메뉴 건너뛰기




Volumn 38, Issue 7, 2006, Pages 537-546

A logistics scheduling model: Scheduling and transshipment for two processing centers

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COST EFFECTIVENESS; DECISION MAKING; MATHEMATICAL MODELS; TRANSPORTATION;

EID: 33646355472     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/074081791009022     Document Type: Article
Times cited : (18)

References (20)
  • 1
    • 0030289711 scopus 로고    scopus 로고
    • Lot scheduling in a two-machine cell with swapping devices
    • [CSA] 1
    • Agnetis, A. and Pacciarelli, D. and Rossi, F. (1996) Lot scheduling in a two-machine cell with swapping devices IIE Transactions, 28(11), pp. 911-917. [CSA] 1
    • (1996) IIE Transactions , vol.28 , Issue.11 , pp. 911-917
    • Agnetis, A.1    Pacciarelli, D.2    Rossi, F.3
  • 2
    • 0029404820 scopus 로고
    • A time window approach to simultaneous scheduling of machines and material handling system in an FMS
    • [CSA]
    • Bilge, U. and Ulusoy, G. (1995) A time window approach to simultaneous scheduling of machines and material handling system in an FMS Operations Research, 43(6), pp. 1058-1070. [CSA]
    • (1995) Operations Research , vol.43 , Issue.6 , pp. 1058-1070
    • Bilge, U.1    Ulusoy, G.2
  • 3
    • 0016080006 scopus 로고
    • Scheduling independent tasks to reduce mean finishing time
    • [CSA] [CROSSREF]
    • Bruno, J. and Coffman, E., Jr. and Sethi, R. (1974) Scheduling independent tasks to reduce mean finishing time Communications of the ACM, 17, pp. 382-387. [CSA] [CROSSREF]
    • (1974) Communications of the ACM , vol.17 , pp. 382-387
    • Bruno, J.1    Coffman Jr., E.2    Sethi, R.3
  • 4
    • 2642510666 scopus 로고    scopus 로고
    • Machine scheduling with job delivery coordination
    • [CSA] [CROSSREF]
    • Chang, Y. and Lee, C. (2004) Machine scheduling with job delivery coordination European Journal of Operational Research, 158, pp. 470-487. [CSA] [CROSSREF]
    • (2004) European Journal of Operational Research , vol.158 , pp. 470-487
    • Chang, Y.1    Lee, C.2
  • 5
    • 0030216821 scopus 로고    scopus 로고
    • Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
    • [CSA] [CROSSREF]
    • Chen, Z. (1996) Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs European Journal of Operations Research, 93(1), pp. 49 - 60. [CSA] [CROSSREF]
    • (1996) European Journal of Operations Research , vol.93 , Issue.1 , pp. 49-60
    • Chen, Z.1
  • 6
    • 0030263888 scopus 로고    scopus 로고
    • Single machine scheduling with batch deliveries
    • [CSA] [CROSSREF]
    • Cheng, T. and Gordon, V. and Kovalyov, M. (1996) Single machine scheduling with batch deliveries European Journal of Operations Research, 94(2), pp. 277-283. [CSA] [CROSSREF]
    • (1996) European Journal of Operations Research , vol.94 , Issue.2 , pp. 277-283
    • Cheng, T.1    Gordon, V.2    Kovalyov, M.3
  • 7
    • 0035561146 scopus 로고    scopus 로고
    • Single supplier scheduling for multiple deliveries
    • [CSA] [CROSSREF]
    • Cheng, T. and Kovalyov, M. (2001) Single supplier scheduling for multiple deliveries Annals of Operations Research, 107, pp. 51-63. [CSA] [CROSSREF]
    • (2001) Annals of Operations Research , vol.107 , pp. 51-63
    • Cheng, T.1    Kovalyov, M.2
  • 8
    • 0035546138 scopus 로고    scopus 로고
    • Multi-site planning: A transshipment problem
    • [CSA] [CROSSREF]
    • Guinet, A. (2001) Multi-site planning: A transshipment problem International Journal of Production Economics, 74, pp. 21-32. [CSA] [CROSSREF]
    • (2001) International Journal of Production Economics , vol.74 , pp. 21-32
    • Guinet, A.1
  • 9
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • [CSA] [CROSSREF]
    • Hall, N. and Potts, C. (2003) Supply chain scheduling: Batching and delivery Operations Research, 51(4), pp. 566-584. [CSA] [CROSSREF]
    • (2003) Operations Research , vol.51 , Issue.4 , pp. 566-584
    • Hall, N.1    Potts, C.2
  • 10
    • 0035426396 scopus 로고    scopus 로고
    • The dynamic transshipment problem
    • [CSA] [CROSSREF]
    • Herer, Y. and Tzur, M. (2001) The dynamic transshipment problem Naval Research Logistics, 48(5), pp. 386-408. [CSA] [CROSSREF]
    • (2001) Naval Research Logistics , vol.48 , Issue.5 , pp. 386-408
    • Herer, Y.1    Tzur, M.2
  • 11
    • 0038031945 scopus 로고    scopus 로고
