-
1
-
-
0033078202
-
Heuristics for scheduling in a flow shop with multiple processors
-
Brah S., and Loo L.L. Heuristics for scheduling in a flow shop with multiple processors. European Journal of Operational Research 113 (1999) 113-122
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 113-122
-
-
Brah, S.1
Loo, L.L.2
-
2
-
-
0031340781
-
Parallel machine scheduling problems using memetic algorithms
-
Cheng R., and Gen M. Parallel machine scheduling problems using memetic algorithms. Computers and Industrial Engineering 33 3-4 (1997) 761-764
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.3-4
, pp. 761-764
-
-
Cheng, R.1
Gen, M.2
-
5
-
-
38249010317
-
The economic lot and delivery scheduling problem: The single item case
-
Hahm J., and Yano C.A. The economic lot and delivery scheduling problem: The single item case. International Journal of Production Economics 28 2 (1992) 235-252
-
(1992)
International Journal of Production Economics
, vol.28
, Issue.2
, pp. 235-252
-
-
Hahm, J.1
Yano, C.A.2
-
6
-
-
0029288359
-
The economic lot and delivery scheduling problem: The common cycle case
-
Hahm J., and Yano C.A. The economic lot and delivery scheduling problem: The common cycle case. IIE Transactions 27 (1995) 113-125
-
(1995)
IIE Transactions
, vol.27
, pp. 113-125
-
-
Hahm, J.1
Yano, C.A.2
-
7
-
-
0029293670
-
The economic lot and delivery scheduling problem: Models for nested schedules
-
Hahm J., and Yano C.A. The economic lot and delivery scheduling problem: Models for nested schedules. IIE Transactions 27 (1995) 126-139
-
(1995)
IIE Transactions
, vol.27
, pp. 126-139
-
-
Hahm, J.1
Yano, C.A.2
-
9
-
-
0041386432
-
Component scheduling for chip shooter machines: A hybrid genetic algorithm approach
-
Ho W., and Ji P. Component scheduling for chip shooter machines: A hybrid genetic algorithm approach. Computers and Operations Research 30 (2003) 2175-2189
-
(2003)
Computers and Operations Research
, vol.30
, pp. 2175-2189
-
-
Ho, W.1
Ji, P.2
-
11
-
-
0346009089
-
Improved genetic algorithm for the permutation flow shop scheduling problem
-
Iyer S.K., and Saxena B. Improved genetic algorithm for the permutation flow shop scheduling problem. Computers and Operations Research 31 (2004) 593-606
-
(2004)
Computers and Operations Research
, vol.31
, pp. 593-606
-
-
Iyer, S.K.1
Saxena, B.2
-
12
-
-
1442283224
-
An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem
-
Jensen M.T., and Khouja M. An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem. European Journal of Operational Research 156 2 (2004) 305-311
-
(2004)
European Journal of Operational Research
, vol.156
, Issue.2
, pp. 305-311
-
-
Jensen, M.T.1
Khouja, M.2
-
13
-
-
1842455787
-
The economic lot and delivery scheduling problem: Common cycle, rework, and variable production rate
-
Khouja M. The economic lot and delivery scheduling problem: Common cycle, rework, and variable production rate. IIE Transactions 32 (2000) 715-725
-
(2000)
IIE Transactions
, vol.32
, pp. 715-725
-
-
Khouja, M.1
-
14
-
-
0034230637
-
A hybrid genetic algorithm for the open shop scheduling problem
-
Liaw C.F. A hybrid genetic algorithm for the open shop scheduling problem. European Journal of Operational Research 124 (2000) 28-42
-
(2000)
European Journal of Operational Research
, vol.124
, pp. 28-42
-
-
Liaw, C.F.1
-
15
-
-
0036542167
-
A hybrid genetic algorithm for the batch sequencing problem on identical parallel machines
-
Luu D.T., Bohez E.L.J., and Techanitisawad A. A hybrid genetic algorithm for the batch sequencing problem on identical parallel machines. Production Planning and Control 13 3 (2002) 243-252
-
(2002)
Production Planning and Control
, vol.13
, Issue.3
