Volumn 97, Issue 1, 2005, Pages 52-65

The common cycle economic lot scheduling in flexible job shops: The finite horizon case

Author keywords

Common cycle approach; Finite horizon; Flexible job shop; Lot scheduling

Indexed keywords

COMPUTATIONAL COMPLEXITY; INDUSTRIAL ECONOMICS; INDUSTRIAL MANAGEMENT; INTEGER PROGRAMMING; JOB ANALYSIS; LIFE CYCLE; MATHEMATICAL MODELS; NONLINEAR PROGRAMMING; PRODUCT DEVELOPMENT;

EID: 19944366600     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2004.05.005     Document Type: Article
Times cited : (62)

References (21)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • J. Adams, E. Balas, and D. Zawack The shifting bottleneck procedure for job shop scheduling Management Science 34 1988 391 401
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • K.R. Baker Sequencing rules and due-date assignments in a job shop Management Science 30 9 1984 1093 1104
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 3
    • 0345201690 scopus 로고    scopus 로고
    • Single-stage resource allocation and economic lot scheduling on multiple, nonidentical production lines
    • R. Bollapragada, and U. Rao Single-stage resource allocation and economic lot scheduling on multiple, nonidentical production lines Management Science 45 6 1999 889 904
    • (1999) Management Science , vol.45 , Issue.6 , pp. 889-904
    • Bollapragada, R.1    Rao, U.2
  • 4
    • 0025400698 scopus 로고
    • Economic lot scheduling for multiple products on parallel identical processors
    • J.J. Carreno Economic lot scheduling for multiple products on parallel identical processors Management Science 36 3 1990 348 358
    • (1990) Management Science , vol.36 , Issue.3 , pp. 348-358
    • Carreno, J.J.1
  • 5
    • 0028769398 scopus 로고
    • Cyclic scheduling to minimize inventory in a batch flow line
    • G. Dobson, and C.A. Yano Cyclic scheduling to minimize inventory in a batch flow line European Journal of Operational Research 75 1994 441 461
    • (1994) European Journal of Operational Research , vol.75 , pp. 441-461
    • Dobson, G.1    Yano, C.A.2
  • 6
    • 0001740656 scopus 로고
    • Common cycle lot-size scheduling for multi-product, multi-stage production
    • M. El-Najdawi, and P.R. Kleindorfer Common cycle lot-size scheduling for multi-product, multi-stage production Management Science 39 1993 872 885
    • (1993) Management Science , vol.39 , pp. 872-885
    • El-Najdawi, M.1    Kleindorfer, P.R.2
  • 7
    • 19944405138 scopus 로고    scopus 로고
    • Extension of common cycle lot-size scheduling for multi-product, multi-stage arborescent flow-shop environment
    • S.M.T. Fatemi Ghomi, and S.A. Torabi Extension of common cycle lot-size scheduling for multi-product, multi-stage arborescent flow-shop environment Iranian Journal of Science & Technology, Transaction B 26 B1 2002 55 68
    • (2002) Iranian Journal of Science & Technology, Transaction B , vol.26 , Issue.1 , pp. 55-68
    • Fatemi Ghomi, S.M.T.1    Torabi, S.A.2
  • 9
    • 4344651100 scopus 로고    scopus 로고
    • Note on an economic lot scheduling problem under budgetary and capacity constraints
    • B.C. Giri, and I. Moon Note on an economic lot scheduling problem under budgetary and capacity constraints International Journal of Production Economics 91 3 2004 229 234
    • (2004) International Journal of Production Economics , vol.91 , Issue.3 , pp. 229-234
    • Giri, B.C.1    Moon, I.2
  • 11
    • 0020587837 scopus 로고
    • On the general feasibility test of scheduling lot sizes for several products on one machine
    • W. Hsu On the general feasibility test of scheduling lot sizes for several products on one machine Management Science 29 1 1983 93 105
    • (1983) Management Science , vol.29 , Issue.1 , pp. 93-105
    • Hsu, W.1
  • 12
    • 0024619851 scopus 로고
    • When is the economic lot scheduling problem easy?
    • P.C. Jones, and R.R. Inman When is the economic lot scheduling problem easy? IIE Transactions 21 1 1989 11 20
    • (1989) IIE Transactions , vol.21 , Issue.1 , pp. 11-20
    • Jones, P.C.1    Inman, R.R.2
  • 14
    • 0035546154 scopus 로고    scopus 로고
    • The finite horizon economic lot sizing problem in job shops: The multiple cycle approach
    • J. Ouenniche, and J.W.M. Bertrand The finite horizon economic lot sizing problem in job shops The multiple cycle approach International Journal of Production Economics 74 2001 49 61
    • (2001) International Journal of Production Economics , vol.74 , pp. 49-61
    • Ouenniche, J.1    Bertrand, J.W.M.2
  • 15
    • 0032050798 scopus 로고    scopus 로고
    • Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach
    • J. Ouenniche, and F.F. Boctor Sequencing, lot sizing and scheduling of several products in job shops The common cycle approach International Journal of Production Research 36 4 1998 1125 1140
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 1125-1140
    • Ouenniche, J.1    Boctor, F.F.2
  • 16
    • 0032651376 scopus 로고    scopus 로고
    • The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops
    • J. Ouenniche, and F.F. Boctor The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops International Journal of Production Research 37 10 1999 2253 2270
    • (1999) International Journal of Production Research , vol.37 , Issue.10 , pp. 2253-2270
    • Ouenniche, J.1    Boctor, F.F.2
  • 17
    • 0035283825 scopus 로고    scopus 로고
    • The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops
    • J. Ouenniche, and F.F. Boctor The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops European Journal of Operational Research 129 2001 539 554
    • (2001) European Journal of Operational Research , vol.129 , pp. 539-554
    • Ouenniche, J.1    Boctor, F.F.2
  • 18
    • 0037431666 scopus 로고    scopus 로고
    • Economic lot scheduling on multiple production lines with resource constraints
    • R. Pesenti, and W. Ukovich Economic lot scheduling on multiple production lines with resource constraints International Journal of Production Economics 81-82 2003 469 481
    • (2003) International Journal of Production Economics , vol.81-82 , pp. 469-481
    • Pesenti, R.1    Ukovich, W.2
  • 20
    • 0023168047 scopus 로고
    • Common cycle scheduling: A useful application
    • N. Ware, and B. Keown Common cycle scheduling A useful application Production and Inventory Management 28 1 1987 16 22
    • (1987) Production and Inventory Management , vol.28 , Issue.1 , pp. 16-22
    • Ware, N.1    Keown, B.2
  • 21
    • 0002144959 scopus 로고
    • Computing optimal lot sizes in the economic lot scheduling problem
    • P. Zipkin Computing optimal lot sizes in the economic lot scheduling problem Operations Research 39 1 1991 56 63
    • (1991) Operations Research , vol.39 , Issue.1 , pp. 56-63
    • Zipkin, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.