-
1
-
-
0001255490
-
A computational study of local search algorithms for job shop scheduling
-
Aarts, E., Van Laarhoven, P., Lenstra, J. and Ulder, N., A computational study of local search algorithms for job shop scheduling. ORSA Journal of Computing, 1994, 6, 118-125.
-
(1994)
ORSA Journal of Computing
, vol.6
, pp. 118-125
-
-
Aarts, E.1
Van Laarhoven, P.2
Lenstra, J.3
Ulder, N.4
-
2
-
-
33646913337
-
Meta-heuristic approaches for part selection and tool allocation in flexible manufacturing systems
-
Arikan, M. and Erol, S., Meta-heuristic approaches for part selection and tool allocation in flexible manufacturing systems. Int. J. Comput. Integr. Mfg., 2006, 19, 315-325.
-
(2006)
Int. J. Comput. Integr. Mfg
, vol.19
, pp. 315-325
-
-
Arikan, M.1
Erol, S.2
-
4
-
-
0004176585
-
-
Chapman & Hall: London
-
Bauer, A., Bowden, R., Browne, J., Duggan, J. and Lyons, G., Shop Floor Control Systems, 1991 (Chapman & Hall: London).
-
(1991)
Shop Floor Control Systems
-
-
Bauer, A.1
Bowden, R.2
Browne, J.3
Duggan, J.4
Lyons, G.5
-
5
-
-
0023979312
-
Theory and practice of load oriented manufacturing control
-
Bechte, W., Theory and practice of load oriented manufacturing control. Int. J. Prod. Res., 1988, 26, 375-395.
-
(1988)
Int. J. Prod. Res
, vol.26
, pp. 375-395
-
-
Bechte, W.1
-
6
-
-
0036819876
-
The workload control concept: Theory and practical extensions of load oriented order release
-
Breithaupt, J., Land, M. and Nyhuis, P., The workload control concept: theory and practical extensions of load oriented order release. Prod. Planning Control, 2002, 7, 625-638.
-
(2002)
Prod. Planning Control
, vol.7
, pp. 625-638
-
-
Breithaupt, J.1
Land, M.2
Nyhuis, P.3
-
8
-
-
0026207549
-
Simultaneous determination of lot sizes and routing mix in a job shop
-
Calabrese, J. and Hausman, W., Simultaneous determination of lot sizes and routing mix in a job shop. Mgmt Sci., 1991, 37, 1043-1057.
-
(1991)
Mgmt Sci
, vol.37
, pp. 1043-1057
-
-
Calabrese, J.1
Hausman, W.2
-
9
-
-
0021819411
-
Thermodynamical approach to the traveling salesman problem
-
Cerny, V., Thermodynamical approach to the traveling salesman problem. J. Opt. Theory Applic., 1985, 45, 41-51.
-
(1985)
J. Opt. Theory Applic
, vol.45
, pp. 41-51
-
-
Cerny, V.1
-
11
-
-
0346107238
-
-
Cheung, H., Yeung, W., Ng, H. and Fund, S., HSCF: a holonic shop floor control framework for flexible manufacturing systems. Int. J. Comput. Int. Mfg., 2000, 13, 121-138.
-
Cheung, H., Yeung, W., Ng, H. and Fund, S., HSCF: a holonic shop floor control framework for flexible manufacturing systems. Int. J. Comput. Int. Mfg., 2000, 13, 121-138.
-
-
-
-
12
-
-
33646913024
-
Dispatching rules for dynamic scheduling of one-of-a-kind production
-
Choi, B. and You, N., Dispatching rules for dynamic scheduling of one-of-a-kind production. Int. J. Comput. Integ. Mfg., 2006, 19, 383-392.
-
(2006)
Int. J. Comput. Integ. Mfg
, vol.19
, pp. 383-392
-
-
Choi, B.1
You, N.2
-
13
-
-
0035482386
-
A review of different approaches to the FMS loading problem
-
Grieco, A., Semeraro, Q., Tolio, T., A review of different approaches to the FMS loading problem.. Int. J. Flexible Mfg Systems, 2001, 13, 361-384.
-
(2001)
Int. J. Flexible Mfg Systems
, vol.13
, pp. 361-384
-
-
Grieco, A.1
Semeraro, Q.2
Tolio, T.3
-
14
-
-
0025384312
-
The discrete lot-sizing and scheduling problem
-
Fleischmann, B., The discrete lot-sizing and scheduling problem. Eur. J. Opl Res., 1990, 44, 337-348.
