Volumn 12, Issue 1, 1996, Pages 15-21

Scheduling design activities with a pull system approach

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; HEURISTIC METHODS; PROBLEM SOLVING; PROCESS CONTROL; PRODUCT DESIGN; PROJECT MANAGEMENT; RESOURCE ALLOCATION; SCHEDULING;

EID: 0030085934     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/70.481747     Document Type: Article
Times cited : (12)

References (27)
  • 1
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • K. R. Baker, "Sequencing rules and due-date assignments in a job shop," Manage. Sci., vol. 30, no. 9, pp. 1093-1104, 1984.
    • (1984) Manage. Sci. , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 3
    • 0000843040 scopus 로고
    • An algorithm for large zero-one knapsack problems
    • E. Balas and E. Zemel, "An algorithm for large zero-one knapsack problems," Operations Res., vol. 28, no. 5, pp. 1130-1154, 1980.
    • (1980) Operations Res. , vol.28 , Issue.5 , pp. 1130-1154
    • Balas, E.1    Zemel, E.2
  • 4
    • 0025385096 scopus 로고
    • Solving resource-constrained project scheduling problems by A* search
    • C. E. Bell and K. Park, "Solving resource-constrained project scheduling problems by A* search," Naval Res. Logistics, vol. 37, pp. 61-84, 1990.
    • (1990) Naval Res. Logistics , vol.37 , pp. 61-84
    • Bell, C.E.1    Park, K.2
  • 5
    • 0023362513 scopus 로고
    • Project scheduling with resource constraints: A branch and bound approach
    • N. Christofides, R. Alvarez-Valdes, and J. M. Tamarit, "Project scheduling with resource constraints: A branch and bound approach," European J. Operations Res., vol. 29, pp. 262-273, 1987.
    • (1987) European J. Operations Res. , vol.29 , pp. 262-273
    • Christofides, N.1    Alvarez-Valdes, R.2    Tamarit, J.M.3
  • 6
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • E. W. Davis and J. H. Patterson, "A comparison of heuristic and optimum solutions in resource-constrained project scheduling," Manage. Sci., vol. 21, no. 8, pp. 944-955, 1975.
    • (1975) Manage. Sci. , vol.21 , Issue.8 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 7
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • E. Demeulemeester and W. Herroelen, "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem," Manage. Sci., vol. 38, no. 12, pp. 1803-1818, 1992.
    • (1992) Manage. Sci. , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 9
    • 0001215033 scopus 로고
    • The analysis of activity networks under generalized precedence relations (GPRs)
    • S. E. Elmaghraby and J. Kamburowski, "The analysis of activity networks under generalized precedence relations (GPRs)," Manage. Sci., vol. 38, no. 9, pp. 1245-1263, 1992.
    • (1992) Manage. Sci. , vol.38 , Issue.9 , pp. 1245-1263
    • Elmaghraby, S.E.1    Kamburowski, J.2
  • 10
    • 0015361193 scopus 로고
    • An algorithm for project sequencing with resource constraints
    • S. Gorenstein, "An algorithm for project sequencing with resource constraints," Operations Res., vol. 20, no. 4, pp. 835-850, 1972.
    • (1972) Operations Res. , vol.20 , Issue.4 , pp. 835-850
    • Gorenstein, S.1
  • 11
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • R. L. Graham, E. L. Lawler, J. K. Lenstra, and A. H. G. Rinnoy Kan, "Optimization and approximation in deterministic sequencing and scheduling: A survey," Ann. Discrete Math., vol. 5, pp. 287-326, 1979.
    • (1979) Ann. Discrete Math. , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnoy Kan, A.H.G.4
  • 12
    • 0019585243 scopus 로고
    • A review of production scheduling
    • S. C. Graves, "A review of production scheduling," Operations Res., vol. 29, no. 4, pp. 646-675, 1981.
    • (1981) Operations Res. , vol.29 , Issue.4 , pp. 646-675
