메뉴 건너뛰기




Volumn 23, Issue 6, 2007, Pages 614-623

Development of computer-aided maintenance resources planning (CAMRP): A case of multiple CNC machining centers

Author keywords

Maintenance; Resources planning; Theory of constraints

Indexed keywords

COMPUTER AIDED PROCESS PLANNING; COMPUTER CONTROL SYSTEMS; CONSTRAINT THEORY; DECISION SUPPORT SYSTEMS; INNOVATION; MAINTENANCE;

EID: 34547757323     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rcim.2007.02.018     Document Type: Article
Times cited : (35)

References (38)
  • 3
    • 34547800453 scopus 로고    scopus 로고
    • Bond TH. Implementing profit centered maintenance, P/PM Technology, December 1994.
  • 5
    • 2342525394 scopus 로고    scopus 로고
    • The status of maintenance management in UK manufacturing organizations: results from a pilot survey
    • Cholasuke C., Bhardwa R., and Antony J. The status of maintenance management in UK manufacturing organizations: results from a pilot survey. J Qual Maintenance Eng 10 1 (2004) 5-15
    • (2004) J Qual Maintenance Eng , vol.10 , Issue.1 , pp. 5-15
    • Cholasuke, C.1    Bhardwa, R.2    Antony, J.3
  • 6
    • 0031353816 scopus 로고    scopus 로고
    • Building maintenance strategy: a new management approach
    • Horner R.M.W., El-Haram M.A., and Munns A.K. Building maintenance strategy: a new management approach. J Qual Maintenance Eng 3 4 (1997) 273-280
    • (1997) J Qual Maintenance Eng , vol.3 , Issue.4 , pp. 273-280
    • Horner, R.M.W.1    El-Haram, M.A.2    Munns, A.K.3
  • 7
    • 0031679382 scopus 로고    scopus 로고
    • A strategic approach to managing maintenance performance
    • Tsang A.H.C. A strategic approach to managing maintenance performance. J Qual Maintenance Eng 4 2 (1998) 87-94
    • (1998) J Qual Maintenance Eng , vol.4 , Issue.2 , pp. 87-94
    • Tsang, A.H.C.1
  • 8
    • 0034288043 scopus 로고    scopus 로고
    • The analytic hierarchy process applied to maintenance strategy selection
    • Bevilacqua M., and Braglia M. The analytic hierarchy process applied to maintenance strategy selection. Reliab Eng Syst Safe 70 (2000) 71-83
    • (2000) Reliab Eng Syst Safe , vol.70 , pp. 71-83
    • Bevilacqua, M.1    Braglia, M.2
  • 9
    • 0141988590 scopus 로고    scopus 로고
    • Plant maintenance strategy: evidence from four british manufacturing firms
    • Cooke F.L. Plant maintenance strategy: evidence from four british manufacturing firms. J Qual Maintenance Eng 9 3 (2003) 239-249
    • (2003) J Qual Maintenance Eng , vol.9 , Issue.3 , pp. 239-249
    • Cooke, F.L.1
  • 13
    • 0030109054 scopus 로고    scopus 로고
    • Automated tactical maintenance planning based on machine monitoring
    • Knapp G.M., and Wang H.-P.(B.). Automated tactical maintenance planning based on machine monitoring. Int J Prod Res 34 3 (1996) 753-766
    • (1996) Int J Prod Res , vol.34 , Issue.3 , pp. 753-766
    • Knapp, G.M.1    Wang H.-P.(B.)2
  • 15
    • 34547797153 scopus 로고    scopus 로고
    • Kimura F, Hata T, Kobayashi N. Reliability-centered maintenance planning based on computer-aided FMEA. In: The 35th CIRP-international seminar on manufacturing systems, Seoul, Korea, 12-15 May 2002.
  • 16
    • 34547822236 scopus 로고    scopus 로고
    • Funk P, Jackson M. Experience based diagnostics and condition based maintenance within production systems, (IDP), COMADEM. In: David Mba, editor. Proceedings of the 18th international congress and exhibition on condition monitoring and diagnostic engineering management, United Kingdom, August 2005, p. 7.
  • 18
    • 34547765138 scopus 로고    scopus 로고
    • Demeulemeester E. Optimal algorithms for various classes of multiple resource-constrained project scheduling problems, unpublished PhD dissertation, Universit Catholique de Louvain, Belgique, 1992.
  • 19
    • 34547747627 scopus 로고    scopus 로고
    • Boer R. de, Resource-constraint Multi-project Management, a Hierarchical Decision Support System. Enschede: Febodruk B.V., PhD thesis, 1998, ISBN:90-36512069.
  • 20
    • 0033225001 scopus 로고    scopus 로고
