-
1
-
-
0041732082
-
Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines
-
Yi Y., and Wang D.W. Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines. Journal of Intelligent Manufacturing 14 3 (2003) 311-322
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.3
, pp. 311-322
-
-
Yi, Y.1
Wang, D.W.2
-
2
-
-
0036609211
-
Unrelated parallel machine scheduling with setup times using simulated annealing
-
Kim D.-W., Kim K.-H., Jang W., and Frank C.F. Unrelated parallel machine scheduling with setup times using simulated annealing. Robotics and Computer-Integrated Manufacturing 18 3-4 (2002) 223-231
-
(2002)
Robotics and Computer-Integrated Manufacturing
, vol.18
, Issue.3-4
, pp. 223-231
-
-
Kim, D.-W.1
Kim, K.-H.2
Jang, W.3
Frank, C.F.4
-
3
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi A., Gupta J.N., and Aldowaisan T. A review of scheduling research involving setup considerations. Omega 27 2 (1999) 219-239
-
(1999)
Omega
, vol.27
, Issue.2
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.2
Aldowaisan, T.3
-
4
-
-
0033078946
-
Survey of scheduling research involving setup times
-
Yang W.-H. Survey of scheduling research involving setup times. International Journal of Systems Science 30 2 (1999) 143-155
-
(1999)
International Journal of Systems Science
, vol.30
, Issue.2
, pp. 143-155
-
-
Yang, W.-H.1
-
5
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi A., Ng C.T., Cheng T.C., and Kovalyov M.Y. A survey of scheduling problems with setup times or costs. European Journal of Operational Research 187 3 (2008) 985-1032
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.3
Kovalyov, M.Y.4
-
6
-
-
33748492325
-
Scheduling and lot sizing with sequence-dependent setup: A literature review
-
Zhu X., and Wilhelm Wilbert E. Scheduling and lot sizing with sequence-dependent setup: A literature review. IIE Transactions 38 11 (2006) 987-1007
-
(2006)
IIE Transactions
, vol.38
, Issue.11
, pp. 987-1007
-
-
Zhu, X.1
Wilhelm Wilbert, E.2
-
8
-
-
0032044735
-
Modeling with colored timed object-oriented Petri nets for automated manufacturing systems
-
Wang L.-C., and Wu S.-Y. Modeling with colored timed object-oriented Petri nets for automated manufacturing systems. Computers and Industrial Engineering 34 2 (1998) 463-480
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.2
, pp. 463-480
-
-
Wang, L.-C.1
Wu, S.-Y.2
-
9
-
-
0035546217
-
A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
-
Christian A., and Francois R. A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times. International Journal of Production Economics 74 1-3 (2001) 63
-
(2001)
International Journal of Production Economics
, vol.74
, Issue.1-3
, pp. 63
-
-
Christian, A.1
Francois, R.2
-
10
-
-
23144456427
-
Dynamic scheduling in flexible assembly system based on timed Petri nets model
-
Zhang W., Freiheit T., and Yang H. Dynamic scheduling in flexible assembly system based on timed Petri nets model. Robotics and Computer-Integrated Manufacturing 21 6 (2005) 550-558
-
(2005)
Robotics and Computer-Integrated Manufacturing
, vol.21
, Issue.6
, pp. 550-558
-
-
Zhang, W.1
Freiheit, T.2
Yang, H.3
-
11
-
-
33846121916
-
FMS scheduling based on timed Petri net model and reactive graph search
-
Kim Y.W., Suzuki T., and Narikiyo T. FMS scheduling based on timed Petri net model and reactive graph search. Applied Mathematical Modelling 31 6 (2007) 955-970
-
(2007)
Applied Mathematical Modelling
, vol.31
, Issue.6
, pp. 955-970
-
-
Kim, Y.W.1
Suzuki, T.2
Narikiyo, T.3
-
12
-
-
3242695721
-
Petri net based scheduling
-
W M.P. Petri net based scheduling. OR Spectrum 18 4 (1996) 219-229
-
(1996)
OR Spectrum
, vol.18
, Issue.4
, pp. 219-229
-
-
van der Aalst, W.M.P.1
-
13
-
-
0027812081
-
-
Y.L. Doo, F. DiCesare, Scheduling flexible manufacturing systems with the consideration of setup times, in: Proceedings of the 32nd IEEE Conference on Decision and Control, vol. 4, 1993, pp. 3264-3269
-
Y.L. Doo, F. DiCesare, Scheduling flexible manufacturing systems with the consideration of setup times, in: Proceedings of the 32nd IEEE Conference on Decision and Control, vol. 4, 1993, pp. 3264-3269
-
-
-
-
14
-
-
55649113393
-
-
D.K. Terry, A Petri net-based on-line scheduling system for a general manufacturing job shop, Ph.D. Thesis, Rensselaer Polytechnic Institute, 1996, 9708937
-
D.K. Terry, A Petri net-based on-line scheduling system for a general manufacturing job shop, Ph.D. Thesis, Rensselaer Polytechnic Institute, 1996, 9708937
-
-
-
-
16
-
-
0034701845
-
A brief survey and synthesis of the roles of time in Petri nets
-
Bowden F.D. A brief survey and synthesis of the roles of time in Petri nets. Mathematical and Computer Modelling 31 10-12 (2000) 55-68
-
(2000)
Mathematical and Computer Modelling
, vol.31
, Issue.10-12
, pp. 55-68
-
-
Bowden, F.D.1
-
17
-
-
85027188133
-
An efficient polynomial-time algorithm to decide liveness and boundedness of free-choice nets
-
Kemper P., and Bause F. An efficient polynomial-time algorithm to decide liveness and boundedness of free-choice nets. Application and Theory of Petri Nets 1992 (1992) 263-278
-
(1992)
Application and Theory of Petri Nets 1992
, pp. 263-278
-
-
Kemper, P.1
Bause, F.2
-
18
-
-
55649087638
-
-
CPN tools http://wiki.daimi.au.dk/cpntools/cpntools.wiki
-
CPN tools http://wiki.daimi.au.dk/cpntools/cpntools.wiki
-
-
-
-
19
-
-
0001947856
-
Probabilistic learning combinations of local job-shop scheduling rules
-
Thompson G.L., and Fisher H. Probabilistic learning combinations of local job-shop scheduling rules. Industrial Scheduling (1963) 225-251
-
(1963)
Industrial Scheduling
, pp. 225-251
-
-
Thompson, G.L.1
Fisher, H.2
|