메뉴 건너뛰기




Volumn 4, Issue , 2001, Pages 85-94

Product development process modeling using advanced simulation

Author keywords

Design structure matrix; Iteration; Project management; Project simulation

Indexed keywords

COMPUTER SIMULATION; INFORMATION DISSEMINATION; INFORMATION MANAGEMENT; PLANNING; PROBABILITY DISTRIBUTIONS; PROJECT MANAGEMENT; RESOURCE ALLOCATION; SCHEDULING; PROCESS ENGINEERING; PRODUCT DEVELOPMENT; RANDOM PROCESSES; STOCHASTIC SYSTEMS;

EID: 0035790658     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (98)

References (39)
  • 6
    • 0001501655 scopus 로고
    • Application of a technique for research and development program evaluation
    • Malcolm, D., Roseboom, J., Clark, C. and Fazar, W., "Application of a Technique for Research and Development Program Evaluation," Operations Research, 7, pp. 646-669, 1959.
    • (1959) Operations Research , vol.7 , pp. 646-669
    • Malcolm, D.1    Roseboom, J.2    Clark, C.3    Fazar, W.4
  • 7
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J., "A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem," Management Science, 30, pp. 854-867, 1984.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.1
  • 8
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource-constrained projects: An experimental investigation
    • Cooper, D., "Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation," Management Science, 22, pp. 1186-1194, 1976.
    • (1976) Management Science , vol.22 , pp. 1186-1194
    • Cooper, D.1
  • 10
    • 0242711263 scopus 로고    scopus 로고
    • Modeling the impact of process architecture on cost and schedule risk in product development
    • Working Paper No. 4050, Sloan School of Management, MIT
    • Browning, T. and Eppinger, S., "Modeling the Impact of Process Architecture on Cost and Schedule Risk in Product Development," Working Paper No. 4050, Sloan School of Management, MIT, 2000.
    • (2000)
    • Browning, T.1    Eppinger, S.2
  • 11
    • 0019597497 scopus 로고
    • The design structure system: A method for managing the design of complex systems
    • Steward, D., "The Design Structure System: A Method for Managing the Design of Complex Systems," IEEE Transactions on Engineering Management, EM-28, 1981.
    • (1981) IEEE Transactions on Engineering Management , vol.EM-28
    • Steward, D.1
  • 14
    • 0001876346 scopus 로고
    • R&D project planning with Q-GERT network modeling
    • Taylor, B. and Moore, L., "R&D Project Planning with Q-GERT Network Modeling," Management Science, 26, pp. 44-59, 1980.
    • (1980) Management Science , vol.26 , pp. 44-59
    • Taylor, B.1    Moore, L.2
  • 15
    • 0031199079 scopus 로고    scopus 로고
    • A predictive model of sequential iteration in engineering design
    • Smith, R. and Eppinger, S., "A Predictive Model of Sequential Iteration in Engineering Design," Management Science, 43, pp. 1104-1120, 1997.
    • (1997) Management Science , vol.43 , pp. 1104-1120
    • Smith, R.1    Eppinger, S.2
  • 16
    • 0003410337 scopus 로고
    • Rationalizing product design development process
    • Working Paper, Anderson Graduate School of Management, UCLA
    • Ahmadi, R., and Hongbo, W., "Rationalizing Product Design Development Process," Working Paper, Anderson Graduate School of Management, UCLA, 1994.
    • (1994)
    • Ahmadi, R.1    Hongbo, W.2
  • 17
    • 0030718389 scopus 로고    scopus 로고
    • Generalized models of design iteration using signal flow graphs
    • Eppinger, S., Nukala, M. and Whitney, D., "Generalized Models of Design Iteration Using Signal Flow Graphs," Research in Engineering Design, 9, pp. 112-123, 1997.
    • (1997) Research in Engineering Design , vol.9 , pp. 112-123
    • Eppinger, S.1    Nukala, M.2    Whitney, D.3
  • 20
    • 0004173557 scopus 로고
    • Limits to concurrency
    • Working Paper, Vanderbilt University Owen School of Management
    • Hoedemaker, G., Blackburn, J. and Wassenhove, L., "Limits to Concurrency," Working Paper, Vanderbilt University Owen School of Management, 1995.
    • (1995)
