메뉴 건너뛰기




Volumn 109, Issue 1, 1998, Pages 170-182

A capacity allocation problem with integer side constraints

Author keywords

Network flows; Scheduling; Semiconductor manufacturing

Indexed keywords


EID: 0000262471     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0377-2217(98)80011-8     Document Type: Article
Times cited : (49)

References (14)
  • 1
    • 0026107479 scopus 로고
    • A facet generation and relaxation technique applied to an assignment problem with side constraints
    • Aboudi, R., Hallefjord, A., and Jornsten, K. (1991), "A facet generation and relaxation technique applied to an assignment problem with side constraints", European Journal of Operational Research, 50, 335-344.
    • (1991) European Journal of Operational Research , vol.50 , pp. 335-344
    • Aboudi, R.1    Hallefjord, A.2    Jornsten, K.3
  • 5
    • 84919241140 scopus 로고
    • A constraint based scheduling system for VLSI wafer fabrication
    • J. Browne, (ed.,) Elsevier Science Publishers, Amsterdam
    • Elleby, P., Fargher, H.E., and Addis, T.R. (1989), "A constraint based scheduling system for VLSI wafer fabrication", in: J. Browne, (ed.,) Knowledge-Based Production Management Systems, Elsevier Science Publishers, Amsterdam.
    • (1989) Knowledge-based Production Management Systems
    • Elleby, P.1    Fargher, H.E.2    Addis, T.R.3
  • 8
    • 0043038934 scopus 로고
    • Intelligently scheduling semiconductor wafer fabrication
    • M. Zweben and M. Fox (eds.), Morgan Kaufmann, Los Altos, CA
    • Kempf, K.G. (1994), "Intelligently scheduling semiconductor wafer fabrication", in: M. Zweben and M. Fox (eds.), Intelligent Scheduling Systems, Morgan Kaufmann, Los Altos, CA.
    • (1994) Intelligent Scheduling Systems
    • Kempf, K.G.1
  • 9
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants
    • Lu, S.H., Ramaswamy, D., and Kumar, P.R. (1994), "Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants", IEEE Transactions on Semiconductor Manufacturing 7, 374-388.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , pp. 374-388
    • Lu, S.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 10
    • 84987049992 scopus 로고
    • Network synthesis and optimum network design problems: Models, solution methods and applications
    • Minoux, M. (1989), "Network synthesis and optimum network design problems: Models, solution methods and applications", Networks 19, 313-360.
    • (1989) Networks , vol.19 , pp. 313-360
    • Minoux, M.1
  • 12
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semicon-ductor industry - Part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.Y., and Martin-Vega, L.A. (1992), "A review of production planning and scheduling models in the semicon-ductor industry - Part I: System characteristics, performance evaluation and production planning", IIE Transactions on Scheduling and Logistics 4, 47-60.
    • (1992) IIE Transactions on Scheduling and Logistics , vol.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 13
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry - Part II: Shop-floor control
    • Uzsoy, R., Lee, C.Y., and Martin-Vega, L.A. (1994), "A review of production planning and scheduling models in the semiconductor industry - Part II: Shop-floor control", IIE Transactions on Scheduling and Logistics 26, 44-55.
    • (1994) IIE Transactions on Scheduling and Logistics , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.