메뉴 건너뛰기




Volumn 17, Issue 3, 2006, Pages 175-199

A queueing model for a two-stage stochastic manufacturing system with overlapping operations

Author keywords

Lot splitting; Overlapping operations; Queueing theory

Indexed keywords

EMBEDDED SYSTEMS; GAGES; MATERIALS HANDLING; MATHEMATICAL MODELS; RANDOM PROCESSES;

EID: 33745728226     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10696-006-8818-2     Document Type: Article
Times cited : (7)

References (39)
  • 1
    • 0000994184 scopus 로고
    • A comparative study of lot streaming techniques
    • Baker KR, Jia D (1993) A comparative study of lot streaming techniques. Omega 21:561-566
    • (1993) Omega , vol.21 , pp. 561-566
    • Baker, K.R.1    Jia, D.2
  • 2
    • 0030141614 scopus 로고    scopus 로고
    • On production batches, transfer batches, and lead times
    • Benjaafar S (1996) On production batches, transfer batches, and lead times. IIE Trans 28:357-362
    • (1996) IIE Trans , vol.28 , pp. 357-362
    • Benjaafar, S.1
  • 4
    • 0030257866 scopus 로고    scopus 로고
    • Determining transfer batch sizes in trip-based material handling systems
    • Bozer YA, Kim J (1996) Determining transfer batch sizes in trip-based material handling systems. Int J Flex Manuf Syst 8(4):313-356
    • (1996) Int J Flex Manuf Syst , vol.8 , Issue.4 , pp. 313-356
    • Bozer, Y.A.1    Kim, J.2
  • 5
    • 0036833214 scopus 로고    scopus 로고
    • Lot splitting to minimize average flow time in a two-machine flow shop
    • Bukchin J, Tzur M, Jaffe M (2002) Lot splitting to minimize average flow time in a two-machine flow shop. IIE Trans 34:953-970
    • (2002) IIE Trans , vol.34 , pp. 953-970
    • Bukchin, J.1    Tzur, M.2    Jaffe, M.3
  • 6
    • 0022092442 scopus 로고
    • On approximate queueing models of dynamic job shops
    • Buzacott JA, Shantikumar JG (1985) On approximate queueing models of dynamic job shops. Manag Sci 31:870-887
    • (1985) Manag Sci , vol.31 , pp. 870-887
    • Buzacott, J.A.1    Shantikumar, J.G.2
  • 7
    • 0032262156 scopus 로고    scopus 로고
    • Lot streaming with attached setups in three-machine flowshops
    • Chen J, Steiner G (1998) Lot streaming with attached setups in three-machine flowshops. IIE Trans 30:1075-1084
    • (1998) IIE Trans , vol.30 , pp. 1075-1084
    • Chen, J.1    Steiner, G.2
  • 9
    • 38249040429 scopus 로고
    • Overlapping operations in materials requirements planning
    • Graves SC, Kostreva MM (1986) Overlapping operations in materials requirements planning. J Oper Manag 6:283-294
    • (1986) J Oper Manag , vol.6 , pp. 283-294
    • Graves, S.C.1    Kostreva, M.M.2
  • 12
    • 84985801774 scopus 로고
    • Repetitive lots: Flow- Time reductions through sequencing and dynamic batch sizing
    • Jacobs FR, Bragg DJ (1988) Repetitive lots: Flow- time reductions through sequencing and dynamic batch sizing. Dec Sci 19:281-294
    • (1988) Dec Sci , vol.19 , pp. 281-294
    • Jacobs, F.R.1    Bragg, D.J.2
  • 13
    • 0022034627 scopus 로고
    • Lot sizing and lead time performance in a manufacturing cell
    • Karmarkar U, Kekre S, Freeman S (1985a) Lot sizing and lead time performance in a manufacturing cell. Interfaces 15:1-9
    • (1985) Interfaces , vol.15 , pp. 1-9
