model multilevel just-in-time production systems. International Journal of Production Research, 27(9), 1487-1509.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.9
, pp. 1487-1509
-
-
Miltenburg, J.1
Sinnamon, G.2
-
22
-
-
0000172494
-
Algorithms for scheduling multilevel just-in-time production systems
-
Miltenburg, J. and Sinnamon, G. (1992) Algorithms for scheduling multilevel just-in-time production systems. IIE Transactions, 24(2), 121-130.
-
(1992)
IIE Transactions
, vol.24
, Issue.2
, pp. 121-130
-
-
Miltenburg, J.1
Sinnamon, G.2
-
25
-
-
0000659781
-
A system for managing job shop production
-
Reiter, S. (1966) A system for managing job shop production. J. Business, 39(3), 371-393.
-
(1966)
J. Business
, vol.39
, Issue.3
, pp. 371-393
-
-
Reiter, S.1
-
26
-
-
0024112269
-
A recent survey of production scheduling
-
Rodammer, F.A. and White, K.P., Jr (1988) A recent survey of production scheduling. IEEE Transactions on Systems, Man, and Cybernetics, 18(6), 841-851.
-
(1988)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.18
, Issue.6
, pp. 841-851
-
-
Rodammer, F.A.1
White Jr., K.P.2
-
27
-
-
84974870375
-
Heuristic performance and network/resource characteristics in resource-constrained project scheduling
-
Ulusoy, G. and Ozdamar, L. (1989) Heuristic performance and network/resource characteristics in resource-constrained project scheduling. Journal of the Operational Research Society, 40(12), 1149-1152.
-
(1989)
Journal of the Operational Research Society
, vol.40
, Issue.12
, pp. 1149-1152
-
-
Ulusoy, G.1
Ozdamar, L.2
-
28
-
-
0021393367
-
Network programming models for production scheduling in multi-stage, multi-item capacitated systems
-
Zahorik, A., Thomas L.J. and Trigeiro, W.W. (1984) Network programming models for production scheduling in multi-stage, multi-item capacitated systems. Management Science, 30(3), 308-325.
-
(1984)
Management Science
, vol.30
, Issue.3
, pp. 308-325
-
-
Zahorik, A.1
Thomas, L.J.2
Trigeiro, W.W.3
|