    • Optimal and heuristic algorithms for the multi-location dynamic transshipment problem with fixed transshipment costs
    • [CSA] [CROSSREF]
    • Herer, Y. and Tzur, M. (2003) Optimal and heuristic algorithms for the multi-location dynamic transshipment problem with fixed transshipment costs IIE Transactions, 35(5), pp. 419 - 432. [CSA] [CROSSREF]
    • (2003) IIE Transactions , vol.35 , Issue.5 , pp. 419-432
    • Herer, Y.1    Tzur, M.2
  • 12
    • 0027906623 scopus 로고
    • On scheduling to minimize earliness-tardiness and batch delivery costs with a common due-date
    • [CSA] [CROSSREF]
    • Herrmann, J. and Lee, C. (1993) On scheduling to minimize earliness-tardiness and batch delivery costs with a common due-date European Journal of Operations Research, 70(3), pp. 272-288. [CSA] [CROSSREF]
    • (1993) European Journal of Operations Research , vol.70 , Issue.3 , pp. 272-288
    • Herrmann, J.1    Lee, C.2
  • 13
    • 10444261222 scopus 로고    scopus 로고
    • Machine scheduling with deliveries to two customer locations
    • [CSA] [CROSSREF]
    • Li, C. and Vairaktarakis, G. and Lee, C. (2005) Machine scheduling with deliveries to two customer locations European Journal of Operational Research, 164(1), pp. 39-51. [CSA] [CROSSREF]
    • (2005) European Journal of Operational Research , vol.164 , Issue.1 , pp. 39-51
    • Li, C.1    Vairaktarakis, G.2    Lee, C.3
  • 14
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • [CSA] [CROSSREF]
    • Lee, C. and Chen, Z. (2001) Machine scheduling with transportation considerations Journal of Scheduling, 4(1), pp. 3-24. [CSA] [CROSSREF]
    • (2001) Journal of Scheduling , vol.4 , Issue.1 , pp. 3-24
    • Lee, C.1    Chen, Z.2
  • 15
    • 18744400261 scopus 로고    scopus 로고
    • A logistics scheduling model: Inventory cost reduction by batching
    • [CSA] [CROSSREF]
    • Qi, X. (2005) A logistics scheduling model: Inventory cost reduction by batching Naval Research Logistics, 52(4), pp. 312-320. [CSA] [CROSSREF]
    • (2005) Naval Research Logistics , vol.52 , Issue.4 , pp. 312-320
    • Qi, X.1
  • 16
    • 0035706193 scopus 로고    scopus 로고
    • A two-location inventory model with transshipment and local decision making
    • [CSA] [CROSSREF]
    • Rudi, N. and Kapur, S. and Pyke, D. (2001) A two-location inventory model with transshipment and local decision making Management Science, 47(12), pp. 1668-1680. [CSA] [CROSSREF]
    • (2001) Management Science , vol.47 , Issue.12 , pp. 1668-1680
    • Rudi, N.1    Kapur, S.2    Pyke, D.3
  • 17
    • 0030790585 scopus 로고    scopus 로고
    • Scheduling a two-machine flowshop with travel times to minimize maximum lateness International
    • [CSA] [CROSSREF]
    • Stevens, J. and Gemmill, D. (1997) Scheduling a two-machine flowshop with travel times to minimize maximum lateness International Journal of Production Research, 35(1), pp. 1-15. [CSA] [CROSSREF]
    • (1997) Journal of Production Research , vol.35 , Issue.1 , pp. 1-15
    • Stevens, J.1    Gemmill, D.2
  • 18
    • 0043099685 scopus 로고    scopus 로고
    • A heuristic for the two-machine open-shop scheduling problem with transportation times
    • [CSA] [CROSSREF]
    • Strusevich, V. (1999) A heuristic for the two-machine open-shop scheduling problem with transportation times Discrete Applied Mathematics, 93(2/3), pp. 287-304. [CSA] [CROSSREF]
    • (1999) Discrete Applied Mathematics , vol.93 , Issue.2-3 , pp. 287-304
    • Strusevich, V.1
  • 19
    • 0034319401 scopus 로고    scopus 로고
    • Parallel machine scheduling with batch delivery costs
    • [CSA] [CROSSREF]
    • Wang, G. and Cheng, T. (2000) Parallel machine scheduling with batch delivery costs International Journal of Production Economics, 68(2), pp. 177-183. [CSA] [CROSSREF]
    • (2000) International Journal of Production Economics , vol.68 , Issue.2 , pp. 177-183
    • Wang, G.1    Cheng, T.2
  • 20
    • 33646383926 scopus 로고    scopus 로고
    • Capacitated production control with virtual lateral transshipments
    • Newark, NJ: New Jersey Institute of Technology. 67102
    • Yang, J. and Qin, Z.(2003) Capacitated production control with virtual lateral transshipments. Newark, NJ: New Jersey Institute of Technology. 67102
    • (2003)
    • Yang, J.1    Qin, Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.