    • A quantitative analysis of the factors affecting personnel capacity requirement in maintenance department
    • Luczak H., and Mjema E.A.M. A quantitative analysis of the factors affecting personnel capacity requirement in maintenance department. Int J Prod Res 37 17 (1999) 4021-4037
    • (1999) Int J Prod Res , vol.37 , Issue.17 , pp. 4021-4037
    • Luczak, H.1    Mjema, E.A.M.2
  • 21
    • 0036381237 scopus 로고    scopus 로고
    • An analysis of personnel capacity requirement in the maintenance department by using a simulation method
    • Mjema E.A.M. An analysis of personnel capacity requirement in the maintenance department by using a simulation method. J Qual Maintenance Eng 8 3 (2002) 253-273
    • (2002) J Qual Maintenance Eng , vol.8 , Issue.3 , pp. 253-273
    • Mjema, E.A.M.1
  • 22
    • 34547761993 scopus 로고    scopus 로고
    • Hans EW, Herroelen W, Leus R, Wullink G. A hierarchical approach to multi-project planning under uncertainty. Working paper, School of Business, Public Administration & Technology Universiteit Twente, The Netherlands, October 2003.
  • 23
    • 29744454119 scopus 로고    scopus 로고
    • An integrated system for managing ship repair operations
    • Mourtzis D. An integrated system for managing ship repair operations. Int J Comp Integ M 18 8 (2005) 721-733
    • (2005) Int J Comp Integ M , vol.18 , Issue.8 , pp. 721-733
    • Mourtzis, D.1
  • 24
    • 0003926816 scopus 로고    scopus 로고
    • The North River Press, Great Barrington
    • Goldratt E.M. Critical chain (1997), The North River Press, Great Barrington
    • (1997) Critical chain
    • Goldratt, E.M.1
  • 29
    • 0033800675 scopus 로고    scopus 로고
    • Applying the theory of constraints: managing multiple deadlines
    • Michalski L. Applying the theory of constraints: managing multiple deadlines. Pharm Technol 24 (2000) 126-132
    • (2000) Pharm Technol , vol.24 , pp. 126-132
    • Michalski, L.1
  • 30
    • 0033896225 scopus 로고    scopus 로고
    • Critical chain: the theory of constraints applied to project management
    • Rand G.K. Critical chain: the theory of constraints applied to project management. Int J Project Manage 18 (2000) 173-177
    • (2000) Int J Project Manage , vol.18 , pp. 173-177
    • Rand, G.K.1
  • 31
    • 0035426806 scopus 로고    scopus 로고
    • An investigation into the fundamentals of critical chain project scheduling
    • Steyn H. An investigation into the fundamentals of critical chain project scheduling. Int J Project Manag 19 (2000) 363-369
    • (2000) Int J Project Manag , vol.19 , pp. 363-369
    • Steyn, H.1
  • 32
    • 34547788486 scopus 로고    scopus 로고
    • Newbold RC. Introduction to critical chain project management. ProChain Solutions Inc., 〈http://www.prochain.com〉, 2001.
  • 33
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • Herroelen W., and Leus R. On the merits and pitfalls of critical chain scheduling. J Oper Manag 19 (2001) 559-577
    • (2001) J Oper Manag , vol.19 , pp. 559-577
    • Herroelen, W.1    Leus, R.2
  • 34
    • 0002645824 scopus 로고    scopus 로고
    • Project management improves project performance
    • Leach L.P. Project management improves project performance. Project Manage J 30 (1999) 39-51
    • (1999) Project Manage J , vol.30 , pp. 39-51
    • Leach, L.P.1
  • 36
    • 0036467045 scopus 로고    scopus 로고
    • Improving efficiency: time-critical interfacing of project tasks
    • Hameri A.-P., and Heikkilä J. Improving efficiency: time-critical interfacing of project tasks. Int J Project Manag 20 (2002) 143-153
    • (2002) Int J Project Manag , vol.20 , pp. 143-153
    • Hameri, A.-P.1    Heikkilä, J.2
  • 37
    • 34547775425 scopus 로고    scopus 로고
    • Rizzo T. A New Jersey Corporation: The Critical Chain Method. Product Development Institute Inc., 〈http://www.pdinstitute.com/tutorial〉. 2006.
  • 38
    • 34547787429 scopus 로고    scopus 로고
    • Backlund F. Managing RCM introduction: A literature study, Research Report 2003:2, Division of Quality and Environmental Management, Luleå, Sweden, 2003.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.