메뉴 건너뛰기




Volumn 55, Issue 1, 2008, Pages 103-119

A modeling framework for product development process considering its characteristics

Author keywords

Design iteration; Modeling framework; Overlap; Patterns; Product development (PD) process

Indexed keywords

MATHEMATICAL MODELS; PLANNING; PRODUCTION CONTROL;

EID: 39849094742     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2007.912808     Document Type: Article
Times cited : (39)

References (64)
  • 7
    • 0007651681 scopus 로고
    • College Station, TX: Knowledge Based System, Inc
    • R. J. Mayer, IDEFO Function Modeling. College Station, TX: Knowledge Based System, Inc., 1994.
    • (1994) IDEFO Function Modeling
    • Mayer, R.J.1
  • 9
    • 0032108110 scopus 로고    scopus 로고
    • Integrated modeling framework for manufacturing systems: A unified representanon of the physical process and information system
    • H. W. Kang, J. W. Kim, and S. J. Park, "Integrated modeling framework for manufacturing systems: A unified representanon of the physical process and information system," Int. J. Flexible Manuf. Syst., vol. 10, pp. 231-265, 1998.
    • (1998) Int. J. Flexible Manuf. Syst , vol.10 , pp. 231-265
    • Kang, H.W.1    Kim, J.W.2    Park, S.J.3
  • 10
    • 0032594784 scopus 로고    scopus 로고
    • Framework for modeling dependencies in collaborative engineering processes
    • H. Park and M. R. Cutkosky, "Framework for modeling dependencies in collaborative engineering processes," Res. Eng. Design, vol. 11, pp. 84-102, 1999.
    • (1999) Res. Eng. Design , vol.11 , pp. 84-102
    • Park, H.1    Cutkosky, M.R.2
  • 11
    • 0029546891 scopus 로고
    • Eingineering design processes, problem solving & creativity
    • D. L. Dekker, "Eingineering design processes, problem solving & creativity," in Proc. Frontiers Edu. Conf., 1995, vol. 1, pp. 3a5.16-3a5.19.
    • (1995) Proc. Frontiers Edu. Conf , vol.1
    • Dekker, D.L.1
  • 12
    • 0029484198 scopus 로고    scopus 로고
    • How the design process analysis can improve the design process management: A way to cooperative design
    • J.-M. Brun and D. Vandorpe, "How the design process analysis can improve the design process management: A way to cooperative design," in Proc. 1995 INRIA/IEEE Symp. Emerging Technol. Factory Autom., vol. 2, pp. 131-140.
    • Proc. 1995 INRIA/IEEE Symp. Emerging Technol. Factory Autom , vol.2 , pp. 131-140
    • Brun, J.-M.1    Vandorpe, D.2
  • 13
    • 0029773444 scopus 로고    scopus 로고
    • The iterative component of design
    • M. J. Safoutin and R. P. Smith, "The iterative component of design," in Proc. IEMC 1996, 564-568.
    • (1996) Proc. IEMC , pp. 564-568
    • Safoutin, M.J.1    Smith, R.P.2
  • 14
    • 0002132859 scopus 로고    scopus 로고
    • Dynamic moedeling of product development processes
    • D. N. Ford and J. D. Sterman, "Dynamic moedeling of product development processes," Syst. Dynam. Rev., vol. 14, no. 1, pp. 31-68, 1998.
    • (1998) Syst. Dynam. Rev , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.N.1    Sterman, J.D.2
  • 15
    • 0039184131 scopus 로고    scopus 로고
    • Product development process modeling
    • R. P. Smith and J. A. Morrow, "Product development process modeling," Design, Stud., vol. 20, pp. 237-261, 1999.
    • (1999) Design, Stud , vol.20 , pp. 237-261
    • Smith, R.P.1    Morrow, J.A.2
  • 16
    • 0141718881 scopus 로고    scopus 로고
    • An acctivity model of the product development process
    • A. C. Fairlie-Clarke and M. Muller, "An acctivity model of the product development process," J. Eng. Design, vol. 14, no. 3, pp. 247-272, 2004.
    • (2004) J. Eng. Design , vol.14 , Issue.3 , pp. 247-272
    • Fairlie-Clarke, A.C.1    Muller, M.2
  • 17
    • 0030388233 scopus 로고    scopus 로고
    • Modeling relationships among design activities
    • U. Belhe and A. Kusiak, "Modeling relationships among design activities," J. Mech. Design, vol. 118, pp. 454-460, 1996.
