-
1
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing
-
1
-
AkçalI E, Nemoto K, Uzsoy R (2001) Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans Semicond Manuf 14(1):48-56
-
(2001)
IEEE Trans Semicond Manuf
, vol.14
, pp. 48-56
-
-
Akçali, E.1
Nemoto, K.2
Uzsoy, R.3
-
3
-
-
15344344521
-
Capacity planning with capability for multiple semiconductor manufacturing fabs
-
4
-
Chen JC, Chen CW, Lin CJ, Rau H (2005) Capacity planning with capability for multiple semiconductor manufacturing fabs. Comput Indust Eng 48(4):709-732
-
(2005)
Comput Indust Eng
, vol.48
, pp. 709-732
-
-
Chen, J.C.1
Chen, C.W.2
Lin, C.J.3
Rau, H.4
-
4
-
-
0034250153
-
A methodology for product mix semiconductor foundry manufacturing
-
3
-
Chou YC, Hong IH (2000) A methodology for product mix semiconductor foundry manufacturing. IEEE Trans Semicond Manuf 13(3):278-285
-
(2000)
IEEE Trans Semicond Manuf
, vol.13
, pp. 278-285
-
-
Chou, Y.C.1
Hong, I.H.2
-
5
-
-
33745929420
-
Capacity allocation model for photolithography workstation with the constraints of process window and machine dedication
-
7
-
Chung SH, Huang CY, Lee AHI (2006) Capacity allocation model for photolithography workstation with the constraints of process window and machine dedication. Prod Plan Control 17(7):678-688
-
(2006)
Prod Plan Control
, vol.17
, pp. 678-688
-
-
Chung, S.H.1
Huang, C.Y.2
Lee, A.H.I.3
-
6
-
-
33750554120
-
Loading allocation algorithm with machine capability restriction for wafer fabrication factories
-
4
-
Chung SH, Huang HW (2001) Loading allocation algorithm with machine capability restriction for wafer fabrication factories. J Chin Inst Ind Eng 18(4):82-96
-
(2001)
J Chin Inst Ind Eng
, vol.18
, pp. 82-96
-
-
Chung, S.H.1
Huang, H.W.2
-
7
-
-
0036468754
-
Hybrid capacity modeling for alternative machine types in linear programming production planning
-
2
-
Hung YF, Cheng GJ (2002) Hybrid capacity modeling for alternative machine types in linear programming production planning. IIE Trans 34(2):157-165
-
(2002)
IIE Trans
, vol.34
, pp. 157-165
-
-
Hung, Y.F.1
Cheng, G.J.2
-
8
-
-
33745879211
-
-
ILOG Inc. ILOG Inc., France
-
ILOG Inc. (2001) ILOG OPL Studio 3.5. ILOG Inc., France
-
(2001)
ILOG OPL Studio 3.5
-
-
-
9
-
-
0002549571
-
On capacity modeling for production planning with alternative machine types
-
4
-
Leachman RC, Carmon TF (1992) On capacity modeling for production planning with alternative machine types. IIE Trans 24(4):62-72
-
(1992)
IIE Trans
, vol.24
, pp. 62-72
-
-
Leachman, R.C.1
Carmon, T.F.2
-
10
-
-
24144440769
-
On the load-balanced demand points assignment problem in large-scale wireless LANs
-
Low CP, Fang C (2005) On the load-balanced demand points assignment problem in large-scale wireless LANs. Lect Notes Comput Sci 3391:21-30
-
(2005)
Lect Notes Comput Sci
, vol.3391
, pp. 21-30
-
-
Low, C.P.1
Fang, C.2
-
11
-
-
0003614971
-
-
PWS Publishing Company Boston
-
Sule DR (1997) Industrial scheduling. PWS Publishing Company, Boston, pp 124-126
-
(1997)
Industrial Scheduling
, pp. 124-126
-
-
Sule, D.R.1
-
12
-
-
0000262471
-
A capacity allocation problem with integer side constraints
-
1
-
Toktay LB, Uzsoy R (1998) A capacity allocation problem with integer side constraints. Eur J Operat Res 109(1):170-182
-
(1998)
Eur J Operat Res
, vol.109
, pp. 170-182
-
-
Toktay, L.B.1
Uzsoy, R.2
|