-
(1990)
Eur. J. Opl Res
, vol.44
, pp. 337-348
-
-
Fleischmann, B.1
-
15
-
-
0000372287
-
An analysis and discussion of the optimized production technology software and its use
-
Fry, T., Cox, J., Blackstone, J. and Hoffmann, T., An analysis and discussion of the optimized production technology software and its use. Prod. Ops Mgmt., 1992, 1, 229-242.
-
(1992)
Prod. Ops Mgmt
, vol.1
, pp. 229-242
-
-
Fry, T.1
Cox, J.2
Blackstone, J.3
Hoffmann, T.4
-
16
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
Glover, F., Future paths for integer programming and links to artificial intelligence. Comput. Ops Res., 1986, 13, 533-549.
-
(1986)
Comput. Ops Res
, vol.13
, pp. 533-549
-
-
Glover, F.1
-
17
-
-
32144446622
-
On-line scheduling and control of flexible manufacturing cells using atomata theory
-
Golmakani, H., Mills, J. and Benhabib, B., On-line scheduling and control of flexible manufacturing cells using atomata theory. Int. J. Comput. Meg. Mfg., 2006, 19, 178-193.
-
(2006)
Int. J. Comput. Meg. Mfg
, vol.19
, pp. 178-193
-
-
Golmakani, H.1
Mills, J.2
Benhabib, B.3
-
18
-
-
0023310940
-
Lot sizes, lead times and in-process inventories
-
Karmarkar, U.S., Lot sizes, lead times and in-process inventories. Mgmt Sci., 1987, 33, 409-423.
-
(1987)
Mgmt Sci
, vol.33
, pp. 409-423
-
-
Karmarkar, U.S.1
-
19
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrik, S., Gelatt, C. and Vecchi, M., Optimization by simulated annealing. Science, 1983, 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrik, S.1
Gelatt, C.2
Vecchi, M.3
-
20
-
-
49749151233
-
-
Knolmayer, G., A widely acclaimed method of load oriented job release and its conceptual deficiencies. In Modern Production, Concepts, edited by G. Fandel and. G. Zäpfel, 1991 (Springer: Berlin).
-
Knolmayer, G., A widely acclaimed method of load oriented job release and its conceptual deficiencies. In Modern Production, Concepts, edited by G. Fandel and. G. Zäpfel, 1991 (Springer: Berlin).
-
-
-
-
21
-
-
0030401650
-
Workload control concepts in job shops - a critical assessment
-
Land, M. and Gaalman, G., Workload control concepts in job shops - a critical assessment. Int. J. Prod. Econ., 1996, 46/47, 535-548.
-
(1996)
Int. J. Prod. Econ
, vol.46-47
, pp. 535-548
-
-
Land, M.1
Gaalman, G.2
-
22
-
-
21544472862
-
The virtual manufacturing cell
-
Gaithersburg, MD
-
McLean, C., Bloom, H. and Hopp, T., The virtual manufacturing cell. In Proceedings of Fourth IFAC/IFIP Conference on Information Control Problems in Manufacturing Technology, Gaithersburg, MD, 1982, pp. 105-111.
-
(1982)
Proceedings of Fourth IFAC/IFIP Conference on Information Control Problems in Manufacturing Technology
, pp. 105-111
-
-
McLean, C.1
Bloom, H.2
Hopp, T.3
-
23
-
-
31444456475
-
Next-generation manufacturing systems: Key research issues in developing and integrating reconfigurable and intelligent machines
-
Molina, A., Rodriguez, C., Ahuett, H., Cortes, J., Ramirez, M., Jimenez, G. and Martinez, S., Next-generation manufacturing systems: key research issues in developing and integrating reconfigurable and intelligent machines. Int. J. Comput. Integ. Mfg., 2005, 18, 525-536.
-
(2005)
Int. J. Comput. Integ. Mfg
, vol.18
, pp. 525-536
-
-
Molina, A.1
Rodriguez, C.2
Ahuett, H.3
Cortes, J.4
Ramirez, M.5
Jimenez, G.6
Martinez, S.7
-
24
-
-
33744515311
-
Virtual manufacturing cells: A taxonomy of past research and identification of future research issues
-
Nomden, G., Slomp, J. and Suresh, N., Virtual manufacturing cells: a taxonomy of past research and identification of future research issues. Int. J. Flexible Mfg Systems, 2006, 17, 71-92.
-
(2006)
Int. J. Flexible Mfg Systems
, vol.17
, pp. 71-92
-
-
Nomden, G.1
Slomp, J.2
Suresh, N.3
-
25
-
-
27844570132
-
Commentary on an exposition of multiple constraint scheduling as implemented in the goal system
-
Pinedo, M., Commentary on an exposition of multiple constraint scheduling as implemented in the goal system.. Prod. Ops Mgmt., 1997, 6, 25-27.
