Volumn 138, Issue 1, 2005, Pages 21-52

Schedule generation schemes for the job-shop problem with sequence-dependent setup times: Dominance properties and computational analysis

Author keywords

Dominance properties; Job shop; Priority rules; Schedule generation scheme; Scheduling theory; Sequence dependent setup times

Indexed keywords


EID: 24144468136     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-005-2443-4     Document Type: Article
Times cited : (51)

References (21)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for jobshop scheduling
    • Adams, J., E. Balas, and D. Zawack. (1988). "The Shifting Bottleneck Procedure for Jobshop Scheduling." Management Science 34, 391-401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi, A., J.N.D. Gupta, and T. Aldowaisan. (1999). "A Review of Scheduling Research Involving Setup Considerations." Omega 27, 219-239.
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 3
    • 0036507645 scopus 로고    scopus 로고
    • An efficient algorithm for operation insertion in practical jobshop schedules
    • Artigues, C. and F. Roubellat. (2002). "An Efficient Algorithm for Operation Insertion in Practical Jobshop Schedules." Production Planning and Control 13(2), 175-186.
    • (2002) Production Planning and Control , vol.13 , Issue.2 , pp. 175-186
    • Artigues, C.1    Roubellat, F.2
  • 5
    • 0001343733 scopus 로고    scopus 로고
    • A branch and bound method for the general-shop problem with sequence-dependent setup times
    • Brucker, P. and O. Thiele. (1996). "A Branch and Bound Method for the General-Shop Problem with Sequence-Dependent Setup Times." Operations Research Spektrum 18, 145-161.
    • (1996) Operations Research Spektrum , vol.18 , pp. 145-161
    • Brucker, P.1    Thiele, O.2
  • 6
    • 0042857495 scopus 로고    scopus 로고
    • An exact method for solving the multi-processor flow-shop
    • Carlier, J. and E. Néron. (2000). "An Exact Method for Solving the Multi-Processor Flow-Shop." RAIRO Operations Research 34(1), 1-25.
    • (2000) RAIRO Operations Research , vol.34 , Issue.1 , pp. 1-25
    • Carlier, J.1    Néron, E.2
  • 8
    • 0000131281 scopus 로고
    • Algorithms for solving production scheduling problems
    • Giffler, B. and G.L. Thompson. (1960). "Algorithms for Solving Production Scheduling Problems." Operations Research 8(4), 487-503.
    • (1960) Operations Research , vol.8 , Issue.4 , pp. 487-503
    • Giffler, B.1    Thompson, G.L.2
  • 9
    • 84952243184 scopus 로고
    • N jobs and m machines job-shop problems with sequence-dependent set-up times
    • Gupta, S.K. (1986). "N Jobs and m Machines Job-Shop Problems with Sequence-Dependent Set-up Times." International Journal of Production Research 20(5), 643-656.
    • (1986) International Journal of Production Research , vol.20 , Issue.5 , pp. 643-656
    • Gupta, S.K.1
  • 10
    • 0035681031 scopus 로고    scopus 로고
    • List scheduling in a parallel machine environment with precedence constraints and setup times
    • Hurink, J. and S. Knust. (2001). "List Scheduling in a Parallel Machine Environment with Precedence Constraints and Setup Times." Operations Research Letters 29, 231-239.
    • (2001) Operations Research Letters , vol.29 , pp. 231-239
    • Hurink, J.1    Knust, S.2
  • 11
    • 0028462998 scopus 로고
    • Impact of sequence-dependent setup time on job shop scheduling performance
    • Kim, S.C. and P.M. Bobrowski. (1994). "Impact of Sequence-Dependent Setup Time on Job Shop Scheduling Performance." International Journal of Production Research 32(7), 1503-1520.
    • (1994) International Journal of Production Research , vol.32 , Issue.7 , pp. 1503-1520
    • Kim, S.C.1    Bobrowski, P.M.2
  • 13
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch, R. (1996). "Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation." European Journal of Operational Research 90, 320-333.
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 14
    • 84873010093 scopus 로고    scopus 로고
    • Solving two production scheduling problems with sequence-dependent set-up times
    • Department of Economics and Business, Universitat Pompeu Fabra
    • Noivo, J.A. and H. Ramalhinho-Lourenço. (1998). "Solving Two Production Scheduling Problems with Sequence-Dependent Set-Up Times." Economic Working Paper Series n. 338, Department of Economics and Business, Universitat Pompeu Fabra.
    • (1998) Economic Working Paper Series N. 338 , vol.338
    • Noivo, J.A.1    Ramalhinho-Lourenço, H.2
  • 15
    • 38249000304 scopus 로고
    • Worst-case error bounds for parallel machine scheduling problems with bounded sequence-dependent setup times
    • Ovacik, I.M. and R. Uzsoy. (1993). "Worst-Case Error Bounds for Parallel Machine Scheduling Problems with Bounded Sequence-Dependent Setup Times." Operations Research Letters 14, 251-256.
    • (1993) Operations Research Letters , vol.14 , pp. 251-256
    • Ovacik, I.M.1    Uzsoy, R.2
  • 16
    • 0028585426 scopus 로고
    • Exploiting shop floor status information to schedule complex job shops
    • Ovacik, I.M. and R. Uzsoy. (1994). "Exploiting Shop Floor Status Information to Schedule Complex Job Shops." Journal of Manufacturing Systems 13, 73-84.
    • (1994) Journal of Manufacturing Systems , vol.13 , pp. 73-84
    • Ovacik, I.M.1    Uzsoy, R.2
  • 19
    • 0033283788 scopus 로고    scopus 로고
    • On the application of insertion techniques for job shop problems with setup times
    • Sotskov, Y.N., T. Tautenhahn, and F. Werner. (1999). "On the Application of Insertion Techniques for Job Shop Problems with Setup Times." RAIRO Operations Research 33(2), 209-245.
    • (1999) RAIRO Operations Research , vol.33 , Issue.2 , pp. 209-245
    • Sotskov, Y.N.1    Tautenhahn, T.2    Werner, F.3
  • 20
    • 0029636114 scopus 로고
    • Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
    • Sprecher, A., R. Kolisch, and A. Drexl. (1995). "Semi-Active, Active, and Non-Delay Schedules for the Resource-Constrained Project Scheduling Problem." European Journal of Operational Research 80, 94-102.
    • (1995) European Journal of Operational Research , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3
  • 21
    • 0033078946 scopus 로고    scopus 로고
    • Survey of scheduling research involving setup times
    • Yang, W.-H. and C.-J. Liao. (1999). "Survey of Scheduling Research Involving Setup Times." International Journal of Systems Science 30(2), 143-155.
    • (1999) International Journal of Systems Science , vol.30 , Issue.2 , pp. 143-155
    • Yang, W.-H.1    Liao, C.-J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.