메뉴 건너뛰기




Volumn 37, Issue 17, 1999, Pages 4021-4037

A quantitative analysis of the factors affecting personnel capacity requirement in maintenance department

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COSTS; JOB ANALYSIS; MATHEMATICAL MODELS; PERSONNEL; PRODUCTION;

EID: 0033225001     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499189907     Document Type: Article
Times cited : (4)

References (23)
  • 2
    • 0023451292 scopus 로고
    • A Simulation study of some maintenance policies in a group technology
    • Banerjee, A., and Flynn, B. B., 1987, A Simulation study of some maintenance policies in a group technology. International Journal of Production Research, 25, 1595-1609.
    • (1987) International Journal of Production Research , vol.25 , pp. 1595-1609
    • Banerjee, A.1    Flynn, B.B.2
  • 4
    • 0024928230 scopus 로고
    • Critical machines preventive maintenance policies for group technology shops
    • Flynn, B. B., 1989, Critical machines preventive maintenance policies for group technology shops. International Journal of Production Research, 27, 2009-2020.
    • (1989) International Journal of Production Research , vol.27 , pp. 2009-2020
    • Flynn, B.B.1
  • 5
    • 0343279813 scopus 로고
    • Arbeitstudien und Stellenbesetzungsplanung-Methoden des ratio nellen Arbeitskrfteeinsatzes
    • Hagener, G. W., 1975, Arbeitstudien und Stellenbesetzungsplanung-Methoden des ratio nellen Arbeitskrfteeinsatzes, REFA-Nachrichten, 19, 114-125.
    • (1975) Refa-Nachrichten , vol.19 , pp. 114-125
    • Hagener, G.W.1
  • 6
    • 0343715411 scopus 로고
    • 1st edition, edited by R. Hackstein (Aachen, Germany: Institute of Industrial Engineering, Aachen University of Technology)
    • Hackstein, R., 1989, Arbeitswissenschaf t und Betriebsorganization (II). 1st edition, edited by R. Hackstein (Aachen, Germany: Institute of Industrial Engineering, Aachen University of Technology).
    • (1989) Arbeitswissenschaf T Und Betriebsorganization (II).
    • Hackstein, R.1
  • 7
    • 0029124819 scopus 로고
    • Macroergonomic anticipatory evaluation of work organization in produc tion systems
    • Luczak, H., 1995, Macroergonomic anticipatory evaluation of work organization in produc tion systems. Ergonomics 38, 1571-1599;
    • (1995) Ergonomics , vol.38 , pp. 1571-1599
    • Luczak, H.1
  • 8
    • 85023540051 scopus 로고
    • Modelle flexibler Arbeitsformen und Arbeitszeiten
    • Proceedings of the Colloquium Produktionstechnisches Kolloquium, edited by G. Spur, Berlin Germany
    • Luczak, H., 1986, Modelle flexibler Arbeitsformen und Arbeitszeiten. CIM Die Informationstechnische Herausforderung. Proceedings of the Colloquium Produktionstechnisches Kolloquium, edited by G. Spur, Berlin Germany, pp. 227-245.
    • (1986) CIM Die Informationstechnische Herausforderung. , pp. 227-245
    • Luczak, H.1
  • 9
    • 0343279810 scopus 로고
    • Downtime analysis for automatic moulding plants
    • Luczak, H., and Sallmann, 1995, Downtime analysis for automatic moulding plants. International Journal of Production Research, 33, 319-332.
    • (1995) International Journal of Production Research , vol.33 , pp. 319-332
    • Luczak, H.1
  • 10
    • 0010513698 scopus 로고
    • Zur Validitt von WF-Mento
    • edited by R. Hackstein et al. (Berlin Heidelberg New York: Springer Verlag
    • Luczak, H., and Samli, S., 1986, Zur Validitt von WF-Mento. Arbeitsorganization und neue Technologien, edited by R. Hackstein et al. (Berlin Heidelberg New York: Springer Verlag), pp. 599-632.
    • (1986) Arbeitsorganization Und Neue Technologien , pp. 599-632
    • Luczak, H.1    Samli, S.2
  • 11
    • 0342845131 scopus 로고
    • Kostenfaktor= Indirekte Bereiche
    • 22-23 February 1990, Baden Soden Germany, pp
    • Michaelis, U., and Schnier, L-O., 1990, Kostenfaktor= Indirekte Bereiche. Proceedings of the ‘AWF-symposium’, 22-23 February 1990, Baden Soden Germany, pp. 198-216
    • (1990) Proceedings of the ‘AWF-symposium’ , pp. 198-216
    • Michaelis, U.1    Schnier, L.-O.2
  • 14
    • 0022752745 scopus 로고
    • Availability estimation of a cement manu facturing plant through simulation
    • Mohanty, R. P., and Mohanty, K. K, 1986, Availability estimation of a cement manu facturing plant through simulation. Maintenance Management International, 6, 167-180.
    • (1986) Maintenance Management International , vol.6 , pp. 167-180
    • Mohanty, R.P.1    Mohanty, K.K.2
  • 15
    • 0010439906 scopus 로고
    • M-glichkeiten der Ermittlung von Besetzungsnormen in Instandhaltungsbereichen
    • Neuber, S., and Witt, C. D., 1990, M-glichkeiten der Ermittlung von Besetzungsnormen in Instandhaltungsbereichen. Fertigungstechnik und Betrieb, 40, 360.
    • (1990) Fertigungstechnik Und Betrieb , vol.40 , pp. 360
    • Neuber, S.1    Witt, C.D.2
  • 16
    • 0343279801 scopus 로고
    • Planung und Kontrolle der Verwaltungskosten in Unternehmen
    • Picot, A., and RischmUller, G, 1981, Planung und Kontrolle der Verwaltungskosten in Unternehmen, ZfB, 51, 331-346.
    • (1981) Zfb , vol.51 , pp. 331-346
    • Picot, A.1    Rischmuller, G.2
  • 18
    • 85016307418 scopus 로고    scopus 로고
    • Incorporating maintenance activities into produc tion planning; integration at the master schedule versus material requirement level
    • Rishel, T D., and Christy, D. P., 1996, Incorporating maintenance activities into produc tion planning; integration at the master schedule versus material requirement level. International Journal of Production Research, 34, 421-446.
    • (1996) International Journal of Production Research , vol.34 , pp. 421-446
    • Rishel, T.D.1    Christy, D.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.