    • (1996) J. Mech. Design , vol.118 , pp. 454-460
    • Belhe, U.1    Kusiak, A.2
  • 18
    • 0026991064 scopus 로고
    • Concurrent engineering: A deesign process perspective
    • A. Kusiak and U. Belhe, "Concurrent engineering: A deesign process perspective," in Proc. Amer. Soc. Mech. Eng., 1992, vol. 59, pp. 387-401.
    • (1992) Proc. Amer. Soc. Mech. Eng , vol.59 , pp. 387-401
    • Kusiak, A.1    Belhe, U.2
  • 19
    • 0028465104 scopus 로고
    • Reengineering of design and manufacturing processes
    • A. Kusiak, T. N. Larson, and J. R. Wang, "Reengineering of design and manufacturing processes," Comput. Ind. Eng., vol. 26, no. 3, pp. 521-536, 1994.
    • (1994) Comput. Ind. Eng , vol.26 , Issue.3 , pp. 521-536
    • Kusiak, A.1    Larson, T.N.2    Wang, J.R.3
  • 20
    • 0029309888 scopus 로고
    • Resource constrained scheduling of hierarchically structured design activity networks
    • May
    • U. Belhe and A. Kusiak, "Resource constrained scheduling of hierarchically structured design activity networks," IEEE Trans. Eng. Manag., vol. 42, no. 2, pp. 150-158, May 1995.
    • (1995) IEEE Trans. Eng. Manag , vol.42 , Issue.2 , pp. 150-158
    • Belhe, U.1    Kusiak, A.2
  • 22
    • 84965520647 scopus 로고
    • Performance analysis of design process using timed Petri nets
    • U. Belhe and A. Kusiak, "Performance analysis of design process using timed Petri nets," Concurrent Eng.: Res. Appl., vol. 1, no. 3, pp, 147-152, 1993.
    • (1993) Concurrent Eng.: Res. Appl , vol.1 , Issue.3 , pp. 147-152
    • Belhe, U.1    Kusiak, A.2
  • 23
    • 0028515348 scopus 로고
    • A Petri net model for temporal knowledge representation and reasoning
    • Sep
    • Y. Yao, "A Petri net model for temporal knowledge representation and reasoning," IEEE Tcam. Syst., Man, Cybern., vol. 24, no. 9, pp. 1374-1394, Sep. 1994.
    • (1994) IEEE Tcam. Syst., Man, Cybern , vol.24 , Issue.9 , pp. 1374-1394
    • Yao, Y.1
  • 24
    • 0017634623 scopus 로고
    • Multiteam, multiproject research and development planning with GERT
    • L. J. Moore and B. W. Taylor III, "Multiteam, multiproject research and development planning with GERT," Manage. Sci., vol. 24, no. 4, pp. 401-410, 1977.
    • (1977) Manage. Sci , vol.24 , Issue.4 , pp. 401-410
    • Moore, L.J.1    Taylor III, B.W.2
  • 25
    • 0000302001 scopus 로고
    • GERT: Graphical evaluation and review technique, part I, fundamental
    • A. Pritsker and W. Happ, "GERT: Graphical evaluation and review technique, part I, fundamental," J. Ind. Eng., vol. 17, no. 5, pp. 267-274, 1966.
    • (1966) J. Ind. Eng , vol.17 , Issue.5 , pp. 267-274
    • Pritsker, A.1    Happ, W.2
  • 27
    • 0027574650 scopus 로고
    • Efficient organizing of design activities
    • A. Kusiak and J. Wang, "Efficient organizing of design activities," Int. J. Prod. Res., vol. 31, no. 4, pp. 753-769, 1993.
    • (1993) Int. J. Prod. Res , vol.31 , Issue.4 , pp. 753-769
    • Kusiak, A.1    Wang, J.2
  • 28
    • 0030718389 scopus 로고    scopus 로고
    • Generalised models of design iteration using signal flow graphs
    • S. D. Eppinger, M. V. Nukala, and D. E. Whitney, "Generalised models of design iteration using signal flow graphs," Res. Eng. Design, vol. 9, pp. 112-123, 1997.
