"A structured approach for analysis of design processes"
-
A. Kusiak, J. Wang, D. W. He, and C. Feng, "A structured approach for analysis of design processes," IEEE Trans. Compon. Packag. Manuf. Technol. A, vol. 18, no. 3, pp. 664-673, 1995.
-
(1995)
IEEE Trans. Compon. Packag. Manuf. Technol. A
, vol.18
, Issue.3
, pp. 664-673
-
-
Kusiak, A.1
Wang, J.2
He, D.W.3
Feng, C.4
-
2
-
-
23344440165
-
"Planning and control of concurrent engineering activities under uncertainty"
-
S. Y. Nof, "Planning and control of concurrent engineering activities under uncertainty," Inf. Collaboration Models Integr., pp. 9-25, 1994.
-
(1994)
Inf. Collaboration Models Integr.
, pp. 9-25
-
-
Nof, S.Y.1
-
4
-
-
0031599608
-
"A unified framework for modeling cooperative design processes and cooperative business processes"
-
C. Rolland et al., "A unified framework for modeling cooperative design processes and cooperative business processes," in Proc. 31st Hawaii Int. Conf. Syst. Sci., vol. 5, 1998, pp. 376-385.
-
(1998)
Proc. 31st Hawaii Int. Conf. Syst. Sci.
, vol.5
, pp. 376-385
-
-
Rolland, C.1
-
5
-
-
23344445905
-
"Product development process modeling considering patterns of the design activity"
-
Korea Advanced Inst. Sci. Technol. (KAIST), Daejeon, Korea, Working Paper
-
H. B. Jun and H. W. Suh, "Product development process modeling considering patterns of the design activity," Korea Advanced Inst. Sci. Technol. (KAIST), Daejeon, Korea, 2002. Working Paper.
-
(2002)
-
-
Jun, H.B.1
Suh, H.W.2
-
6
-
-
0032634750
-
"A decision analytic framework for evaluating concurrent engineering"
-
May
-
A. A. Yassine, K. R. Chelst, and D. R. Falkenburg, "A decision analytic framework for evaluating concurrent engineering," IEEE Trans. Eng. Manage., vol. 46, no. 2, pp. 144-157, May 1999.
-
(1999)
IEEE Trans. Eng. Manage.
, vol.46
, Issue.2
, pp. 144-157
-
-
Yassine, A.A.1
Chelst, K.R.2
Falkenburg, D.R.3
-
7
-
-
0031199079
-
"A predictive model of sequential iteration in engineering design"
-
R. P. Smith and S. D. Eppinger, "A predictive model of sequential iteration in engineering design," Manage. Sci., vol. 43, no. 8, pp. 1104-1120, 1997.
-
(1997)
Manage. Sci.
, vol.43
, Issue.8
, pp. 1104-1120
-
-
Smith, R.P.1
Eppinger, S.D.2
-
8
-
-
0030388233
-
"Modeling relationships among design activities"
-
U. Belhe and A. Kusiak, "Modeling relationships among design activities," ASME Trans. J. Mech. Design, vol. 118, no. 4, pp. 454-460, 1996.
-
(1996)
ASME Trans. J. Mech. Design
, vol.118
, Issue.4
, pp. 454-460
-
-
Belhe, U.1
Kusiak, A.2
-
9
-
-
0036881796
-
"Modeling impacts of process architecture on cost and schedule risk in product development"
-
Nov.
-
T. Browning and S. Eppinger, "Modeling impacts of process architecture on cost and schedule risk in product development," IEEE Trans. Eng. Manage., vol. 49, no. 4, pp. 428-441, Nov. 2002.
-
(2002)
IEEE Trans. Eng. Manage.
, vol.49
, Issue.4
, pp. 428-441
-
-
Browning, T.1
Eppinger, S.2
-
10
-
-
0029369186
-
"Optimal timing of reviews in concurrent design for manufacturability"
-
Sep.
-
A. Y. Ha and E. L. Porteus, "Optimal timing of reviews in concurrent design for manufacturability," Manage. Sci., vol. 41, no. 9, pp. 1431-1447, Sep. 1995.
-
(1995)
Manage. Sci.
, vol.41
, Issue.9
, pp. 1431-1447
-
-
Ha, A.Y.1
Porteus, E.L.2
-
11
-
-
0031108561
-
"A model-based framework to overlap product development activities"
-
V. Krishnan, S. D. Eppinger, and D. E. Whitney, "A model-based framework to overlap product development activities," Manage. Sci., vol. 43, no. 4, pp. 437-451, 1997.
-
(1997)
Manage. Sci.
, vol.43
, Issue.4
, pp. 437-451
-
-
Krishnan, V.1
Eppinger, S.D.2
Whitney, D.E.3
-
12
-
-
0029544690
-
"Accelerating product development by the exchange of preliminary product design information"
-
Dec.
