Volumn 129, Issue 3, 2003, Pages 243-250

Bridge falsework productivity - Measurement and influences

Author keywords

Bridges, concrete; Falsework; Productivity; Project management

Indexed keywords

BRIDGE CONSTRUCTION; FALSEWORK; FORKLIFT; TALL STRUCTURES;

EID: 13944267542     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2003)129:3(243)     Document Type: Article
Times cited : (17)

References (12)
  • 2
    • 0004221507 scopus 로고
    • Sections 51-1.06B
    • California Dept. of Transportation (Caltrans). Standard specifications, (1995). Sections 51-1.06B, 51-11-51-12.
    • (1995) Standard Specifications , pp. 5111-5112
  • 3
    • 11644252866 scopus 로고    scopus 로고
    • Project cost risk analysis using influence diagrams
    • Diekman, J. E., et al. (1996). "Project cost risk analysis using influence diagrams." Proj. Manage. J., XXVII(4).
    • (1996) Proj. Manage. J. , vol.27 , Issue.4
    • Diekman, J.E.1
  • 4
    • 0000235357 scopus 로고    scopus 로고
    • Structural designs and construction technologies for California highway bridges
    • Hampson, K., and Fischer, M. (1997). "Structural designs and construction technologies for California highway bridges." J. Constr. Eng. Manage., 123(3), 269-275.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 269-275
    • Hampson, K.1    Fischer, M.2
  • 5
    • 0029469017 scopus 로고
    • Coping with uncertainty in environmental construction: Decision-analysis approach
    • Jeljeli, M. N., and Russell, J. S. (1995). "Coping with uncertainty in environmental construction: Decision-analysis approach." J. Constr. Eng. Manage., 121(4), 370-380.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 370-380
    • Jeljeli, M.N.1    Russell, J.S.2
  • 6
    • 13944252181 scopus 로고
    • Use of influence diagrams to assess the cost and schedule impact of construction changes
    • Dept. of Civil Engineering, Construction Engineering and Management, Univ. of California, Berkeley, Calif.
    • Kuprenas, J. A. (1988). "Use of influence diagrams to assess the cost and schedule impact of construction changes." Technical Rep. No. 14, Dept. of Civil Engineering, Construction Engineering and Management, Univ. of California, Berkeley, Calif.
    • (1988) Technical Rep. No. 14 , vol.14
    • Kuprenas, J.A.1
  • 7
    • 0025398530 scopus 로고
    • Factors affecting construction-planning outcomes
    • Laufer, A., and Cohenca, D. (1990). "Factors affecting construction-planning outcomes." J. Constr. Eng. Manage., 116(1), 135-156.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.1 , pp. 135-156
    • Laufer, A.1    Cohenca, D.2
  • 12
    • 0034271740 scopus 로고    scopus 로고
    • Role of the fabricator in labor productivity
    • Thomas, H R., and Sanvido, V. E. (2000). "Role of the fabricator in labor productivity." J. Constr. Eng. Manage., 126(5), 358-365.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 358-365
    • Thomas, H.R.1    Sanvido, V.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.