    • (1997) Res. Eng. Design , vol.9 , pp. 112-123
    • Eppinger, S.D.1    Nukala, M.V.2    Whitney, D.E.3
  • 31
    • 0031199079 scopus 로고    scopus 로고
    • A predictive model of sequential iteration in engineering design
    • R. P. Smith and S. D. Eppinger, "A predictive model of sequential iteration in engineering design," Manage. Sci., vol. 43, no. 8, pp. 1104-1120, 1997.
    • (1997) Manage. Sci , vol.43 , Issue.8 , pp. 1104-1120
    • Smith, R.P.1    Eppinger, S.D.2
  • 32
    • 0019597497 scopus 로고
    • The design stucture system: A method for managing the design of complex system
    • Aug
    • D. V. Steward, "The design stucture system: A method for managing the design of complex system," IEEE Trans. Eng. Manage., vol. EM-28, no. 3, pp. 71-74, Aug. 1981.
    • (1981) IEEE Trans. Eng. Manage , vol.EM-28 , Issue.3 , pp. 71-74
    • Steward, D.V.1
  • 33
    • 0031084622 scopus 로고    scopus 로고
    • Identifying controlling features of engineering design iteration
    • R. P. Smith and S. D. Eppinger, "Identifying controlling features of engineering design iteration," Manage. Sci., vol. 43, no. 3, pp. 276-293, 1997.
    • (1997) Manage. Sci , vol.43 , Issue.3 , pp. 276-293
    • Smith, R.P.1    Eppinger, S.D.2
  • 34
    • 0002126104 scopus 로고    scopus 로고
    • Deciding between sequential and con-current tasks in engineering design
    • R. P. Smith and S. D. Eppinger, "Deciding between sequential and con-current tasks in engineering design," Concurrent Eng.: Res. Appl., vol. 6, no. 1, pp. 15-25, 1998.
    • (1998) Concurrent Eng.: Res. Appl , vol.6 , Issue.1 , pp. 15-25
    • Smith, R.P.1    Eppinger, S.D.2
  • 38
    • 33751565444 scopus 로고    scopus 로고
    • Modeling the product development process as a dynamic system with feedback
    • H. Z. Huang and Y. K. Gu, "Modeling the product development process as a dynamic system with feedback," Concurrent Eng.: Res. Appl., vol. 14, no. 4, pp. 283-292, 2006.
    • (2006) Concurrent Eng.: Res. Appl , vol.14 , Issue.4 , pp. 283-292
    • Huang, H.Z.1    Gu, Y.K.2
  • 39
    • 0032685073 scopus 로고    scopus 로고
    • Complementary roles of IDEFO and DSM for the modeling of information management processes
    • J. Malmstrom, P. Pikosz, and J. Malmqvist, "Complementary roles of IDEFO and DSM for the modeling of information management processes," Concurrent Eng.: Res. Appl., vol. 7, no. 2, pp. 95-103, 1999.
    • (1999) Concurrent Eng.: Res. Appl , vol.7 , Issue.2 , pp. 95-103
    • Malmstrom, J.1    Pikosz, P.2    Malmqvist, J.3
  • 40
    • 0030085934 scopus 로고    scopus 로고
    • Scheduling design activities with a pull system approach
    • Feb
    • U. Belhe and A. Kusiak, "Scheduling design activities with a pull system approach" IEEE Trans. Robot. Autom., vol. 12, no. 1, pp. 15-21, Feb. 1996.
    • (1996) IEEE Trans. Robot. Autom , vol.12 , Issue.1 , pp. 15-21
    • Belhe, U.1    Kusiak, A.2
  • 41
    • 0030283987 scopus 로고    scopus 로고
    • Managing design processes: A risk assessment approach
    • Nov
    • N. Larson and A. Kusiak, "Managing design processes: A risk assessment approach" IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 26, no. 6, pp. 749-759, Nov. 1996.
    • (1996) IEEE Trans. Syst., Man, Cybern. A, Syst., Humans , vol.26 , Issue.6 , pp. 749-759
    • Larson, N.1    Kusiak, A.2
  • 43
    • 0009380290 scopus 로고
    • Modelling the design process with Petri nets
    • H. R. Parsaei and W. G. Sullivan, Eds. FL, USA: Chapman & Hall
    • A. Kusiak and H.-H. Yang, "Modelling the design process with Petri nets," in Concurrent Engineering Contemporary Issues and Modern Design Tools, H. R. Parsaei and W. G. Sullivan, Eds. FL, USA: Chapman & Hall, 1993, pp. 449-463.