-
V. Krishnan, S. D. Eppinger, and D. E. Whitney, "Accelerating product development by the exchange of preliminary product design information," J. Mech. Design, vol. 117, pp. 491-498, Dec. 1995.
-
(1995)
J. Mech. Design
, vol.117
, pp. 491-498
-
-
Krishnan, V.1
Eppinger, S.D.2
Whitney, D.E.3
-
13
-
-
0032140351
-
"Communication and uncertainty in concurrent engineering"
-
Aug.
-
C. H. Loch and C. Terwiesch, "Communication and uncertainty in concurrent engineering," Manage. Sci., vol. 44, no. 8, pp. 1032-1048, Aug. 1998.
-
(1998)
Manage. Sci.
, vol.44
, Issue.8
, pp. 1032-1048
-
-
Loch, C.H.1
Terwiesch, C.2
-
14
-
-
0034313848
-
"Time-cost tradeoffs in overlapped product development"
-
T. Roemer, R. Ahmadi, and R. Wang, "Time-cost tradeoffs in overlapped product development," Oper. Res., vol. 48, no. 6, pp. 858-865, 2000.
-
(2000)
Oper. Res.
, vol.48
, Issue.6
, pp. 858-865
-
-
Roemer, T.1
Ahmadi, R.2
Wang, R.3
-
15
-
-
0035707626
-
"Performance of coupled product development activities with a deadline"
-
N. Joglekar, A. Yassine, S. Eppinger, and D. Whitney, "Performance of coupled product development activities with a deadline," Manage. Sci., vol. 47, no. 12, pp. 1605-1620, 2001.
-
(2001)
Manage. Sci.
, vol.47
, Issue.12
, pp. 1605-1620
-
-
Joglekar, N.1
Yassine, A.2
Eppinger, S.3
Whitney, D.4
-
16
-
-
0035900050
-
"Ovelapping design and build cycles in product development"
-
A. Chakravarty, "Ovelapping design and build cycles in product development," Eur. J. Oper. Res., vol. 134, pp. 392-424, 2001.
-
(2001)
Eur. J. Oper. Res.
, vol.134
, pp. 392-424
-
-
Chakravarty, A.1
-
17
-
-
0029707581
-
"Application of a Markov model to the measurement, simulation, and diagnosis of an iterative design process"
-
E. W. Johnson, L. A. Castillo, and J. B. Brockman, "Application of a Markov model to the measurement, simulation, and diagnosis of an iterative design process," in Proc. 33rd IEEE Design Autom. Conf., 1996, pp. 185-188.
-
(1996)
Proc. 33rd IEEE Design Autom. Conf.
, pp. 185-188
-
-
Johnson, E.W.1
Castillo, L.A.2
Brockman, J.B.3
-
18
-
-
0030393683
-
"Sensitivity analysis of iterative design processes"
-
ICCAD Dig. Tech. Papers
-
E. W. Johnson, J. B. Brockman, and R. Vigeland, "Sensitivity analysis of iterative design processes," in Proc. 1996 IEEE/ACM Int. Conf. Comput. Aided Design, ICCAD Dig. Tech. Papers, 1996, pp. 142-145.
-
(1996)
Proc. 1996 IEEE/ACM Int. Conf. Comput. Aided Design
, pp. 142-145
-
-
Johnson, E.W.1
Brockman, J.B.2
Vigeland, R.3
-
19
-
-
84965520647
-
"Performance analysis of design process using timed petri nets"
-
U. Belhe and A. Kusiak, "Performance analysis of design process using timed petri nets," Concurrent Eng. Res. Appl., no. 1, pp. 147-152, 1993.
-
(1993)
Concurrent Eng. Res. Appl.
, Issue.1
, pp. 147-152
-
-
Belhe, U.1
Kusiak, A.2
-
20
-
-
0030147006
-
"Managing the simultaneous execution of coupled phases in concurrent product development"
-
May
-
V. Krishnan, "Managing the simultaneous execution of coupled phases in concurrent product development," IEEE Trans. Eng. Manage., vol. 43, no, 2, pp. 210-217, May 1996.
-
(1996)
IEEE Trans. Eng. Manage.
, vol.43
, Issue.2
, pp. 210-217
-
-
Krishnan, V.1
-
21
-
-
0030718389
-
"Generalized models of design iteration using signal flow graphs"
-
S. D. Eppinger, M. V. Nukala, and D. E. Whitney, "Generalized models of design iteration using signal flow graphs," Res. Eng. Design, vol. 9, pp. 112-123, 1997.
-
(1997)
Res. Eng. Design
, vol.9
, pp. 112-123
-
-
Eppinger, S.D.1
Nukala, M.V.2
Whitney, D.E.3
-
22
-
-
0029773444
-
"The iterative component of design"
-
M. J. Safoutin and R. P. Smith, "The iterative component of design," in Proc. IEMC 96, 1996, pp. 564-568.
-
(1996)
Proc. IEMC '96
, pp. 564-568
-
-
Safoutin, M.J.1
Smith, R.P.2
-
23
-
-
0019597497
-
"The design structure system: A method for managing the design of complex systems"
-
D. V. Steward, "The design structure system: a method for managing the design of complex systems," IEEE Trans. Eng. Manage., vol. EM-28, no. 3, pp. 71-74, 1981.
