Line-of-balance scheduling in pavement construction
-
Arditi, D. & Albulak, M.Z. (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management, ASCE, 112 (3), 411–424.
-
(1986)
Journal of Construction Engineering and Management, ASCE
, vol.112
, Issue.3
, pp. 411-424
-
-
Arditi, D.1
Albulak, M.Z.2
-
4
-
-
0019030430
-
Simulation of repetitive-unit construction
-
Ashley, D.B. (1980) Simulation of repetitive-unit construction. Journal of the Construction Division, ASCE, 106 (CO2), 411–424.
-
(1980)
Journal of the Construction Division, ASCE
, vol.106
, Issue.CO2
, pp. 411-424
-
-
Ashley, D.B.1
-
5
-
-
84992985811
-
-
Washington, DC. Constructor
-
Associated General Contractors of America (1993) Associated General Contractors of America, Washington, DC. Constructor, LXXV (6), 7.
-
(1993)
Associated General Contractors of America
, vol.75
, Issue.6
, pp. 7
-
-
-
6
-
-
3743060284
-
-
Masters Thesis, Department of Civil Engineering, Virginia Polytechnic Institute and State University, Blacksburg, VA
-
Bafna, T. (1991) Extending the range of linear scheduling in highway construction. Masters Thesis, Department of Civil Engineering, Virginia Polytechnic Institute and State University, Blacksburg, VA.
-
(1991)
Extending the range of linear scheduling in highway construction
-
-
Bafna, T.1
-
8
-
-
0019064535
-
Construction planning-beyond the critical path
-
Birrell, G.S. (1980) Construction planning-beyond the critical path. Journal of the Construction Division, ASCE, 106 (CO3), 389–407.
-
(1980)
Journal of the Construction Division, ASCE
, vol.106
, Issue.CO3
, pp. 389-407
-
-
Birrell, G.S.1
-
9
-
-
0004278233
-
-
McGraw-Hill, New York, NY
-
Callahan, M.T., Quackenbush, D.G. & Rowings, J.E. (1992) Construction Project Scheduling, McGraw-Hill, New York, NY.
-
(1992)
Construction Project Scheduling
-
-
Callahan, M.T.1
Quackenbush, D.G.2
Rowings, J.E.3
-
10
-
-
0000981977
-
Planning construction of repetitive building units
-
Carr, R.I. & Meyer, W.L. (1974) Planning construction of repetitive building units. Journal of the Construction Division, ASCE, 100 (CO3), 403–412.
-
(1974)
Journal of the Construction Division, ASCE
, vol.100
, Issue.CO3
, pp. 403-412
-
-
Carr, R.I.1
Meyer, W.L.2
-
11
-
-
0022917749
-
Application of linear construction
-
Chrzanowski, E.N., Jr & & Johnston, D.W. (1986) Application of linear construction. Journal of Construction Engineering, ASCE, 112 (4), 476–491.
-
(1986)
Journal of Construction Engineering, ASCE
, vol.112
, Issue.4
, pp. 476-491
-
-
Chrzanowski, E.N.1
Johnston, D.W.2
-
13
-
-
0026381933
-
Construction scheduling. Principles, practices, and six case studies
-
Cole, L.J.R. (1991) Construction scheduling. Principles, practices, and six case studies. Journal of Construction Engineering and Management, ASCE, 117 (4), 579–588.
-
(1991)
Journal of Construction Engineering and Management, ASCE
, vol.117
, Issue.4
, pp. 579-588
-
-
Cole, L.J.R.1
-
14
-
-
0016342705
-
Stochastic scheduling of linear construction sites
-
Dressier, J. (1974) Stochastic scheduling of linear construction sites. Journal of the Construction Division, ASCE, 100 (CO4), 571–587.
-
(1974)
Journal of the Construction Division, ASCE
, vol.100
, Issue.CO4
, pp. 571-587
-
-
Dressier, J.1
-
15
-
-
84882365727
-
-
Masters Thesis, Department of Civil Engineering, University of British Columbia, Vancouver
-
Dubey, A. (1993) Resource leveling and linear construction. Masters Thesis, Department of Civil Engineering, University of British Columbia, Vancouver.
-
(1993)
Resource leveling and linear construction
-
-
Dubey, A.1
-
17
-
-
85128102291
-
Line of balance gives the answer
-
Finck, N.E. (1965) Line of balance gives the answer. Systems and Procedures Journal, 16 (4), 8–14.
-
(1965)
Systems and Procedures Journal
, vol.16
, Issue.4
, pp. 8-14
-
-
Finck, N.E.1
-
19
-
-
3743100358
-
How to get visual impact on planning drawings
-
Gorman, J.E. (1972) How to get visual impact on planning drawings. Roads and Streets, 115 (8), 74–75.