    • (1993) Concurrent Engineering Contemporary Issues and Modern Design Tools , pp. 449-463
    • Kusiak, A.1    Yang, H.-H.2
  • 44
    • 0000584704 scopus 로고
    • Concurrent engineering: Decomposition and Scheduling of design activities
    • A. Kusiak and K. Park, "Concurrent engineering: Decomposition and Scheduling of design activities," Int. J. Prod. Res., vol. 28, no. 10, pp. 1883-1900, 1990.
    • (1990) Int. J. Prod. Res , vol.28 , Issue.10 , pp. 1883-1900
    • Kusiak, A.1    Park, K.2
  • 45
    • 0031108561 scopus 로고    scopus 로고
    • A model based framework to overlap product development activities
    • V. Krishnan, S. D. Eppinger, and D. E. Whitney, "A model based framework to overlap product development activities," Manage. Sci. vol. 43, no. 4, pp. 437-451, 1997.
    • (1997) Manage. Sci , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 46
    • 0029707581 scopus 로고    scopus 로고
    • Application of a Markov model to the measurement, simulation, and diagnosis of an iterative design process
    • E. W. Johnson, L. A. Castillo, and J. B. Brockman, "Application of a Markov model to the measurement, simulation, and diagnosis of an iterative design process," in Proc. 33rd IEEE Design Autom. Conf. 1996, pp. 185-188.
    • (1996) Proc. 33rd IEEE Design Autom. Conf , pp. 185-188
    • Johnson, E.W.1    Castillo, L.A.2    Brockman, J.B.3
  • 47
    • 0032648503 scopus 로고    scopus 로고
    • Managing development risk in product design processes
    • R. Ahmadi and R. H. Wang, "Managing development risk in product design processes," Oper. Res., vol. 47, no. 2, pp. 235-246, 1999.
    • (1999) Oper. Res , vol.47 , Issue.2 , pp. 235-246
    • Ahmadi, R.1    Wang, R.H.2
  • 48
    • 0032634750 scopus 로고    scopus 로고
    • A decision analytic framework for evaluating concurrent engineering
    • May
    • A. A. Yassine, K. R. Chelst, and D. R. Falkenburg, "A decision analytic framework for evaluating concurrent engineering," IEEE Trans. Eng. Manage., vol. 46, no. 2, pp. 144-157, May 1999.
    • (1999) IEEE Trans. Eng. Manage , vol.46 , Issue.2 , pp. 144-157
    • Yassine, A.A.1    Chelst, K.R.2    Falkenburg, D.R.3
  • 49
    • 0035239282 scopus 로고    scopus 로고
    • Developing products on internet time: The anatomy of a flexible development process
    • A. MacCormack, R. Verganti, and M. Iansiti, "Developing products on internet time: The anatomy of a flexible development process," Manage. Sci., vol. 47, no. 1, pp. 133-150, 2001.
    • (2001) Manage. Sci , vol.47 , Issue.1 , pp. 133-150
    • MacCormack, A.1    Verganti, R.2    Iansiti, M.3
  • 50
    • 0000107740 scopus 로고
    • Technology integration: Managing technological evolution in a complex environment
    • M. Iansiti, "Technology integration: Managing technological evolution in a complex environment," Res. Policy, vol. 24, pp. 521-542, 1995.
    • (1995) Res. Policy , vol.24 , pp. 521-542
    • Iansiti, M.1
  • 52
    • 0019013785 scopus 로고
    • Engineering information release prior to final design freeze
    • May
    • R. M. Eastman, "Engineering information release prior to final design freeze," IEEE Trans. Eng. Manage., vol. EM-27, no. 2, pp. 37-42, May 1980.
    • (1980) IEEE Trans. Eng. Manage , vol.EM-27 , Issue.2 , pp. 37-42
    • Eastman, R.M.1
  • 53
    • 0029544690 scopus 로고
    • Accelerating product development by the exchange of preliminary product design information
    • V. Krishnan, S. Eppinger, and D. E. Whitney, "Accelerating product development by the exchange of preliminary product design information," J. Mech. Design, vol. 117, pp. 491-498, 1995.