    • Hoedemaker, G.1    Blackburn, J.2    Wassenhove, L.3
  • 21
    • 0031084622 scopus 로고    scopus 로고
    • Identifying controlling features of engineering design iteration
    • Smith, R. and Eppinger, S., "Identifying Controlling Features of Engineering Design Iteration," Management Science, 43, pp. 276-293, 1997.
    • (1997) Management Science , vol.43 , pp. 276-293
    • Smith, R.1    Eppinger, S.2
  • 23
    • 0029369186 scopus 로고
    • Optimal timing of reviews in the concurrent design for manufacturability
    • Ha, A. and Porteus, E., "Optimal Timing of Reviews in the Concurrent Design for Manufacturability," Management Science, 41, pp. 1431-1447, 1995.
    • (1995) Management Science , vol.41 , pp. 1431-1447
    • Ha, A.1    Porteus, E.2
  • 24
    • 0031108561 scopus 로고    scopus 로고
    • A model-based framework to overlap product development activities
    • Krishnan, A., Eppinger, S. and Whitney, D., "A Model-Based Framework to Overlap Product Development Activities," Management Science, 43, pp.437-451, 1997.
    • (1997) Management Science , vol.43 , pp. 437-451
    • Krishnan, A.1    Eppinger, S.2    Whitney, D.3
  • 25
    • 0032140351 scopus 로고    scopus 로고
    • Communication and uncertainty in concurrent engineering
    • Loch, C. and Terwiesch, C. "Communication and Uncertainty in Concurrent Engineering," Management Science, 44, pp. 1032-1048, 1998.
    • (1998) Management Science , vol.44 , pp. 1032-1048
    • Loch, C.1    Terwiesch, C.2
  • 26
    • 0000858254 scopus 로고
    • From project to process management: An empirically-based framework for analyzing product development time
    • Adler, P., Mandelbaum, A., Nguyen, V. and Schwerer, E., "From Project to Process Management: An Empirically-based Framework for Analyzing Product Development Time," Management Science, 41, pp. 458-484, 1995.
    • (1995) Management Science , vol.41 , pp. 458-484
    • Adler, P.1    Mandelbaum, A.2    Nguyen, V.3    Schwerer, E.4
  • 27
    • 0034313848 scopus 로고    scopus 로고
    • Time-cost trade-offs in overlapped product development
    • Roemer, T., Ahmadi, R. and Wang, R., "Time-Cost Trade-Offs in Overlapped Product Development," Operations Research, 48, pp. 858-865, 2000.
    • (2000) Operations Research , vol.48 , pp. 858-865
    • Roemer, T.1    Ahmadi, R.2    Wang, R.3
  • 29
    • 0026837875 scopus 로고
    • Practical use of distributions in network analysis
    • Williams, T., "Practical Use of Distributions in Network Analysis," Journal of the Operational Research Society, 43, pp. 265-270, 1992.
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 265-270
    • Williams, T.1
  • 30
    • 0001378333 scopus 로고
    • Better estimation of PERT activity
    • Keefer, D. and Verdini, W., "Better Estimation of PERT Activity Management Science, 39, pp. 1086-1091, 1993.
    • (1993) Management Science , vol.39 , pp. 1086-1091
    • Keefer, D.1    Verdini, W.2
  • 31
    • 0018468345 scopus 로고
    • A comparison of three methods for selecting values of input variables in the analysis of output from a computer code
    • McKay, M., Beckman, R. and Canover, W., "A Comparison of Three Methods for Selecting Values of Input Variables in the Analysis of Output from a Computer Code," Technometrics, 21, pp. 239-245, 1979.
    • (1979) Technometrics , vol.21 , pp. 239-245
    • McKay, M.1    Beckman, R.2    Canover, W.3
  • 35
    • 0003913594 scopus 로고    scopus 로고
    • Modeling and analyzing cost, schedule, and performance in complex system product development
    • Ph.D. Thesis (TMP), MIT, Cambridge, MA
    • Browning, T., "Modeling and Analyzing Cost, Schedule, and Performance in Complex System Product Development," Ph.D. Thesis (TMP), MIT, Cambridge, MA, 1998.
    • (1998)
    • Browning, T.1
  • 36
  • 39
    • 0003916034 scopus 로고
    • Simulation of information flow in design
    • Ph.D. Thesis (ME), MIT, Cambridge, MA
    • Christian, A., "Simulation of Information Flow in Design," Ph.D. Thesis (ME), MIT, Cambridge, MA, 1995.
    • (1995)
    • Christian, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.