메뉴 건너뛰기




Volumn 106, Issue 2, 2006, Pages 105-114

A chance-constrained programming approach for open pit long-term production scheduling in stochastic environments

Author keywords

[No Author keywords available]

Indexed keywords

BLOCK GRADE UNCERTAINTY; GEOSTATISTICAL SIMULATION; RISK-BASED MODEL; STOCHASTIC ENVIRONMENT;

EID: 33645821456     PISSN: 22256253     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (25)

References (26)
  • 1
    • 0000009392 scopus 로고
    • Risk analysis for mine scheduling by conditional simulation
    • (Sec.A: Min. Industry), May-August 1992. The Institution of Mining and Metallurgy
    • ROVENSCROFT, P.J. Risk analysis for mine scheduling by conditional simulation. Trans. Instn Min. Metall. (Sec.A: Min. Industry),101, May-August 1992. The Institution of Mining and Metallurgy. 1992. pp. A82-A88.
    • (1992) Trans. Instn Min. Metall. , vol.101
    • Rovenscroft, P.J.1
  • 2
    • 0028555571 scopus 로고
    • Risk assessment in reserve estimation and open pit planning
    • (Sec.A: Min. Industry), September-November1994. The Institution of Mining and Metallurgy
    • DOWD, P.A. Risk assessment in reserve estimation and open pit planning. Trans. Instn Min. Metall. (Sec.A: Min. Industry),103, September-November1994. The Institution of Mining and Metallurgy. 1994. pp. A148-A154.
    • (1994) Trans. Instn Min. Metall. , vol.103
    • Dowd, P.A.1
  • 3
    • 0028888123 scopus 로고
    • Inclusion of risk assessment in open pit design and scheduling
    • (Sec.A: Min. Industry), January - April 1995. The Institution of Mining and Metallurgy
    • DENBY, B. and SCHOFIELD, D. Inclusion of risk assessment in open pit design and scheduling. Trans. Instn Min. Metall. (Sec.A: Min. Industry),104, January - April 1995. The Institution of Mining and Metallurgy. 1995. pp A67-A71.
    • (1995) Trans. Instn Min. Metall. , vol.104
    • Denby, B.1    Schofield, D.2
  • 4
    • 33645804282 scopus 로고    scopus 로고
    • Managing risk and waste mining in long-term production scheduling of open pit mine
    • Feb. 24-26, Cincinnati Ohio. PREPRINT: 03-151
    • DIMITRAKOPOULOS, R. and RAMAZAN, S. Managing risk and waste mining in long-term production scheduling of open pit mine, 2003 SME Annual meeting & exhibit, Feb. 24-26, Cincinnati Ohio. PREPRINT: 03-151. 2003.
    • (2003) 2003 SME Annual Meeting & Exhibit
    • Dimitrakopoulos, R.1    Ramazan, S.2
  • 5
    • 39649100537 scopus 로고    scopus 로고
    • Managing risk and waste mining in long-term production scheduling of open pit mine
    • Feb. 24-26, Cincinnati Ohio
    • GODOY, M. and DIMITRAKOPOULOS, R. Managing risk and waste mining in long-term production scheduling of open pit mine, 2003 SME Annual meeting and exhibit, Feb. 24-26, Cincinnati Ohio. 2003.
    • (2003) 2003 SME Annual Meeting and Exhibit
    • Godoy, M.1    Dimitrakopoulos, R.2
  • 6
    • 4544233521 scopus 로고    scopus 로고
    • Traditional and new MIP models for production scheduling with in situ grade variabulity
    • Reclamation and Environment
    • RAMAZAN, S. and DIMITRAKOPOULOS, R. Traditional and new MIP models for production scheduling with in situ grade variabulity, International Journal of Surface Mining, Reclamation and Environment, vol. 18, no. 2, 2003. pp.85-98.
    • (2003) International Journal of Surface Mining , vol.18 , Issue.2 , pp. 85-98
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 7
    • 0032434061 scopus 로고    scopus 로고
    • Conditional simulation algorithms for modeling orebody uncertainty in open pit optimization
    • 1998
    • DIMITRAKOPOULOS, R. 1998, Conditional Simulation Algorithms for Modeling Orebody Uncertainty in Open Pit Optimization, International Journal of Surface Mining, Reclamation and Environment, vol. 12, 1998, pp. 173-179.
    • (1998) International Journal of Surface Mining, Reclamation and Environment , vol.12 , pp. 173-179
    • Dimitrakopoulos, R.1
  • 8
    • 0034021292 scopus 로고    scopus 로고
