|
Volumn 4, Issue , 1993, Pages 3264-3269
|
Scheduling flexible manufacturing systems with the consideration of setup times
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ALGORITHMS;
FLEXIBLE MANUFACTURING SYSTEMS;
HEURISTIC METHODS;
MATHEMATICAL MODELS;
OPTIMIZATION;
PETRI NETS;
STRATEGIC PLANNING;
CONCURRENCY;
HEURISTIC SEARCH;
LOT SIZES;
ROUTING FLEXIBILITY;
SETUP TIMES;
SHARED RESOURCES;
SCHEDULING;
|
EID: 0027812081
PISSN: 01912216
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (8)
|
References (16)
|