-
(1972)
Roads and Streets
, vol.115
, Issue.8
, pp. 74-75
-
-
Gorman, J.E.1
-
20
-
-
5844417448
-
-
Division of Construction Engineering and Management, Purdue University, West Lafayette, IN
-
Halpin, D.W. (1990) MicroCYCLONE System Manual. Division of Construction Engineering and Management, Purdue University, West Lafayette, IN.
-
(1990)
MicroCYCLONE System Manual
-
-
Halpin, D.W.1
-
25
-
-
3743078150
-
-
UMCEE Report No. 96-26, Civil and Environmental Engineering Department, University of Michigan, Ann Arbor, MI
-
Harris, R.B. (1996) Scheduling Projects with Repeating Activities. UMCEE Report No. 96-26, Civil and Environmental Engineering Department, University of Michigan, Ann Arbor, MI.
-
(1996)
Scheduling Projects with Repeating Activities
-
-
Harris, R.B.1
-
26
-
-
0023569757
-
Evaluation of scheduling techniques for highway construction projects
-
Herbsman, Z.J. (1987) Evaluation of scheduling techniques for highway construction projects. Transportation Research Record, 1126, 110–120.
-
(1987)
Transportation Research Record
, vol.1126
, pp. 110-120
-
-
Herbsman, Z.J.1
-
27
-
-
84992946230
-
Graphically-based LP modeling for linear construction scheduling
-
ASCE, Nashville, TN, (ed. S.L. Weber), ASCE, Nashville, TN
-
Huang, R. & Halpin, D.W. (1994) Graphically-based LP modeling for linear construction scheduling. In: Proceedings of Equipment Resource Management into the 21st Century, ASCE, Nashville, TN, (ed. S.L. Weber), pp. 148–155. ASCE, Nashville, TN.
-
(1994)
Proceedings of Equipment Resource Management into the 21st Century
, pp. 148-155
-
-
Huang, R.1
Halpin, D.W.2
-
28
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston, D.W. (1981) Linear scheduling method for highway construction. Journal of the Construction Division, ASCE, 107 (CO2), 247–261.
-
(1981)
Journal of the Construction Division, ASCE
, vol.107
, Issue.CO2
, pp. 247-261
-
-
Johnston, D.W.1
-
29
-
-
0004749860
-
The application of the ‘line of balance’ technique to the construction industry
-
July
-
Khisty, C.J. (1970) The application of the ‘line of balance’ technique to the construction industry. Indian Concrete Journal, July, 297–320.
-
(1970)
Indian Concrete Journal
, pp. 297-320
-
-
Khisty, C.J.1
-
30
-
-
0004749861
-
The application of line of balance on an international project
-
NCC Publications, Birmingham, September
-
Levine, H.A., Aliberti, E.M. & Ford, B.P. (1976) The application of line of balance on an international project. In Proceedings of the Fifth Internet Congress, Project Implementation and Management: Bridging the Gap, NCC Publications, Birmingham, September, pp. 251–258.
-
(1976)
Proceedings of the Fifth Internet Congress, Project Implementation and Management: Bridging the Gap
, pp. 251-258
-
-
Levine, H.A.1
Aliberti, E.M.2
Ford, B.P.3
-
33
-
-
3042918248
-
-
McGraw-Hill, New York, NY
-
Miller, R.W. (1963) Schedule, Cost, and Profit Control with PERT. McGraw-Hill, New York, NY.
-
(1963)
Schedule, Cost, and Profit Control with PERT
-
-
Miller, R.W.1
-
36
-
-
84992996598
-
How line of balance is used to establish personnel requirements
-
Office of Naval Material (1961) How line of balance is used to establish personnel requirements. Navy Management Review, VI (2), P-910.
-
(1961)
Navy Management Review
, vol.6
, Issue.2
, pp. 910
-
-
-
37
-
-
12444338435
-
-
Office of Naval Material, NAVEXOS P1853, Department of the Navy, Washington, DC
-
Office of Naval Material (1962) Line-of-Balance Technology: A Graphic Method of Industrial Programming. Office of Naval Material, NAVEXOS P1853, Department of the Navy, Washington, DC.
-
(1962)
Line-of-Balance Technology: A Graphic Method of Industrial Programming
-
-
-
38
-
-
2142649813
-
Network analysis and construction planning
-
Peer, S. (1974) Network analysis and construction planning. Journal of the Construction Division, ASCE, 100 (CO3), 203–210.
-
(1974)
Journal of the Construction Division, ASCE
, vol.100
, Issue.CO3
, pp. 203-210
-
-
Peer, S.1
-
42
-
-
0023984188
-
Extensions to linear scheduling optimization
-
Russell, A.D. & Caselton, W.F. (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, ASCE, 114 (1), 36–52.
