메뉴 건너뛰기




Volumn 221, Issue 12, 2007, Pages 1763-1770

A study of in-process waiting time on a linear walking worker assembly line

Author keywords

Flexible assembly lines; Lean manufacturing; Manual assembly; Modelling and simulation; Queuing; Walking workers

Indexed keywords

COMPUTER SIMULATION; CONSTRAINED OPTIMIZATION; PRODUCTION ENGINEERING; QUEUEING NETWORKS; SPREADSHEETS; THROUGHPUT;

EID: 38149120838     PISSN: 09544054     EISSN: None     Source Type: Journal    
DOI: 10.1243/09544054JEM769     Document Type: Article
Times cited : (17)

References (26)
  • 1
    • 38149051969 scopus 로고    scopus 로고
    • Application human involvement in assembly and disassembly (keynote paper)
    • Bley, H., Reninhart, G., Seliger, G., Bernardi, M., and Korne, T. Application human involvement in assembly and disassembly (keynote paper). Ann. CIRP, 2004, 53(2), 1-23.
    • (2004) Ann. CIRP , vol.53 , Issue.2 , pp. 1-23
    • Bley, H.1    Reninhart, G.2    Seliger, G.3    Bernardi, M.4    Korne, T.5
  • 2
    • 1242309349 scopus 로고    scopus 로고
    • Benefits of skill chaining in serial production lines with crosstrained workers
    • Hopp, W. J., Tekin, E., and Van-Oyen, M. P. Benefits of skill chaining in serial production lines with crosstrained workers. Mgmt Sci., 2004, 50(1), 83-98.
    • (2004) Mgmt Sci , vol.50 , Issue.1 , pp. 83-98
    • Hopp, W.J.1    Tekin, E.2    Van-Oyen, M.P.3
  • 3
    • 4444342794 scopus 로고    scopus 로고
    • Agile workforce evaluation: A framework for cross-training and coordination
    • Hopp, W. J. and Van-Oyen, M. P. Agile workforce evaluation: a framework for cross-training and coordination. IIE Trans., 2004, 36(10), 919-940.
    • (2004) IIE Trans , vol.36 , Issue.10 , pp. 919-940
    • Hopp, W.J.1    Van-Oyen, M.P.2
  • 4
    • 30744437414 scopus 로고    scopus 로고
    • Bailé, F. and Balle, M. Feel the force of flexible manpower. IEE Manuf. Eng, 2005, 84(6), 20-25.
    • Bailé, F. and Balle, M. Feel the force of flexible manpower. IEE Manuf. Eng, 2005, 84(6), 20-25.
  • 5
    • 0026838021 scopus 로고
    • Assembly line with flexible work-force
    • Downey, B. S. and Leonard, M. S. Assembly line with flexible work-force. Int. J. Prod. Res., 1992, 30(3), 469-483.
    • (1992) Int. J. Prod. Res , vol.30 , Issue.3 , pp. 469-483
    • Downey, B.S.1    Leonard, M.S.2
  • 7
    • 27744526746 scopus 로고    scopus 로고
    • Wang, Q., Owen, G. W., and Milenam, A. R. Comparison between fixed- and walking-worker assembly lines. Proc. IMechE, Part B: J. Engineering Manufacture, 2005, 219(B11), 845-848.
    • Wang, Q., Owen, G. W., and Milenam, A. R. Comparison between fixed- and walking-worker assembly lines. Proc. IMechE, Part B: J. Engineering Manufacture, 2005, 219(B11), 845-848.
  • 8
    • 0031127233 scopus 로고    scopus 로고
    • Data collection and analysis of manual work using video recording and personal computer techniques
    • Engstrom, T. and Medbo, P. Data collection and analysis of manual work using video recording and personal computer techniques. Int. J. Ind. Ergonomics, 1997, 19(4) 291-298.
    • (1997) Int. J. Ind. Ergonomics , vol.19 , Issue.4 , pp. 291-298
    • Engstrom, T.1    Medbo, P.2
  • 10
    • 0027641386 scopus 로고
    • The role of queuing network models in performance evaluation of manufacturing systems
    • Jackman, J. and Johnson, E. The role of queuing network models in performance evaluation of manufacturing systems. J. Oper. Res. Soc., 1993, 44(8), 797-807.
    • (1993) J. Oper. Res. Soc , vol.44 , Issue.8 , pp. 797-807
    • Jackman, J.1    Johnson, E.2
  • 12
    • 0030570340 scopus 로고    scopus 로고
    • Queuing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos, H. T. and Heavey, C. Queuing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines. Eur. J. Oper. Res., 1996, 92(1), 1-27.
    • (1996) Eur. J. Oper. Res , vol.92 , Issue.1 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 13
    • 0042279736 scopus 로고    scopus 로고
    • Queuing theory in manufacturing: A survey
    • Govil, M. K. and Fu, M. C. Queuing theory in manufacturing: a survey J. Manuf Syst., 18(3), 1999, 214-240.
    • (1999) J. Manuf Syst , vol.18 , Issue.3 , pp. 214-240
    • Govil, M.K.1    Fu, M.C.2
  • 14
    • 33745728226 scopus 로고    scopus 로고
    • A queuing model for a two-stage stochastic manufacturing system with overlapping operations
    • Nieuwenhuyse, I. V. and Vandaele, N. A queuing model for a two-stage stochastic manufacturing system with overlapping operations. Int. J. Flexibile Mfg Systems, 2005, 17(3), 175-199.