    • Graves, S.C.1
  • 14
    • 0003037529 scopus 로고
    • Reducibility among combinatorial problems
    • R. E. Miller and J. W. Thatcher, Eds. New York: Plenum
    • R. Karp, "Reducibility among combinatorial problems," in Complexity of Computer Computations, R. E. Miller and J. W. Thatcher, Eds. New York: Plenum, 1972, pp. 85-103.
    • (1972) Complexity of Computer Computations , pp. 85-103
    • Karp, R.1
  • 15
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rule performance
    • I. Kurtulus and E. W. Davis, "Multi-project scheduling: Categorization of heuristic rule performance," Manage. Sci., vol. 28, no. 2, pp. 161-172, 1982.
    • (1982) Manage. Sci. , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.1    Davis, E.W.2
  • 16
    • 0022025928 scopus 로고
    • Multi-project scheduling: Analysis of project performance
    • I. Kurtulus and S. C. Narula, "Multi-project scheduling: Analysis of project performance," IIE Trans., vol. 17, no. 1, pp. 58-66, 1985.
    • (1985) IIE Trans. , vol.17 , Issue.1 , pp. 58-66
    • Kurtulus, I.1    Narula, S.C.2
  • 17
    • 0028766749 scopus 로고
    • Design of components for schedulability
    • A. Kusiak and W. He, "Design of components for schedulability, Europen J. Operational Res., vol. 76, pp. 49-59, 1994.
    • (1994) Europen J. Operational Res. , vol.76 , pp. 49-59
    • Kusiak, A.1    He, W.2
  • 19
    • 33748013428 scopus 로고
    • Management of product design: A strategic approach
    • A. Kusiak, Ed. New York: Wiley
    • D. N. Mallick and P. Kouvelis, "Management of product design: A strategic approach," in Intelligent Design and Manufacturing, A. Kusiak, Ed. New York: Wiley, 1992, pp. 157-178.
    • (1992) Intelligent Design and Manufacturing , pp. 157-178
    • Mallick, D.N.1    Kouvelis, P.2
  • 21
    • 0003449926 scopus 로고
    • Atlanta. GA: Ind. Eng. Manage.
    • Y. Monden, Toyota Production System. Atlanta. GA: Ind. Eng. Manage., 1983, pp. 13-28.
    • (1983) Toyota Production System , pp. 13-28
    • Monden, Y.1
  • 22
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource projecl scheduling problem
    • J. H. Patterson, "A comparison of exact approaches for solving the multiple constrained resource projecl scheduling problem," Manage. Sci., vol. 30, no. 7, pp. 854-867, 1984.
    • (1984) Manage. Sci. , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 23
    • 0020748381 scopus 로고
    • Stochastic scheduling with release dates and due dates
    • M. Pinedo, "Stochastic scheduling with release dates and due dates," Operations Res., vol. 31, no. 3, pp. 559-572, 1983.
    • (1983) Operations Res. , vol.31 , Issue.3 , pp. 559-572
    • Pinedo, M.1
  • 24
    • 0000478729 scopus 로고
    • Solving resource-constrained network problems by implicit enumeration - Non preemptive case
    • L. Schrage, "Solving resource-constrained network problems by implicit enumeration - Non preemptive case," Operations Res., vol. 18, pp. 263-278, 1970.
    • (1970) Operations Res. , vol.18 , pp. 263-278
    • Schrage, L.1
  • 25
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • J. P. Stinson, E. W. Davis, and B. M. Khumawala, "Multiple resource-constrained scheduling using branch and bound," AIIE Trans., vol. 10, no. 3, pp. 252-259, 1978.
    • (1978) AIIE Trans. , vol.10 , Issue.3 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 26
    • 0002381223 scopus 로고
    • Machine sequencing via disjunctive graphs: An implicit enumeration algorithm
    • E. Balas, "Machine sequencing via disjunctive graphs: An implicit enumeration algorithm," Operations Res., vol. 17, no. 6, pp. 941-957, 1969.
    • (1969) Operations Res. , vol.17 , Issue.6 , pp. 941-957
    • Balas, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.