, pp. 243-252
-
-
Luu, D.T.1
Bohez, E.L.J.2
Techanitisawad, A.3
-
17
-
-
0032050798
-
Sequencing, lot sizing and scheduling of several components in job shops: The common cycle approach
-
Ouenniche J., and Boctor F.F. Sequencing, lot sizing and scheduling of several components in job shops: The common cycle approach. International Journal of Production Research 36 4 (1998) 1125-1140
-
(1998)
International Journal of Production Research
, vol.36
, Issue.4
, pp. 1125-1140
-
-
Ouenniche, J.1
Boctor, F.F.2
-
18
-
-
0032651376
-
The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops
-
Ouenniche J., Boctor F.F., and Martel A. The impact of sequencing decisions on multi-item lot sizing and scheduling in flow shops. International Journal of Production Research 37 10 (1999) 2253-2270
-
(1999)
International Journal of Production Research
, vol.37
, Issue.10
, pp. 2253-2270
-
-
Ouenniche, J.1
Boctor, F.F.2
Martel, A.3
-
19
-
-
0035546154
-
The finite horizon economic lot scheduling problem in job shops: The multiple cycle approach
-
Ouenniche J., and Bertrand J.W.M. The finite horizon economic lot scheduling problem in job shops: The multiple cycle approach. International Journal of Production Economics 74 (2001) 49-61
-
(2001)
International Journal of Production Economics
, vol.74
, pp. 49-61
-
-
Ouenniche, J.1
Bertrand, J.W.M.2
-
20
-
-
0028368259
-
Genetic algorithm crossover operators for ordering application
-
Poon P.W., and Carter J.N. Genetic algorithm crossover operators for ordering application. Computers and Operations Research 22 1 (1995) 135-147
-
(1995)
Computers and Operations Research
, vol.22
, Issue.1
, pp. 135-147
-
-
Poon, P.W.1
Carter, J.N.2
-
21
-
-
0030243899
-
An evaluation of sequencing heuristics in flow shop with multiple processors
-
Santos D.L., Hunsucker J.L., and Deal D.E. An evaluation of sequencing heuristics in flow shop with multiple processors. Computers and Industrial Engineering 30 4 (1996) 681-692
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 681-692
-
-
Santos, D.L.1
Hunsucker, J.L.2
Deal, D.E.3
-
22
-
-
0025700701
-
Some efficient heuristic methods for the flow shop sequencing problem
-
Taillard E. Some efficient heuristic methods for the flow shop sequencing problem. European Journal of Operational Research 47 (1990) 65-79
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 65-79
-
-
Taillard, E.1
-
23
-
-
33646076803
-
-
S.A. Torabi, B. Karimi, S.M.T. Fatemi Ghomi, The common cycle economic lot scheduling in flexible job shops: The finite horizon case, International Journal of Production Economics, in press.
-
-
-
-
26
-
-
0043234613
-
Modeling and analysis for multi-period, multi-product and multi-resource production scheduling
-
Wang H.F., and Wu K.Y. Modeling and analysis for multi-period, multi-product and multi-resource production scheduling. Journal of Intelligent Manufacturing 14 (2003) 297-309
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, pp. 297-309
-
-
Wang, H.F.1
Wu, K.Y.2
-
27
-
-
3242691440
-
Hybrid genetic algorithm for optimization problems with permutation property
-
Wang H.F., and Wu K.Y. Hybrid genetic algorithm for optimization problems with permutation property. Computers and Operations Research 31 14 (2004) 2453-2471
-
(2004)
Computers and Operations Research
, vol.31
, Issue.14
, pp. 2453-2471
-
-
Wang, H.F.1
Wu, K.Y.2
-
28
-
-
1642518689
-
A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities
-
Wardono B., and Fathi Y. A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities. European Journal of Operational Research 155 2 (2004) 380-401
-
(2004)
European Journal of Operational Research
, vol.155
, Issue.2
, pp. 380-401
-
-
Wardono, B.1
Fathi, Y.2
|