메뉴 건너뛰기




Volumn 40, Issue 2, 1999, Pages 43-47

Quantifying buffers for project schedules

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0040318385     PISSN: 08978336     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (39)

References (5)
  • 1
    • 0025682920 scopus 로고
    • Probabilistic simulation studies for repetitive construction processes
    • American Society of Civil Engineers Dec.
    • AbouRizk, S.M., and D.W. Halpin. "Probabilistic Simulation Studies for Repetitive Construction Processes," Journal of Construction Engineering and Management, American Society of Civil Engineers 116, no. 4 (Dec. 1990): 575-594.
    • (1990) Journal of Construction Engineering and Management , vol.116 , Issue.4 , pp. 575-594
    • AbouRizk, S.M.1    Halpin, D.W.2
  • 3
    • 0003926816 scopus 로고    scopus 로고
    • Great Barrington, Mass.: North River Press
    • Goldratt, E.M. Critical Chain. Great Barrington, Mass.: North River Press, 1997.
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 4
    • 0000940665 scopus 로고
    • A smarter way to manufacture
    • Apr. 30
    • Port, O., Z. Schiller, and R.W. King, "A Smarter Way to Manufacture." Business Week, no. 3157 (Apr. 30, 1990): 110-117.
    • (1990) Business Week , vol.3157 , pp. 110-117
    • Port, O.1    Schiller, Z.2    King, R.W.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.