    • (2005) Int. J. Flexibile Mfg Systems , vol.17 , Issue.3 , pp. 175-199
    • Nieuwenhuyse, I.V.1    Vandaele, N.2
  • 15
    • 0001207094 scopus 로고    scopus 로고
    • Analysis and optimisation of a U-shaped production line
    • Ohno, K. and Nakade, K. Analysis and optimisation of a U-shaped production line. J. Oper. Res. Soc. Jpn, 1997, 40(1), 90-104.
    • (1997) J. Oper. Res. Soc. Jpn , vol.40 , Issue.1 , pp. 90-104
    • Ohno, K.1    Nakade, K.2
  • 16
    • 0027188221 scopus 로고    scopus 로고
    • Simulation of an apparel assembly cell with walking workers and decouplers
    • Black, J. T. and Schroer, B. J. Simulation of an apparel assembly cell with walking workers and decouplers. J. Manuf Syst., 1997, 12(2), 170-180.
    • (1997) J. Manuf Syst , vol.12 , Issue.2 , pp. 170-180
    • Black, J.T.1    Schroer, B.J.2
  • 17
    • 0030247852 scopus 로고    scopus 로고
    • Performance of a manufacturing module with moving workers
    • Bischak, D. P. Performance of a manufacturing module with moving workers. HE Trans., 1996, 28(9), 723-733.
    • (1996) HE Trans , vol.28 , Issue.9 , pp. 723-733
    • Bischak, D.P.1
  • 18
    • 18844393385 scopus 로고    scopus 로고
    • Key issues and developments in modelling and simulation-based methodologies for manufacturing systems analysis, design and performance evaluation
    • Wang, Q. and Chatwin, C. R. Key issues and developments in modelling and simulation-based methodologies for manufacturing systems analysis, design and performance evaluation. Int. J. Adv. Manuf. Technol, 2005, 25(11-12), 1254-1265.
    • (2005) Int. J. Adv. Manuf. Technol , vol.25 , Issue.11-12 , pp. 1254-1265
    • Wang, Q.1    Chatwin, C.R.2
  • 19
    • 0031379431 scopus 로고    scopus 로고
    • Stochastic analysis of a U-shaped production line with multiple workers
    • Nakade, K. and Ohno, K. Stochastic analysis of a U-shaped production line with multiple workers. Comput. Ind. Engng, 1997, 33(3-4), 809-812.
    • (1997) Comput. Ind. Engng , vol.33 , Issue.3-4 , pp. 809-812
    • Nakade, K.1    Ohno, K.2
  • 20
    • 0032624742 scopus 로고    scopus 로고
    • An optimal worker allocation problem for a U-shaped production line
    • Nakada, K. and Ohno, K. An optimal worker allocation problem for a U-shaped production line. Int. J. Prod. Econ., 1999, 60(1), 353-358.
    • (1999) Int. J. Prod. Econ , vol.60 , Issue.1 , pp. 353-358
    • Nakada, K.1    Ohno, K.2
  • 21
    • 0037332862 scopus 로고    scopus 로고
    • Separate and carousel type allocations of workers in a U-shaped production line
    • Nakade, K. and Ohno, K. Separate and carousel type allocations of workers in a U-shaped production line. Euro. J. Oper. Res., 2003, 145(2), 403-124.
    • (2003) Euro. J. Oper. Res , vol.145 , Issue.2 , pp. 403-124
    • Nakade, K.1    Ohno, K.2
  • 22
    • 0002622989 scopus 로고    scopus 로고
    • A production line that balances itself
    • Bartholdi III, J. J. and Eisenstein, D. D. A production line that balances itself. Oper. Res., 1996, 44(1), 21-34.
    • (1996) Oper. Res , vol.44 , Issue.1 , pp. 21-34
    • Bartholdi III, J.J.1    Eisenstein, D.D.2
  • 23
    • 0032631927 scopus 로고    scopus 로고
    • Dynamics of two- and three-worker 'bucket brigade' production lines
    • Bartholdi III, J. J., Leonid, D., and Eisenstein, D. D. Dynamics of two- and three-worker 'bucket brigade' production lines. Oper. Res., 1999, 47(3), 488-491.
    • (1999) Oper. Res , vol.47 , Issue.3 , pp. 488-491
    • Bartholdi III, J.J.1    Leonid, D.2    Eisenstein, D.D.3
  • 24
    • 0000906215 scopus 로고    scopus 로고
    • Selfbuffering, self-balancing, self-flushing production lines
    • Zavadlav, E., McClain, J. O., and Thomas, L. J. Selfbuffering, self-balancing, self-flushing production lines. Mgmt Sci, 1996, 42(8), 1151-1164.
    • (1996) Mgmt Sci , vol.42 , Issue.8 , pp. 1151-1164
    • Zavadlav, E.1    McClain, J.O.2    Thomas, L.J.3
  • 26
    • 33751514376 scopus 로고    scopus 로고
    • Determining numbers of workstations and operators for a linear walking-worker assembly line
    • Wang, Q., Owen, G. W., and Mileham, A. R. Determining numbers of workstations and operators for a linear walking-worker assembly line. Int. J. Comput. Integra. Manuf, 2007, 20(1), 1-10.
    • (2007) Int. J. Comput. Integra. Manuf , vol.20 , Issue.1 , pp. 1-10
    • Wang, Q.1    Owen, G.W.2    Mileham, A.R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.