메뉴 건너뛰기




Volumn 20, Issue 1, 2007, Pages 1-10

Determining numbers of workstations and operators for a linear walking-worker assembly line

Author keywords

Assembly lines; Flexible assembly; Modelling; Simulation; Walking workers

Indexed keywords

COMPUTER SIMULATION; COMPUTER WORKSTATIONS; ENTERPRISE RESOURCE PLANNING; LINEAR SYSTEMS; PROFESSIONAL ASPECTS;

EID: 33751514376     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920600667358     Document Type: Article
Times cited : (32)

References (17)
  • 1
    • 84962957262 scopus 로고
    • Developing multi-function workers
    • Anon, Developing multi-function workers. Wire J. Int., 1985, 18 (1), 20.
    • (1985) Wire J. Int. , vol.18 , Issue.1 , pp. 20
  • 2
    • 0032631927 scopus 로고    scopus 로고
    • Dynamics of two- and three-worker 'bucket brigade' production lines
    • Bartholdi III, J J., Leonid, D. and Eisenstein, D.D., Dynamics of two- and three-worker 'bucket brigade' production lines Ops Res., 1999, 47, 488-491.
    • (1999) Ops Res. , vol.47 , pp. 488-491
    • Bartholdi III, J.J.1    Leonid, D.2    Eisenstein, D.D.3
  • 3
    • 0035460936 scopus 로고    scopus 로고
    • Performance of bucket brigades when work is stochastic
    • Bartholdi III, J.J., Eisenstein, D.D. and Foley, R.D., Performance of bucket brigades when work is stochastic. Ops Res., 2001, 49, 710-719.
    • (2001) Ops Res. , vol.49 , pp. 710-719
    • Bartholdi III, J.J.1    Eisenstein, D.D.2    Foley, R.D.3
  • 4
    • 0030247852 scopus 로고    scopus 로고
    • Performance of a manufacturing module with moving workers
    • Bischak, D.P., Performance of a manufacturing module with moving workers. IIE Trans, 1996, 28, 723-733.
    • (1996) IIE Trans , vol.28 , pp. 723-733
    • Bischak, D.P.1
  • 5
    • 0027188221 scopus 로고    scopus 로고
    • Simulation of an apparel assembly cell with walking workers and decouplers
    • Black, J.T. and Schroer, B.J., Simulation of an apparel assembly cell with walking workers and decouplers, J. Mfg Systems, 1997, 12, 170-180.
    • (1997) J. Mfg Systems , vol.12 , pp. 170-180
    • Black, J.T.1    Schroer, B.J.2
  • 6
    • 17444419055 scopus 로고    scopus 로고
    • A survey of the self-balancing production lines ('bucket brigades')
    • Bratcu, A.I. and Dolgui, A., A survey of the self-balancing production lines ('bucket brigades'). J. Intell. Mfg, 2005, 16, 138-158.
    • (2005) J. Intell. Mfg , vol.16 , pp. 138-158
    • Bratcu, A.I.1    Dolgui, A.2
  • 7
    • 0141976792 scopus 로고    scopus 로고
    • Human factor policy testing in the sequencing of manual mixed model assembly lines
    • Celano, G., Costa, A., Fichera, S. and Perrone, G., Human factor policy testing in the sequencing of manual mixed model assembly lines. Comput. Ops Res., 2003, 31, 39-59.
    • (2003) Comput. Ops Res. , vol.31 , pp. 39-59
    • Celano, G.1    Costa, A.2    Fichera, S.3    Perrone, G.4
  • 8
    • 33751517999 scopus 로고    scopus 로고
    • Two effective methods for workforce reduction under lean production principles
    • Portland, Oregon, USA, (Begel House, Inc.: New York)
    • Ghinato, P., Fujii, S. and Morita, H., Two effective methods for workforce reduction under lean production principles. 8th International Flexible Automation and Intelligent Manufacturing Conference, Portland, Oregon, USA, 1998, pp. 703-714 (Begel House, Inc.: New York).
    • (1998) 8th International Flexible Automation and Intelligent Manufacturing Conference , pp. 703-714
    • Ghinato, P.1    Fujii, S.2    Morita, H.3
  • 10
    • 1242309349 scopus 로고    scopus 로고
    • Benefits of skill chaining in serial production lines with cross-trained workers
    • Hopp, J.W., Tekin, E. and Oyen, M.P.V., Benefits of skill chaining in serial production lines with cross-trained workers. Mgmt Sci., 2004, 50, 83-98.
    • (2004) Mgmt Sci. , vol.50 , pp. 83-98
    • Hopp, J.W.1    Tekin, E.2    Oyen, M.P.V.3
  • 12
    • 0031379431 scopus 로고    scopus 로고
    • Stochastic analysis of a U-shaped production line with multiple workers
    • Nakade, K. and Ohno, K., Stochastic analysis of a U-shaped production line with multiple workers. Comput. Ind. Engng, 1997, 33, 809-812.
    • (1997) Comput. Ind. Engng , vol.33 , pp. 809-812
    • Nakade, K.1    Ohno, K.2
  • 13
    • 0032624742 scopus 로고    scopus 로고
    • An optimal worker allocation problem for a U-shaped production line
    • Nakada, K. and Ohno, K., An optimal worker allocation problem for a U-shaped production line. Int. J. Prod. Economics, 1999, 60, 353-358.
    • (1999) Int. J. Prod. Economics , vol.60 , pp. 353-358
    • Nakada, K.1    Ohno, K.2
  • 14
    • 0037332862 scopus 로고    scopus 로고
    • Separate and carousel type allocations of workers in a U-shaped production line
    • Nakade, K. and Ohno, K., Separate and carousel type allocations of workers in a U-shaped production line. Eur. J. Opl Res., 2003, 145, 403-424.
    • (2003) Eur. J. Opl Res. , vol.145 , pp. 403-424
    • Nakade, K.1    Ohno, K.2
  • 15
    • 0142216437 scopus 로고    scopus 로고
    • Comparative dynamic performance of token passing and CSMA/CA LANs for a flexible manufacturing system
    • Wang, Q. and Chatwin, C.R., Comparative dynamic performance of token passing and CSMA/CA LANs for a flexible manufacturing system. Int. J. Comput. Integ. Mfg, 2003, 16, 439-454.
    • (2003) Int. J. Comput. Integ. Mfg , vol.16 , pp. 439-454
    • Wang, Q.1    Chatwin, C.R.2
  • 17
    • 0000906215 scopus 로고    scopus 로고
    • Self-buffering, self-balancing, self-flushing production lines
    • Zavadlav, E., McClain, J.O. and Thomas, L.J., Self-buffering, self-balancing, self-flushing production lines. Mgmt Sci., 1996, 42, 1151-1164.
    • (1996) Mgmt Sci. , vol.42 , pp. 1151-1164
    • Zavadlav, E.1    McClain, J.O.2    Thomas, L.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.