-
(1981)
IEEE Trans. Eng. Manage.
, vol.EM-28
, Issue.3
, pp. 71-74
-
-
Steward, D.V.1
-
25
-
-
0027656564
-
"The value and limitations of using process models to describe the manufacturing organization"
-
J. S. Busby and G. M. Williams, "The value and limitations of using process models to describe the manufacturing organization," Int. J. Prod. Res., vol. 31, no. 9, pp. 2179-2194, 1993.
-
(1993)
Int. J. Prod. Res.
, vol.31
, Issue.9
, pp. 2179-2194
-
-
Busby, J.S.1
Williams, G.M.2
-
27
-
-
0019013785
-
"Engineering information release prior to final design freeze"
-
May
-
R. M. Eastman, "Engineering information release prior to final design freeze," IEEE Trans. Eng. Manage., vol. EM-27, no. 2, pp. 37-42, May 1980.
-
(1980)
IEEE Trans. Eng. Manage.
, vol.EM-27
, Issue.2
, pp. 37-42
-
-
Eastman, R.M.1
-
28
-
-
0029306335
-
"Is concurrent engineering always a sensible proposition?"
-
F. Aitsahlia, E. Jhonson, and P. Will, "Is concurrent engineering always a sensible proposition?," IEEE Trans. Eng. Manage., vol. 42, no. 2, pp. 166-170, 1995.
-
(1995)
IEEE Trans. Eng. Manage.
, vol.42
, Issue.2
, pp. 166-170
-
-
Aitsahlia, F.1
Jhonson, E.2
Will, P.3
-
29
-
-
0032269007
-
"Design and analysis of workflow processes with petri nets"
-
(of 5) San Diego, CA, Oct. 11-14
-
C. Covés, D. Crestani, and F. Prunet, "Design and analysis of workflow processes with petri nets," in Proc. IEEE Int. Con. Syst., Man, Cybern., Part 1 (of 5), vol. 1, San Diego, CA, Oct. 11-14, 1998.
-
(1998)
Proc. IEEE Int. Con. Syst., Man, Cybern.
, vol.1
, Issue.PART 1
-
-
Covés, C.1
Crestani, D.2
Prunet, F.3
-
32
-
-
0004083930
-
"Information integration for concurrent engineering (IICE) - The IDEF3 process description capture method report"
-
Knowledge Based Systems, Inc.
-
R. J. Mayer, T. P. Cullinane, P. S. de Witte, W. B. Knappenberger, B. Perakath, and M. S. Wells, "Information integration for concurrent engineering (IICE) - The IDEF3 process description capture method report," Knowledge Based Systems, Inc., 1995.
-
(1995)
-
-
Mayer, R.J.1
Cullinane, T.P.2
deWitte, P.S.3
Knappenberger, W.B.4
Perakath, B.5
Wells, M.S.6
-
33
-
-
0000571953
-
"Analyzing process models using graph reduction techniques"
-
W. Sadiq and M. E. Orlowska, "Analyzing process models using graph reduction techniques," Inf. Syst., vol. 25, no. 2, pp. 117-134, 2000.
-
(2000)
Inf. Syst.
, vol.25
, Issue.2
, pp. 117-134
-
-
Sadiq, W.1
Orlowska, M.E.2
-
34
-
-
84989431553
-
"The learning curve: Historical review and comprehensive survey"
-
Apr.
-
L. E. Yelle, "The learning curve: historical review and comprehensive survey," Dec. Sci., vol. 10, no. 2, pp. 302-328, Apr. 1979.
-
(1979)
Dec. Sci.
, vol.10
, Issue.2
, pp. 302-328
-
-
Yelle, L.E.1
-
35
-
-
0027574650
-
"Efficient organizing of design activities"
-
A. Kusiak and J. Wang, "Efficient organizing of design activities," Int. J. Prod. Res., vol. 31, no. 4, pp. 753-769, 1993.
-
(1993)
Int. J. Prod. Res.
, vol.31
, Issue.4
, pp. 753-769
-
-
Kusiak, A.1
Wang, J.2
-
36
-
-
21344461152
-
"Modeling coordination in software construction: An analytical approach"
-
M. V. Koushik and V. S. Mookerjee, "Modeling coordination in software construction: An analytical approach," Inf. Syst. Res.: J. Inst. Manage. Sci., vol. 6, no. 3, pp. 220-254, 1995.
-
(1995)
Inf. Syst. Res.: J. Inst. Manage. Sci.
, vol.6
, Issue.3
, pp. 220-254
-
-
Koushik, M.V.1
Mookerjee, V.S.2
|