-
4
-
-
0038909957
-
A non-computer approach to the critical path method for the construction industry
-
The Construction Institute, Stanford University, CA
-
Fondahl J.W. A non-computer approach to the critical path method for the construction industry. Technical Report vol. 9 (1961), The Construction Institute, Stanford University, CA
-
(1961)
Technical Report
, vol.9
-
-
Fondahl, J.W.1
-
5
-
-
0032638332
-
Using machine learning and GA to solve time-cost trade-off problems
-
Li H., Cao J., and Love P. Using machine learning and GA to solve time-cost trade-off problems. Journal of Construction Engineering and Management, ASCE 125 5 (1999) 347-353
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.2
Love, P.3
-
6
-
-
12744266507
-
Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
-
Zheng D., and Ng S. Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, ASCE 131 2 (2004) 176-186
-
(2004)
Journal of Construction Engineering and Management, ASCE
, vol.131
, Issue.2
, pp. 176-186
-
-
Zheng, D.1
Ng, S.2
-
7
-
-
34547763455
-
Man-computer concepts for project management
-
The Construction Institute, Department of Civil Engineering, Stanford University, Stanford, CA.
-
Paulson Jr. B.C. Man-computer concepts for project management. Technical Report vol. 148 (1971), The Construction Institute, Department of Civil Engineering, Stanford University, Stanford, CA.
-
(1971)
Technical Report
, vol.148
-
-
Paulson Jr., B.C.1
-
8
-
-
0022325158
-
Resource allocation with project manager control
-
Ibbs C.W. (Ed), ASCE
-
Crandall K.C. Resource allocation with project manager control. In: Ibbs C.W. (Ed). Construction Research Applied to Practice (1985), ASCE 1-17
-
(1985)
Construction Research Applied to Practice
, pp. 1-17
-
-
Crandall, K.C.1
-
10
-
-
0033156974
-
Fuzzy optimal model for resource-constrained construction scheduling
-
Leu S.S., Chen A., and Yang C. Fuzzy optimal model for resource-constrained construction scheduling. Journal of Construction Engineering and Management, ASCE 13 3 (1999) 207-216
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.13
, Issue.3
, pp. 207-216
-
-
Leu, S.S.1
Chen, A.2
Yang, C.3
-
12
-
-
0000460378
-
Can AI planners solve practical problems?
-
Wilkens D.E. Can AI planners solve practical problems?. Computational Intelligence 6 4 (1990) 232-246
-
(1990)
Computational Intelligence
, vol.6
, Issue.4
, pp. 232-246
-
-
Wilkens, D.E.1
-
13
-
-
0342795149
-
The OPIS framework for modeling manufacturing systems
-
Carnegie Mellon University, The Robotics Institute
-
Smith S.F. The OPIS framework for modeling manufacturing systems. Technical Report, TR-CMU-RI-89-30 (1989), Carnegie Mellon University, The Robotics Institute
-
(1989)
Technical Report, TR-CMU-RI-89-30
-
-
Smith, S.F.1
-
14
-
-
0027700624
-
Iterative repair for scheduling and rescheduling
-
Zweben M., Davis E., and Deale M. Iterative repair for scheduling and rescheduling. IEEE Transactions on Systems, Man and Cybernetics 23 6 (1993) 1588-1596
-
(1993)
IEEE Transactions on Systems, Man and Cybernetics
, vol.23
, Issue.6
, pp. 1588-1596
-
-
Zweben, M.1
Davis, E.2
Deale, M.3
-
15
-
-
0004911487
-
OPTIMUM-AIV: a knowledge based planning and scheduling system for spacecraft AIV
-
Fox M., and Zweben M. (Eds), Morgan Kaufmann, San Mateo, CA
-
Aarup M., Arentoft M.M., Parrod Y., Stader J., and Stokes I. OPTIMUM-AIV: a knowledge based planning and scheduling system for spacecraft AIV. In: Fox M., and Zweben M. (Eds). Knowledge Based Scheduling (1994), Morgan Kaufmann, San Mateo, CA 451-469
-
(1994)
Knowledge Based Scheduling
, pp. 451-469
-
-
Aarup, M.1
Arentoft, M.M.2
Parrod, Y.3
Stader, J.4
Stokes, I.5
-
16
-
-
2442489241
-
The systematic plan adaptor: a formal foundation for case-based planning
-