    • Karmarkar, U.1    Kekre, S.2    Freeman, S.3
  • 14
    • 0022128589 scopus 로고
    • Lot sizing in multi-item multi-machine job shops
    • Karmarkar U, Kekre S, Kekre S (1985b) Lot sizing in multi-item multi-machine job shops. IIE Trans 17:290-298
    • (1985) IIE Trans , vol.17 , pp. 290-298
    • Karmarkar, U.1    Kekre, S.2    Kekre, S.3
  • 15
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar U (1987) Lot sizes, lead times and in-process inventories. Manag Sci 33:409-417
    • (1987) Manag Sci , vol.33 , pp. 409-417
    • Karmarkar, U.1
  • 16
  • 18
    • 84985755271 scopus 로고
    • Optimal and heuristic models for lot splitting in a flow shop
    • Kropp DH, Smunt TL (1990) Optimal and heuristic models for lot splitting in a flow shop. Dec Sci 21:691-709
    • (1990) Dec Sci , vol.21 , pp. 691-709
    • Kropp, D.H.1    Smunt, T.L.2
  • 19
    • 0032208462 scopus 로고    scopus 로고
    • ACL1PS: A capacity and lead time integrated procedure for scheduling
    • Lambrecht MR, Ivens PL, Vandaele NJ (1998) ACL1PS: A capacity and lead time integrated procedure for scheduling. Manag Sci 44:1548-1561
    • (1998) Manag Sci , vol.44 , pp. 1548-1561
    • Lambrecht, M.R.1    Ivens, P.L.2    Vandaele, N.J.3
  • 20
    • 8644280022 scopus 로고    scopus 로고
    • Transfer batch sizing in flexible manufacturing systems
    • Langevin A, Riopel D, Stecke KE (1999) Transfer batch sizing in flexible manufacturing systems. J Manuf Syst 18:140-151
    • (1999) J Manuf Syst , vol.18 , pp. 140-151
    • Langevin, A.1    Riopel, D.2    Stecke, K.E.3
  • 21
    • 0040524196 scopus 로고    scopus 로고
    • Improving job shop performance through process queue management under transfer batching
    • Litchfield JL, Narasimhan R (2000) Improving job shop performance through process queue management under transfer batching. Prod Oper Manag 9:336-348
    • (2000) Prod Oper Manag , vol.9 , pp. 336-348
    • Litchfield, J.L.1    Narasimhan, R.2
  • 22
    • 0000500589 scopus 로고
    • Some inequalities in queueing
    • Marshall KT (1968) Some inequalities in queueing. Oper Res 16:651-665
    • (1968) Oper Res , vol.16 , pp. 651-665
    • Marshall, K.T.1
  • 23
    • 0033895628 scopus 로고    scopus 로고
    • Scheduling with batching: A review
    • Potts CN, Kovalyov MY (2000) Scheduling with batching: A review. Europ J Oper Res 120:228-249
    • (2000) Europ J Oper Res , vol.120 , pp. 228-249
    • Potts, C.N.1    Kovalyov, M.Y.2
  • 24
  • 25
    • 0032172707 scopus 로고    scopus 로고
    • Lot splitting in unbalanced production systems
    • Ruben RA, Mahmoodi F (1998) Lot splitting in unbalanced production systems. Dec Sei 29:921-949
    • (1998) Dec Sei , vol.29 , pp. 921-949
    • Ruben, R.A.1    Mahmoodi, F.2
  • 26
    • 0022132659 scopus 로고
    • Batching in single-operations manufacturing systems
    • Santos C, Magazine M (1985) Batching in single-operations manufacturing systems. Oper Res Lett 4:99-103
    • (1985) Oper Res Lett , vol.4 , pp. 99-103
    • Santos, C.1    Magazine, M.2
  • 27
    • 0030500179 scopus 로고    scopus 로고
    • Lot splitting in stochastic flow shop and job shop environments
    • Smunt TL, Buss AH, Kropp DH (1996) Lot splitting in stochastic flow shop and job shop environments. Dec Sci 27:215-238
