|
Volumn , Issue , 1986, Pages 127-142
|
OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING BY LAGRANGIAN PARAMETERIZATION.
a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
BLOCK SEQUENCING;
GRADE;
LAGRANGIAN PARAMETRIZATION;
MINE PLANNING;
OPEN PIT;
PRODUCTION SCHEDULING;
LAGRANGIAN PARAMETERIZATION;
OPTIMUM OPEN PIT MINE;
MINES AND MINING;
MATHEMATICAL TECHNIQUES - ALGORITHMS;
PRODUCTION CONTROL - MATHEMATICAL MODELS;
SCHEDULING;
|
EID: 0022890680
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (113)
|
References (19)
|