Accuracy of highway contractor's schedules

Author keywords

Construction management; Contractors; Highway construction; Scheduling

Indexed keywords

CONSTRUCTION MANAGEMENT; CONTRACTORS; CRITICAL PATH METHOD (CPM); HIGHWAY CONSTRUCTION;

EID: 13944263987     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:5(647)     Document Type: Article
Times cited : (7)

References (16)
  • 1
    • 0342646276 scopus 로고
    • Concurrent delays in construction litigation
    • Arditi, D., and Robinson, M. A. (1995). "Concurrent delays in construction litigation." Cost Eng., 37(7), 20-30.
    • (1995) Cost Eng. , vol.37 , Issue.7 , pp. 20-30
    • Arditi, D.1    Robinson, M.A.2
  • 3
    • 13944249684 scopus 로고    scopus 로고
    • MDOT Engineer of Construction Retired. 10 October
    • Dobie, G., MDOT Engineer of Construction Retired. Interview Letter to the Author. 10 October 2001.
    • (2001) Interview Letter to the Author
    • Dobie, G.1
  • 4
    • 13944273539 scopus 로고    scopus 로고
    • Standard specification for road and bridge construction on federal highway projects
    • U.S. Department of Transportation, Washington, D.C.
    • Federal Highway Administration (FHWA. (1996). "Standard specification for road and bridge construction on federal highway projects." FP-96, U.S. Department of Transportation, Washington, D.C.
    • (1996) FP-96
  • 5
    • 0003926816 scopus 로고    scopus 로고
    • North River Press, Great Barrington, Mass.
    • Goldratt, E. M. (1997). Critical chain, North River Press, Great Barrington, Mass.
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 6
    • 0030145455 scopus 로고    scopus 로고
    • The reliability of critical path method (CPM) techniques in the analysis and evaluation of delay claims
    • Kallo, G. G. (1996). "The reliability of critical path method (CPM) techniques in the analysis and evaluation of delay claims." Cost Eng., 38(5), 35-37.
    • (1996) Cost Eng. , vol.38 , Issue.5 , pp. 35-37
    • Kallo, G.G.1
  • 7
    • 0028132503 scopus 로고
    • Facilitate delay claim with as-built schedule databases
    • K. Khozeimeh, ed. ASCE, Reston, VA
    • Knoke, J. R., and Jentzen, G. H. (1994). "Facilitate delay claim with as-built schedule databases." Computing in Civil Engineering. K. Khozeimeh, ed. ASCE, Reston, VA, 2104-2111.
    • (1994) Computing in Civil Engineering , pp. 2104-2111
    • Knoke, J.R.1    Jentzen, G.H.2
  • 8
    • 0023594272 scopus 로고
    • Concurrent delays in construction projects
    • Kraiem, Z. I., and Diekmann, J. E. (1987). "Concurrent delays in construction projects." J. Constr. Eng. Manage., 113(4), 591-602.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.4 , pp. 591-602
    • Kraiem, Z.I.1    Diekmann, J.E.2
  • 9
    • 13944284651 scopus 로고    scopus 로고
    • C&T Training Center, Michigan Dept. of Transportation, Lansing, Mich.
    • MDOT/MRBA/AUC/progress schedule summit. (1999). C&T Training Center, Michigan Dept. of Transportation, Lansing, Mich.
    • (1999) MDOT/MRBA/AUC/progress Schedule Summit
  • 11
    • 13944257105 scopus 로고    scopus 로고
    • Special provision for progress schedule
    • Lansing, Mich.
    • Michigan Dept. of Transportation. (1999). "Special provision for progress schedule." FUSP102 (G), Lansing, Mich.
    • (1999) FUSP102 (G)
  • 12
    • 13944253408 scopus 로고    scopus 로고
    • Special Provision of proposal submission, award, and execution of contract
    • Lansing, Mich.
    • Michigan Dept. of Transportation. (2001). "Special Provision of proposal submission, award, and execution of contract." FUSP102 (I), Lansing, Mich.
    • (2001) FUSP102 (I)
  • 14
    • 0035132258 scopus 로고    scopus 로고
    • Construction delay computation method
    • Shi, J. J., Cheung, S. O., and Arditi, D. (2001). "Construction delay computation method." J. Constr. Eng. Manage. 127(1), 60-65.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 60-65
    • Shi, J.J.1    Cheung, S.O.2    Arditi, D.3
  • 16
    • 0027610716 scopus 로고
    • Construction decision support system for delay analysis
    • Yates, J. K. (1993). "Construction decision support system for delay analysis." J. Constr. Eng. Manage., 119(2), 226-244.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.2 , pp. 226-244
    • Yates, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.