-
1
-
-
0342646276
-
Concurrent delays in construction litigation
-
Arditi, D., and Robinson, M. A. (1995). "Concurrent delays in construction litigation." Cost Eng., 37(7), 20-30.
-
(1995)
Cost Eng.
, vol.37
, Issue.7
, pp. 20-30
-
-
Arditi, D.1
Robinson, M.A.2
-
3
-
-
13944249684
-
-
MDOT Engineer of Construction Retired. 10 October
-
Dobie, G., MDOT Engineer of Construction Retired. Interview Letter to the Author. 10 October 2001.
-
(2001)
Interview Letter to the Author
-
-
Dobie, G.1
-
4
-
-
13944273539
-
Standard specification for road and bridge construction on federal highway projects
-
U.S. Department of Transportation, Washington, D.C.
-
Federal Highway Administration (FHWA. (1996). "Standard specification for road and bridge construction on federal highway projects." FP-96, U.S. Department of Transportation, Washington, D.C.
-
(1996)
FP-96
-
-
-
5
-
-
0003926816
-
-
North River Press, Great Barrington, Mass.
-
Goldratt, E. M. (1997). Critical chain, North River Press, Great Barrington, Mass.
-
(1997)
Critical Chain
-
-
Goldratt, E.M.1
-
6
-
-
0030145455
-
The reliability of critical path method (CPM) techniques in the analysis and evaluation of delay claims
-
Kallo, G. G. (1996). "The reliability of critical path method (CPM) techniques in the analysis and evaluation of delay claims." Cost Eng., 38(5), 35-37.
-
(1996)
Cost Eng.
, vol.38
, Issue.5
, pp. 35-37
-
-
Kallo, G.G.1
-
7
-
-
0028132503
-
Facilitate delay claim with as-built schedule databases
-
K. Khozeimeh, ed. ASCE, Reston, VA
-
Knoke, J. R., and Jentzen, G. H. (1994). "Facilitate delay claim with as-built schedule databases." Computing in Civil Engineering. K. Khozeimeh, ed. ASCE, Reston, VA, 2104-2111.
-
(1994)
Computing in Civil Engineering
, pp. 2104-2111
-
-
Knoke, J.R.1
Jentzen, G.H.2
-
8
-
-
0023594272
-
Concurrent delays in construction projects
-
Kraiem, Z. I., and Diekmann, J. E. (1987). "Concurrent delays in construction projects." J. Constr. Eng. Manage., 113(4), 591-602.
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.4
, pp. 591-602
-
-
Kraiem, Z.I.1
Diekmann, J.E.2
-
9
-
-
13944284651
-
-
C&T Training Center, Michigan Dept. of Transportation, Lansing, Mich.
-
MDOT/MRBA/AUC/progress schedule summit. (1999). C&T Training Center, Michigan Dept. of Transportation, Lansing, Mich.
-
(1999)
MDOT/MRBA/AUC/progress Schedule Summit
-
-
-
11
-
-
13944257105
-
Special provision for progress schedule
-
Lansing, Mich.
-
Michigan Dept. of Transportation. (1999). "Special provision for progress schedule." FUSP102 (G), Lansing, Mich.
-
(1999)
FUSP102 (G)
-
-
-
12
-
-
13944253408
-
Special Provision of proposal submission, award, and execution of contract
-
Lansing, Mich.
-
Michigan Dept. of Transportation. (2001). "Special Provision of proposal submission, award, and execution of contract." FUSP102 (I), Lansing, Mich.
-
(2001)
FUSP102 (I)
-
-
-
14
-
-
0035132258
-
Construction delay computation method
-
Shi, J. J., Cheung, S. O., and Arditi, D. (2001). "Construction delay computation method." J. Constr. Eng. Manage. 127(1), 60-65.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 60-65
-
-
Shi, J.J.1
Cheung, S.O.2
Arditi, D.3
-
16
-
-
0027610716
-
Construction decision support system for delay analysis
-
Yates, J. K. (1993). "Construction decision support system for delay analysis." J. Constr. Eng. Manage., 119(2), 226-244.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 226-244
-
-
Yates, J.K.1
|