    • (1996) Dec Sci , vol.27 , pp. 215-238
    • Smunt, T.L.1    Buss, A.H.2    Kropp, D.H.3
  • 29
    • 77957033398 scopus 로고
    • Performance evaluation of production networks
    • S. C. Graves et al. (Eds), Logistics of Production and Inventory, North-Holland
    • Suri R, Sanders JL, Kamath M (1993) Performance evaluation of production networks. In : S. C. Graves et al. (Eds), Logistics of Production and Inventory, Handbooks in Operations Research and Management Science, North-Holland, pp. 199-286
    • (1993) Handbooks in Operations Research and Management Science , pp. 199-286
    • Suri, R.1    Sanders, J.L.2    Kamath, M.3
  • 30
    • 0003492414 scopus 로고
    • Synchronous manufacturing: Principles for world-class excellence
    • The Spectrum Publishing Company, Wallingford, CT Vandaele NJ, Van Nieuwenhuyse I, Cupers S (2003) Optimal grouping for a nuclear magnetic resonance scanner
    • Umble M, Srikanth ML (1995) Synchronous manufacturing: Principles for world-class excellence. The Spectrum Publishing Company, Wallingford, CT Vandaele NJ, Van Nieuwenhuyse I, Cupers S (2003) Optimal grouping for a nuclear magnetic resonance scanner. Europ J Oper Res 151:181-192
    • (1995) Europ J Oper Res , vol.151 , pp. 181-192
    • Umble, M.1    Srikanth, M.L.2
  • 32
    • 9544249400 scopus 로고    scopus 로고
    • Determining the optimal number of sublots in a single-product, Deterministic flow shop with overlapping operations
    • Van Nieuwenhuyse I, Vandaele N (2004a) Determining the optimal number of sublots in a single-product, Deterministic flow shop with overlapping operations. Int J Prod Econ 92:221-239
    • (2004) Int J Prod Econ , vol.92 , pp. 221-239
    • Van Nieuwenhuyse, I.1    Vandaele, N.2
  • 34
    • 33745679872 scopus 로고    scopus 로고
    • The impact of delivery lot splitting on delivery reliability in a two-stage supply chain
    • forthcoming
    • Van Nieuwenhuyse I, Vandaele N (2006) The impact of delivery lot splitting on delivery reliability in a two-stage supply chain. Int J Prod Econ, forthcoming
    • (2006) Int J Prod Econ
    • Van Nieuwenhuyse, I.1    Vandaele, N.2
  • 36
    • 0028526352 scopus 로고
    • The impact of lot splitting on due date performance
    • Wagner BJ, Ragatz GL (1994) The impact of lot splitting on due date performance. J Oper Manag 12:13-25
    • (1994) J Oper Manag , vol.12 , pp. 13-25
    • Wagner, B.J.1    Ragatz, G.L.2
  • 37
    • 0020848139 scopus 로고
    • The queueing network analyzer
    • Whitt W (1983) The queueing network analyzer. The Bell Sys Techn J 62:2779-2815
    • (1983) The Bell Sys Techn J , vol.62 , pp. 2779-2815
    • Whitt, W.1
  • 38
    • 84986958774 scopus 로고
    • Approximations for the GI/G/m queue
    • Whitt W (1993) Approximations for the GI/G/m queue. Prod Oper Manag 2:114-161
    • (1993) Prod Oper Manag , vol.2 , pp. 114-161
    • Whitt, W.1
  • 39
    • 21344498929 scopus 로고
    • Towards better multi-class parametric-decomposition approximations for open queueing networks
    • Whitt W. (1994) Towards better multi-class parametric-decomposition approximations for open queueing networks. Ann Oper Res 48:221-248
    • (1994) Ann Oper Res , vol.48 , pp. 221-248
    • Whitt, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.