-
(1997)
Prod. Ops Mgmt
, vol.6
, pp. 25-27
-
-
Pinedo, M.1
-
26
-
-
0032637455
-
The application of information systems for the design and operation of flexible machining cells
-
Rahimifard, H. and Newman, S., The application of information systems for the design and operation of flexible machining cells. J. Intell. Mfg., 1999, 10, 21-27.
-
(1999)
J. Intell. Mfg
, vol.10
, pp. 21-27
-
-
Rahimifard, H.1
Newman, S.2
-
27
-
-
0036644049
-
Modeling the machine loading problem of FMSs and its solution using a tabu-search-based heuristic
-
Sarma, U., Kant, S., Rai, R. and Tiwari, M., Modeling the machine loading problem of FMSs and its solution using a tabu-search-based heuristic. Int. J. Comput. Integ. Mfg., 2002, 15, 285-295.
-
(2002)
Int. J. Comput. Integ. Mfg
, vol.15
, pp. 285-295
-
-
Sarma, U.1
Kant, S.2
Rai, R.3
Tiwari, M.4
-
29
-
-
0020718128
-
Formulation and solution of nonlinear integer production planning problem for a flexible manufacturing system
-
Stecke, K., Formulation and solution of nonlinear integer production planning problem for a flexible manufacturing system. Mgmt Sci., 1983, 29, 273-288.
-
(1983)
Mgmt Sci
, vol.29
, pp. 273-288
-
-
Stecke, K.1
-
30
-
-
27744563510
-
A review of production planning and control: The applicability of key concepts in the make-to-order industry
-
Stevenson, M., Hendry, L. and Kingsman, B., A review of production planning and control: the applicability of key concepts in the make-to-order industry. Int. J. Prod. Res., 2005, 43, 869-898.
-
(2005)
Int. J. Prod. Res
, vol.43
, pp. 869-898
-
-
Stevenson, M.1
Hendry, L.2
Kingsman, B.3
-
31
-
-
0017557653
-
Toyota production system and kanban system materialization of just-in-time and respect-for-human system
-
Sugimori, Y., Kusunoki, K., Cho, F. and Uchikawa, S., Toyota production system and kanban system materialization of just-in-time and respect-for-human system. Int. J. Prod. Res., 1977, 15, 553-564.
-
(1977)
Int. J. Prod. Res
, vol.15
, pp. 553-564
-
-
Sugimori, Y.1
Kusunoki, K.2
Cho, F.3
Uchikawa, S.4
-
32
-
-
0026461248
-
Job shop scheduling by simulated annealing
-
Van Laarhoven, P., Aarts, E. and Lenstra, J., Job shop scheduling by simulated annealing. Ops Res., 1992, 40, 113-125.
-
(1992)
Ops Res
, vol.40
, pp. 113-125
-
-
Van Laarhoven, P.1
Aarts, E.2
Lenstra, J.3
-
34
-
-
33745728226
-
A queueing model for a two-stage stochastic manufacturing system with overlapping operations
-
Van Nieuwenhuyse, I. and Vandaele, N., A queueing model for a two-stage stochastic manufacturing system with overlapping operations. Int. J. Flexible Mfg Systems, 2006, 17, 175-199.
-
(2006)
Int. J. Flexible Mfg Systems
, vol.17
, pp. 175-199
-
-
Van Nieuwenhuyse, I.1
Vandaele, N.2
-
35
-
-
33745726226
-
Scheduling multi-operation jobs in partially overlapping systems
-
Wang, C., Ghenniwa, H. and Shen, W., Scheduling multi-operation jobs in partially overlapping systems. Int. J. Comput. Integr. Mfg., 2006, 19, 453-462.
-
(2006)
Int. J. Comput. Integr. Mfg
, vol.19
, pp. 453-462
-
-
Wang, C.1
Ghenniwa, H.2
Shen, W.3
-
36
-
-
9244239714
-
A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly
-
Yin, X., Chua, T., Wang, F., Liu, M., Cai, T., Yan, W., Chong, C., Zhu, J. and Lam, M., A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly. Int. J. Comput. Integ. Mfgg., 2004, 17, 733-749.
-
(2004)
Int. J. Comput. Integ. Mfgg
, vol.17
, pp. 733-749
-
-
Yin, X.1
Chua, T.2
Wang, F.3
Liu, M.4
Cai, T.5
Yan, W.6
Chong, C.7
Zhu, J.8
Lam, M.9
|