-
1
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing
-
Akçali, E., Nemoto, K. and Uzsoy, R., Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans. Semicon. Manuf., 2001, 14(1), 48-56.
-
(2001)
IEEE Trans. Semicon. Manuf.
, vol.14
, Issue.1
, pp. 48-56
-
-
Akçali, E.1
Nemoto, K.2
Uzsoy, R.3
-
2
-
-
0030392965
-
Capacity planning for development wafer fab expansion, in 7990
-
Chou, W. and Everton, J., Capacity planning for development wafer fab expansion, in 7990 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 1996, pp. 17-22.
-
(1996)
IEEE/SEMI Advanced Semiconductor Manufacturing Conference
, pp. 17-22
-
-
Chou, W.1
Everton, J.2
-
3
-
-
33750554120
-
Loading allocation algorithm with machine capability restriction for wafer fabrication factories
-
Chung, S.H. and Huang, H.W., Loading allocation algorithm with machine capability restriction for wafer fabrication factories. J. Chinese Inst. Indust. Eng., 2001, 18(4), 82-96.
-
(2001)
J. Chinese Inst. Indust. Eng.
, vol.18
, Issue.4
, pp. 82-96
-
-
Chung, S.H.1
Huang, H.W.2
-
4
-
-
0003398482
-
-
North River Press: New York, NY
-
Goldratt, E.M. and Cox, J., The Goal: A Process of Ongoing Improvement, 2nd ed., 1992 (North River Press: New York, NY).
-
(1992)
The Goal: A Process of Ongoing Improvement, 2nd Ed.
-
-
Goldratt, E.M.1
Cox, J.2
-
5
-
-
0004020261
-
-
McGraw-Hill Publishing Company: New York, NY
-
Hiller, F.S. and Lieberman, G.J., Introduction to Operations Research, 7th ed., 2001 (McGraw-Hill Publishing Company: New York, NY).
-
(2001)
Introduction to Operations Research, 7th Ed.
-
-
Hiller, F.S.1
Lieberman, G.J.2
-
6
-
-
0038630719
-
Capacity planning under demand uncertainty for semiconductor manufacturing
-
Hood, S.J., Bermon, S. and Barahona, F., Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans. Semicon. Manuf., 2003, 16(2), 273-280.
-
(2003)
IEEE Trans. Semicon. Manuf.
, vol.16
, Issue.2
, pp. 273-280
-
-
Hood, S.J.1
Bermon, S.2
Barahona, F.3
-
7
-
-
0036468754
-
Hybrid capacity modeling for alternative machine types in linear programming production planning
-
Hung, Y.F. and Cheng, G.J., Hybrid capacity modeling for alternative machine types in linear programming production planning. IIE Trans., 2002, 34(2), 157-165.
-
(2002)
IIE Trans.
, vol.34
, Issue.2
, pp. 157-165
-
-
Hung, Y.F.1
Cheng, G.J.2
-
8
-
-
0030150549
-
A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculations
-
Hung, Y.F. and Leachman, R.C., A production planning methodology for semiconductor manufacturing based on interactive simulation and linear programming calculations. IEEE Trans. Semicon. Manuf., 1996, 9(2), 257-269.
-
(1996)
IEEE Trans. Semicon. Manuf.
, vol.9
, Issue.2
, pp. 257-269
-
-
Hung, Y.F.1
Leachman, R.C.2
-
9
-
-
33745879211
-
-
ILOG Inc., (ILOG Inc.: France)
-
ILOG Inc., ILOG OPL Studio 3.5, 2001a (ILOG Inc.: France).
-
(2001)
ILOG OPL Studio 3.5
-
-
-
10
-
-
28244459145
-
-
ILOG Inc., (ILOG Inc.: France)
-
ILOG Inc., ILOG CPLEX 7.5, 2001b (ILOG Inc.: France).
