-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
J. Adams, E. Balas and D. Zawack, The shifting bottleneck procedure for job shop scheduling, Management Science 34(1989)391-401.
-
(1989)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0026126118
-
A computational study of the job shop scheduling problem
-
D. Applegate and W. Cook, A computational study of the job shop scheduling problem, ORSA Journal on Computing 3(1991)149-156.
-
(1991)
ORSA Journal on Computing
, vol.3
, pp. 149-156
-
-
Applegate, D.1
Cook, W.2
-
4
-
-
0003347011
-
Dispatching
-
chapter 83 G. Salvendy, ed., Wiley, New York
-
K. Bhaskaran and M. Pinedo, Dispatching, chapter 83 in: Handbook of Industrial Engineering, G. Salvendy, ed., Wiley, New York, 1992, pp. 2182-2198.
-
(1992)
Handbook of Industrial Engineering
, pp. 2182-2198
-
-
Bhaskaran, K.1
Pinedo, M.2
-
6
-
-
0000165767
-
An algorithm for solving the job shop problem
-
J. Carlier and E. Pinson, An algorithm for solving the job shop problem, Management Science 35(1989)164-176.
-
(1989)
Management Science
, vol.35
, pp. 164-176
-
-
Carlier, J.1
Pinson, E.2
-
7
-
-
84987012917
-
Technical note: A simple model for optimizing the single machine early/tardy problem with sequence-dependent setups
-
B.J. Coleman, Technical note: A simple model for optimizing the single machine early/tardy problem with sequence-dependent setups, Production and Operations Management 1(1992)225-228.
-
(1992)
Production and Operations Management
, vol.1
, pp. 225-228
-
-
Coleman, B.J.1
-
9
-
-
0000153731
-
A sequencing heuristic for dependent setups in a batch process industry
-
G.K. Leong and M.D. Oliff, A sequencing heuristic for dependent setups in a batch process industry, OMEGA 18(1990)283-297.
-
(1990)
OMEGA
, vol.18
, pp. 283-297
-
-
Leong, G.K.1
Oliff, M.D.2
-
10
-
-
0000399511
-
Rinnooy Kan, Computational complexity of discrete optimization problems
-
J.K. Lenstra and A.H.G. Rinnooy Kan, Computational complexity of discrete optimization problems, Annals of Discrete Mathematics 4(1979)121-140.
-
(1979)
Annals of Discrete Mathematics
, vol.4
, pp. 121-140
-
-
Lenstra, J.K.1
Rinnooy Kan, A.H.G.2
-
11
-
-
0024736520
-
On the complexity of scheduling with batch setup times
-
C.L. Monma and S.N. Potts, On the complexity of scheduling with batch setup times, Operations Research 37(1989)798-804.
-
(1989)
Operations Research
, vol.37
, pp. 798-804
-
-
Monma, C.L.1
Potts, S.N.2
-
14
-
-
0001443508
-
A shifting bottleneck algorithm for scheduling semiconductor testing operations
-
I.M. Ovacik and R. Uzsoy, A shifting bottleneck algorithm for scheduling semiconductor testing operations, Journal of Electronics Manufacturing 2(1992)119-134.
-
(1992)
Journal of Electronics Manufacturing
, vol.2
, pp. 119-134
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
15
-
-
0025413493
-
Some heuristics for scheduling jobs on parallel machines with setups
-
K.C. So, Some heuristics for scheduling jobs on parallel machines with setups, Management Science 36(1990)467-475.
-
(1990)
Management Science
, vol.36
, pp. 467-475
-
-
So, K.C.1
-
16
-
-
0025699778
-
Scheduling batches on parallel machines with major and minor setups
-
C.S. Tang, Scheduling batches on parallel machines with major and minor setups, European Journal of Operations Research 46(1990)28-37.
-
(1990)
European Journal of Operations Research
, vol.46
, pp. 28-37
-
-
Tang, C.S.1
-
19
-
-
84987039881
-
Sequencing and batching for two classes of jobs with deadlines and setup times
-
D.L. Woodruff and M.L. Spearman, Sequencing and batching for two classes of jobs with deadlines and setup times, Production and Operations Management 1(1992)87-102.
-
(1992)
Production and Operations Management
, vol.1
, pp. 87-102
-
-
Woodruff, D.L.1
Spearman, M.L.2
|