메뉴 건너뛰기




Volumn 28, Issue 8, 1996, Pages 653-667

'Just-in-time' production of large assemblies

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; COMPUTER AIDED ANALYSIS; CRITICAL PATH ANALYSIS; EFFICIENCY; PLANNING; TIME SHARING SYSTEMS;

EID: 0030219108     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/15458830.1996.11770710     Document Type: Article
Times cited : (25)

References (28)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E. and Zawack, D. (1988) The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391-101.
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-1101
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 30244435608 scopus 로고
    • Just-In-Time production of large assemblies
    • Institute for Systems Research, University of Maryland, College Park, MD
    • Agrawal, A., Harhalakis, G., Minis, I. and Nagi, R. (1994) Just-In-Time production of large assemblies. Technical Report No. TR 94-51, Institute for Systems Research, University of Maryland, College Park, MD.
    • (1994) Technical Report No. TR 94-51
    • Agrawal, A.1    Harhalakis, G.2    Minis, I.3    Nagi, R.4
  • 3
    • 0040362442 scopus 로고
    • A decomposition approach for the machine scheduling problem
    • Ashour, S. (1967) A decomposition approach for the machine scheduling problem. International Journal of Production Research, 6, 109-122.
    • (1967) International Journal of Production Research , vol.6 , pp. 109-122
    • Ashour, S.1
  • 5
    • 0022060981 scopus 로고
    • Scheduling the general job shop
    • Barker, J.R. and McMahon, G.B. (1985) Scheduling the general job shop. Management Science, 31, 594-598.
    • (1985) Management Science , vol.31 , pp. 594-598
    • Barker, J.R.1    McMahon, G.B.2
  • 7
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
    • Billington, P.J., McClain, J.O. and Thomas, L.J. (1983) Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Management Science, 29(10), 1126-1141.
    • (1983) Management Science , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 8
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • Boctor, F.F. (1990) Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research, 49, 3-9.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-9
    • Boctor, F.F.1
  • 9
    • 0000165767 scopus 로고
    • An algorithm for solving the job shop problem
    • Carlier, J. and Pinson, E. (1989) An algorithm for solving the job shop problem. Management Science, 35(2), 164-176.
    • (1989) Management Science , vol.35 , Issue.2 , pp. 164-176
    • Carlier, J.1    Pinson, E.2
  • 11
    • 0008559997 scopus 로고
    • Algorithms for project scheduling with resource constraints
    • Elsayed, E.A. (1982) Algorithms for project scheduling with resource constraints. International Journal of Production Research, 20, 95-103.
    • (1982) International Journal of Production Research , vol.20 , pp. 95-103
    • Elsayed, E.A.1
  • 13
    • 3342887545 scopus 로고
    • The interactive shop supervisor
    • Godin, V. and Jones C. (1969) The interactive shop supervisor. Industrial Engineering, 1, 16-22.
    • (1969) Industrial Engineering , vol.1 , pp. 16-22
    • Godin, V.1    Jones, C.2
  • 14
    • 3342912926 scopus 로고
    • Optimized production timetable: A revolutionary program for industry
    • Oct 14-17, Los Angeles, CA
    • Goldratt, E. (1980) Optimized production timetable: a revolutionary program for industry, in APICS 23rd Annual Conference Proceedings Oct 14-17, Los Angeles, CA, 172-176.
    • (1980) APICS 23rd Annual Conference Proceedings , pp. 172-176
    • Goldratt, E.1
  • 15
    • 0000711418 scopus 로고
    • A branch and bound solution to the general scheduling problem
    • Greenberg, H.H. (1968) A branch and bound solution to the general scheduling problem. Operations Research, 16, 353-361.
    • (1968) Operations Research , vol.16 , pp. 353-361
    • Greenberg, H.H.1
  • 16
    • 0001430010 scopus 로고
    • Parallel sequencing and assembly line problems
    • Hu, T.C. (1961) Parallel sequencing and assembly line problems. Operations Research, 9(6), 841-848.
    • (1961) Operations Research , vol.9 , Issue.6 , pp. 841-848
    • Hu, T.C.1
  • 19
    • 3342927417 scopus 로고
    • Manufacturing Technology Information Analysis Center, Chicago, Illinois, Rep. MTIAC TA-85-04 October
    • Levulis, R.J. (1985) Finite capacity scheduling and simulation systems. Manufacturing Technology Information Analysis Center, Chicago, Illinois, Rep. MTIAC TA-85-04 (October).
    • (1985) Finite Capacity Scheduling and Simulation Systems
    • Levulis, R.J.1
  • 20
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • MacCarthy, B.L. and Liu, J. (1993) Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31(1), 59-79.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • MacCarthy, B.L.1    Liu, J.2
  • 21
    • 0024731470 scopus 로고
    • Scheduling mixed-model multilevel just-in-time production systems
    • Miltenburg, J. and Sinnamon, G. (1989) Scheduling mixed-model multilevel just-in-time production systems. International Journal of Production Research, 27(9), 1487-1509.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1487-1509
    • Miltenburg, J.1    Sinnamon, G.2
  • 22
    • 0000172494 scopus 로고
    • Algorithms for scheduling multilevel just-in-time production systems
    • Miltenburg, J. and Sinnamon, G. (1992) Algorithms for scheduling multilevel just-in-time production systems. IIE Transactions, 24(2), 121-130.
    • (1992) IIE Transactions , vol.24 , Issue.2 , pp. 121-130
    • Miltenburg, J.1    Sinnamon, G.2
  • 25
    • 0000659781 scopus 로고
    • A system for managing job shop production
    • Reiter, S. (1966) A system for managing job shop production. J. Business, 39(3), 371-393.
    • (1966) J. Business , vol.39 , Issue.3 , pp. 371-393
    • Reiter, S.1
  • 27
    • 84974870375 scopus 로고
    • Heuristic performance and network/resource characteristics in resource-constrained project scheduling
    • Ulusoy, G. and Ozdamar, L. (1989) Heuristic performance and network/resource characteristics in resource-constrained project scheduling. Journal of the Operational Research Society, 40(12), 1149-1152.
    • (1989) Journal of the Operational Research Society , vol.40 , Issue.12 , pp. 1149-1152
    • Ulusoy, G.1    Ozdamar, L.2
  • 28
    • 0021393367 scopus 로고
    • Network programming models for production scheduling in multi-stage, multi-item capacitated systems
    • Zahorik, A., Thomas L.J. and Trigeiro, W.W. (1984) Network programming models for production scheduling in multi-stage, multi-item capacitated systems. Management Science, 30(3), 308-325.
    • (1984) Management Science , vol.30 , Issue.3 , pp. 308-325
    • Zahorik, A.1    Thomas, L.J.2    Trigeiro, W.W.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.