-
(2001)
ILOG CPLEX 7.5
-
-
-
11
-
-
0035421261
-
Optimized operations by extended x-factor theory including unit hours concept
-
Kishimoto, M., Ozawa, K., Watanabe, K. and Martin, D., Optimized operations by extended x-factor theory including unit hours concept. IEEE Trans. Semicon. Manuf., 2001, 14(3), 187-195.
-
(2001)
IEEE Trans. Semicon. Manuf.
, vol.14
, Issue.3
, pp. 187-195
-
-
Kishimoto, M.1
Ozawa, K.2
Watanabe, K.3
Martin, D.4
-
12
-
-
0002549571
-
On capacity modeling for production planning with alternative machine types
-
Leachman, R.C. and Carmon, T.F., On capacity modeling for production planning with alternative machine types. IIE Trans., 1992, 24(4), 62-72.
-
(1992)
IIE Trans.
, vol.24
, Issue.4
, pp. 62-72
-
-
Leachman, R.C.1
Carmon, T.F.2
-
14
-
-
0034481452
-
Capacity planning model: The important inputs, formulas, and benefits
-
Occhino, T.J., Capacity planning model: The important inputs, formulas, and benefits, in 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 2000, pp. 455-458.
-
(2000)
2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference
, pp. 455-458
-
-
Occhino, T.J.1
-
16
-
-
0033330365
-
Capacity planning for semiconductor wafer fabrication with time constraints between operations
-
Robinson, J.K. and Giglio, R., Capacity planning for semiconductor wafer fabrication with time constraints between operations, in Proceedings of the 1999 Winter Simulation Conference, 1999, pp. 880-887.
-
(1999)
Proceedings of the 1999 Winter Simulation Conference
, pp. 880-887
-
-
Robinson, J.K.1
Giglio, R.2
-
17
-
-
0023268335
-
Capacity planning of a photolithography work cell in a wafer manufacturing line
-
Spence, A.M. and Welter, D.J., Capacity planning of a photolithography work cell in a wafer manufacturing line, in Proceedings of the 1987 IEEE International Conference on Robotics and Automation, 1987, 4, pp. 702-708.
-
(1987)
Proceedings of the 1987 IEEE International Conference on Robotics and Automation
, vol.4
, pp. 702-708
-
-
Spence, A.M.1
Welter, D.J.2
-
18
-
-
0033889013
-
Tool capacity planning for semiconductor fabrication facilities under demand uncertainty
-
Swaminathan, J.M., Tool capacity planning for semiconductor fabrication facilities under demand uncertainty. Euro. J. Op. Res., 2000, 120, 545-558.
-
(2000)
Euro. J. Op. Res.
, vol.120
, pp. 545-558
-
-
Swaminathan, J.M.1
-
19
-
-
0030151648
-
Simulation-based scheduling: Meeting the semiconductor wafer fabrication challenge
-
Thompson, M., Simulation-based scheduling: meeting the semiconductor wafer fabrication challenge. IIE Solutions, 1996, 28(5), 30-34.
-
(1996)
IIE Solutions
, vol.28
, Issue.5
, pp. 30-34
-
-
Thompson, M.1
-
20
-
-
0000262471
-
A capacity allocation problem with integer side constraints
-
Toktay, L.B. and Uzsoy, R., A capacity allocation problem with integer side constraints. Euro. J. Op. Res., 1998, 109, 170-182.
-
(1998)
Euro. J. Op. Res.
, vol.109
, pp. 170-182
-
-
Toktay, L.B.1
Uzsoy, R.2
-
21
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry (I): System characteristics, performance evaluation and production planning
-
Uzsoy, R., Lee, C.-Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semiconductor industry (I): system characteristics, performance evaluation and production planning. IIE Trans., 1992, 24(4), 47-60.
-
(1992)
IIE Trans.
, vol.24
, Issue.4
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
22
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry (II): Shop-floor control
-
Uzsoy, R., Lee, C.-Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semiconductor industry (II): shop-floor control. IIE Trans., 1994, 26(5), 44-55.
-
(1994)
IIE Trans.
, vol.26
, Issue.5
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
|