Dept. of Computer Science and Engineering, University of Washington, Seattle, WA
-
Hanks S., and Weld D.S. The systematic plan adaptor: a formal foundation for case-based planning. Technical Report, 92-09-04 (1992), Dept. of Computer Science and Engineering, University of Washington, Seattle, WA
-
(1992)
Technical Report, 92-09-04
-
-
Hanks, S.1
Weld, D.S.2
-
17
-
-
34547794347
-
Schedule repair through case-based reasoning
-
The Robotics Institute, Carnegie Mellon University
-
Sycara K., and Miyashita K. Schedule repair through case-based reasoning. Technical Report (1993), The Robotics Institute, Carnegie Mellon University
-
(1993)
Technical Report
-
-
Sycara, K.1
Miyashita, K.2
-
18
-
-
34547733673
-
Formalization of construction sequencing rationale and classification mechanism to support rapid generation of sequencing alternatives
-
CIFE, Stanford University, Stanford, CA
-
Koo B., Fischer M., and Kunz J. Formalization of construction sequencing rationale and classification mechanism to support rapid generation of sequencing alternatives. Technical Report vol. 167 (2006), CIFE, Stanford University, Stanford, CA
-
(2006)
Technical Report
, vol.167
-
-
Koo, B.1
Fischer, M.2
Kunz, J.3
-
19
-
-
0026130973
-
Sequence knowledge for construction scheduling
-
Echeverry D., Ibbs W., and Kim S. Sequence knowledge for construction scheduling. Journal of Construction Engineering and Management, ASCE 117 1 (1991) 118-130
-
(1991)
Journal of Construction Engineering and Management, ASCE
, vol.117
, Issue.1
, pp. 118-130
-
-
Echeverry, D.1
Ibbs, W.2
Kim, S.3
-
20
-
-
34547758121
-
-
Kähkönen, K. (1993) Modelling activity dependencies for building construction project scheduling. Technical Research Centre of Finland, VTT Publications, ESPOO.
-
-
-
-
21
-
-
84866245136
-
Model-based sequencing mechanisms used to automate activity sequencing
-
CIFE, Stanford University, Stanford, CA
-
Aalami F., Kunz J., and Fischer M. Model-based sequencing mechanisms used to automate activity sequencing. Working Paper vol. 50 (1998), CIFE, Stanford University, Stanford, CA
-
(1998)
Working Paper
, vol.50
-
-
Aalami, F.1
Kunz, J.2
Fischer, M.3
-
22
-
-
0032645520
-
Parade game: impact of work flow variability on trade performance
-
Tommelein I.D., Riley D., and Howell G.A. Parade game: impact of work flow variability on trade performance. Journal of Construction Engineering and Management, ASCE 125 5 (1999) 304-301
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.5
, pp. 304-301
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
-
23
-
-
13944281016
-
Constraint-based planning with integrated production scheduler over Internet
-
Chua D.K.H., Shen L.J., and Bok S.H. Constraint-based planning with integrated production scheduler over Internet. Journal of Construction Engineering and Management, ASCE 129 3 (2003) 293-310
-
(2003)
Journal of Construction Engineering and Management, ASCE
, vol.129
, Issue.3
, pp. 293-310
-
-
Chua, D.K.H.1
Shen, L.J.2
Bok, S.H.3
-
24
-
-
1642309646
-
A trajectory for validating computational emulation models of organizations
-
Thomsen J., Levitt R., Kunz J., Nass C., and Fridsma D. A trajectory for validating computational emulation models of organizations. Journal of Computational and Mathematical Organization Theory 5 4 (1999) 385-401
-
(1999)
Journal of Computational and Mathematical Organization Theory
, vol.5
, Issue.4
, pp. 385-401
-
-
Thomsen, J.1
Levitt, R.2
Kunz, J.3
Nass, C.4
Fridsma, D.5
-
25
-
-
0041359088
-
The Charrette test method
-
CIFE, Stanford University, Stanford, CA
-
Clayton M., Kunz J., and Fischer M. The Charrette test method. Technical Report vol. 120 (1998), CIFE, Stanford University, Stanford, CA
-
(1998)
Technical Report
, vol.120
-
-
Clayton, M.1
Kunz, J.2
Fischer, M.3
|