-
(1988)
Journal of Construction Engineering and Management, ASCE
, vol.114
, Issue.1
, pp. 36-52
-
-
Russell, A.D.1
Caselton, W.F.2
-
43
-
-
0029216528
-
Resource leveling and linear scheduling
-
ASCE, ASCE, Nashville, TN, (ed. J.P. Mohsen), ASCE, Nashville, TN
-
Russell, A. & Dubey, A. (1995) Resource leveling and linear scheduling. In: Proceedings, Second Congress, Computing in Civil Engineering, ASCE, ASCE, Nashville, TN, (ed. J.P. Mohsen), pp. 1134–1141. ASCE, Nashville, TN.
-
(1995)
Proceedings, Second Congress, Computing in Civil Engineering
, pp. 1134-1141
-
-
Russell, A.1
Dubey, A.2
-
44
-
-
0027607475
-
New generation of planning structures
-
Russell, A.D. & Wong, W.C.M. (1993) New generation of planning structures. Journal of Construction Engineering and Management, ASCE, 119 (2), 196–214.
-
(1993)
Journal of Construction Engineering and Management, ASCE
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
45
-
-
84974867429
-
-
The Scientific Press, San Francisco, CA
-
Schrage, L. (1991) User's Manual for Linear, Integer, and Quadratic Programming with LINDO. The Scientific Press, San Francisco, CA.
-
(1991)
User's Manual for Linear, Integer, and Quadratic Programming with LINDO
-
-
Schrage, L.1
-
46
-
-
0019030431
-
Construction planning for linear projects
-
Seiinger, S. (1980) Construction planning for linear projects. Journal of the Construction Division, ASCE, 106 (CO2), 195–205.
-
(1980)
Journal of the Construction Division, ASCE
, vol.106
, Issue.CO2
, pp. 195-205
-
-
Seiinger, S.1
-
47
-
-
0020178299
-
Time space scheduling method
-
Stradal, O. & Cacha, J. (1982) Time space scheduling method. Journal of the Construction Division, ASCE, 108 (CO3), 445–457.
-
(1982)
Journal of the Construction Division, ASCE
, vol.108
, Issue.CO3
, pp. 445-457
-
-
Stradal, O.1
Cacha, J.2
-
49
-
-
0028495816
-
CPM/LOB: new methodology to integrate CPM and line of balance
-
Suhail, S.A. & Neale, R.H. (1994) CPM/LOB: new methodology to integrate CPM and line of balance. Journal of Construction Engineering and Management, ASCE, 120 (3), 667–684.
-
(1994)
Journal of Construction Engineering and Management, ASCE
, vol.120
, Issue.3
, pp. 667-684
-
-
Suhail, S.A.1
Neale, R.H.2
-
50
-
-
0025460174
-
CPM use in ENR top 400 contractors
-
Tavakoli, A. & Riachi, R. (1990) CPM use in ENR top 400 contractors. Journal of Management in Engineering, ASCE, 6 (3), 282–295.
-
(1990)
Journal of Management in Engineering, ASCE
, vol.6
, Issue.3
, pp. 282-295
-
-
Tavakoli, A.1
Riachi, R.2
-
51
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
Thabet, W.Y. & Beliveau, Y.J. (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal Construction Engineering and Management, ASCE, 120 (1), 96–116.
-
(1994)
Journal Construction Engineering and Management, ASCE
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
52
-
-
84993022485
-
-
Army Material Command Pamphlet 11-5, United States Army Command, Washington, DC
-
United States Army Command (1968) Army Programs: Line of Balance. Army Material Command Pamphlet 11-5, United States Army Command, Washington, DC.
-
(1968)
Army Programs: Line of Balance
-
-
-
53
-
-
84930116614
-
Discussion of ‘Formal development of line-of-balance technique’ by Al Sarraj, Z. M
-
Vorster, M.C. & Bafna, T. (1992) Discussion of ‘Formal development of line-of-balance technique’ by Al Sarraj, Z. M. Journal of Construction Engineering and Management, ASCE, 118 (1), 210–211.
-
(1992)
Journal of Construction Engineering and Management, ASCE
, vol.118
, Issue.1
, pp. 210-211
-
-
Vorster, M.C.1
Bafna, T.2
-
54
-
-
0002872941
-
Linear scheduling and visualization
-
Vorster, M.C., Beliveau, Y.J. & Bafna, T. (1992) Linear scheduling and visualization. Transportation Research Record, 1351, 32–39.
-
(1992)
Transportation Research Record
, vol.1351
, pp. 32-39
-
-
Vorster, M.C.1
Beliveau, Y.J.2
Bafna, T.3
|