    • Mineral resource+ engineering, economic and legal feasibility=Ore reserve
    • VALLEE, M. Mineral Resource+ engineering, economic and legal feasibility=Ore reserve, CIM Bulletin, vol. 90, 2000. pp. 53-61.
    • (2000) CIM Bulletin , vol.90 , pp. 53-61
    • Vallee, M.1
  • 12
    • 0026359663 scopus 로고
    • A review of recent developments in geostatstics
    • DOWD, P.A. A review of recent developments in geostatstics. Computers and Geostatistics, vol. 17, 1992. pp. 1481-500.
    • (1992) Computers and Geostatistics , vol.17 , pp. 1481-1500
    • Dowd, P.A.1
  • 13
    • 0002931897 scopus 로고    scopus 로고
    • Risk in minerals projects: Analysis, perception and management
    • (Sec.A: Min. Industry), January - April 1997. The Institution of Mining and Metallurgy
    • DOWD, P.A. Risk in minerals projects: analysis, perception and management. Trans. Instn Min. Metall. (Sec.A: Min. Industry),106, January - April 1997. The Institution of Mining and Metallurgy. 1997. pp. A9-A18.
    • (1997) Trans. Instn Min. Metall. , vol.106
    • Dowd, P.A.1
  • 14
    • 0001886845 scopus 로고
    • Optimum design of open-pit mines
    • LERCHS, H. and GROSSMAN, F. Optimum design of open-pit mines. Transaction CIM, vol. 58, no. 633, 1965. pp. 47-54.
    • (1965) Transaction CIM , vol.58 , Issue.633 , pp. 47-54
    • Lerchs, H.1    Grossman, F.2
  • 18
    • 1842610723 scopus 로고    scopus 로고
    • Production scheduling optimization in a Nickel Laterite deposit: MIP and LP application and infeasibility in the presence of orebody uncertainty
    • 23-25 April 2003, Kalgoorelie
    • RAMAZAN, S. and DIMITRAKOPOULOS, R. Production scheduling optimization in a Nickel Laterite deposit: MIP and LP application and infeasibility in the presence of orebody uncertainty. International Symposium on Mine Planning and Equipment Selection, 23-25 April 2003, Kalgoorelie, 2003. 5 pp.
    • (2003) International Symposium on Mine Planning and Equipment Selection
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 19
    • 4544356641 scopus 로고    scopus 로고
    • Recent applications of operations research in open pit mining
    • Feb. 24-26, Cincinnati Ohio
    • RAMAZAN, S. and DIMITRAKOPOULOS, R. Recent applications of operations research in open pit mining, 2003 SME Annual meeting & exhibit, Feb. 24-26, Cincinnati Ohio. 2003.
    • (2003) 2003 SME Annual Meeting & Exhibit
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 20
    • 0020302068 scopus 로고
    • Using geostatistical ore block variance in production planning by integer programming
    • GANGWAR A. Using geostatistical ore block variance in production planning by integer programming. 17th APCOM symposium, 1982. pp. 443-460.
    • (1982) 17th APCOM Symposium , pp. 443-460
    • Gangwar, A.1
  • 22
    • 0000512134 scopus 로고
    • Cost horizons and uncertainty equivalents: An approach to stochastic programming of heating oil
    • April
    • CHARNES, A., COOPER, W.W., and SYMONDS, G.H. Cost horizons and uncertainty equivalents: An approach to stochastic programming of heating oil. Management Science, vol. 4, no. 3 April, 1958. pp. 235-263.
    • (1958) Management Science , vol.4 , Issue.3 , pp. 235-263
    • Charnes, A.1    Cooper, W.W.2    Symonds, G.H.3
  • 23
    • 0002395681 scopus 로고
    • Chance-constrained programming
    • CHARNES, A. and COOPER, W.W. Chance-constrained programming. Management Science, vol. 6, 1959. pp. 73-79.
    • (1959) Management Science , vol.6 , pp. 73-79
    • Charnes, A.1    Cooper, W.W.2
  • 24
    • 0002431201 scopus 로고
    • Deterministic equivalents for optimizing and satisficing under chance-constraints
    • CHARNES, A. and COPER, W.W. Deterministic equivalents for optimizing and satisficing under chance-constraints. Operation Research, vol. 11, 1963. pp. 18-39.
    • (1963) Operation Research , vol.11 , pp. 18-39
    • Charnes, A.1    Coper, W.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.