    • (1995) J. Mech. Design , vol.117 , pp. 491-498
    • Krishnan, V.1    Eppinger, S.2    Whitney, D.E.3
  • 54
    • 23344444693 scopus 로고    scopus 로고
    • On identifying and estimating the cycle time of product development process
    • Aug
    • H.-B. Jun, H.-S. Ahn, and H.-W. Suh, "On identifying and estimating the cycle time of product development process," IEEE Trans. Eng. Manage. vol. 52, no. 3, pp. 336-349, Aug. 2005.
    • (2005) IEEE Trans. Eng. Manage , vol.52 , Issue.3 , pp. 336-349
    • Jun, H.-B.1    Ahn, H.-S.2    Suh, H.-W.3
  • 55
    • 0032140351 scopus 로고    scopus 로고
    • Communication and uncertainty in concurrent engineering
    • C. H. Loch and C. Terwiesch, "Communication and uncertainty in concurrent engineering," Manage. Sci., vol. 44, no. 8, pp. 1032-1048, 1998.
    • (1998) Manage. Sci , vol.44 , Issue.8 , pp. 1032-1048
    • Loch, C.H.1    Terwiesch, C.2
  • 56
    • 0033102403 scopus 로고    scopus 로고
    • Scheduling of design projects with uncertain number of iterations
    • P. B. Luh, F. Liu, and B. Moser, "Scheduling of design projects with uncertain number of iterations," Eur. J. Oper. Res., vol. 113, pp. 575-592, 1999.
    • (1999) Eur. J. Oper. Res , vol.113 , pp. 575-592
    • Luh, P.B.1    Liu, F.2    Moser, B.3
  • 57
    • 0031696309 scopus 로고    scopus 로고
    • A formalism to structure and parallelize the integration of cooperative engineering design tasks
    • N. Khanna, J. A. B. Fortes, and S. Y. Nof, "A formalism to structure and parallelize the integration of cooperative engineering design tasks," IIE Trans., vol. 30, pp. 1-15, 1998.
    • (1998) IIE Trans , vol.30 , pp. 1-15
    • Khanna, N.1    Fortes, J.A.B.2    Nof, S.Y.3
  • 58
    • 0020849266 scopus 로고
    • Maintaining knowledge about temporal intervals
    • J. F. Allen, "Maintaining knowledge about temporal intervals," Commun. ACM, vol. 26, no. 11, pp. 832-843, 1983.
    • (1983) Commun. ACM , vol.26 , Issue.11 , pp. 832-843
    • Allen, J.F.1
  • 59
    • 0029369186 scopus 로고
    • Optimal timing of reviews in concurrent design for manufacturability
    • A. Y. Ha and E. L. Porteus, "Optimal timing of reviews in concurrent design for manufacturability," Manage. Sci., vol. 41, no. 9, pp. 1431-1447, 1995.
    • (1995) Manage. Sci , vol.41 , Issue.9 , pp. 1431-1447
    • Ha, A.Y.1    Porteus, E.L.2
  • 60
    • 0003333819 scopus 로고    scopus 로고
    • CIM business process and enterprise activity modeling
    • F. B. Vernadat, "CIM business process and enterprise activity modeling," in Proc. IFIP TC5 Working Conf., 1996, pp. 171-182.
    • (1996) Proc. IFIP TC5 Working Conf , pp. 171-182
    • Vernadat, F.B.1
  • 62
    • 0032658132 scopus 로고    scopus 로고
    • Engineering design management: An information structure approach
    • A. A. Yassine, D. Falkenburg, and K. Chelst, "Engineering design management: An information structure approach," Int. J. Prod. Res. vol. 37, no. 13, pp. 2957-2975, 1999.
    • (1999) Int. J. Prod. Res , vol.37 , Issue.13 , pp. 2957-2975
    • Yassine, A.A.1    Falkenburg, D.2    Chelst, K.3
  • 64
    • 0029358530 scopus 로고
    • Predicting technical communication in product development organizations
    • Aug
    • M. D. Morelli, S. D. Eppinger, and R. K. Gulati, "Predicting technical communication in product development organizations," IEEE Trans. Eng. Manage., vol. 42, no. 3, pp. 215-222, Aug. 1995.
    • (1995) IEEE Trans. Eng. Manage , vol.42 , Issue.3 , pp. 215-222
    • Morelli, M.D.1    Eppinger, S.D.2    Gulati, R.K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.