-
1
-
-
0000191706
-
Scheduling/cost optimization and neural dynamics model for construction
-
ASCE
-
Adeli, H. and Karim, A. (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, ASCE, 123(4), 450-8.
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.4
, pp. 450-458
-
-
Adeli, H.1
Karim, A.2
-
2
-
-
0035482888
-
Algorithm for determining controlling path considering resource continuity
-
ASCE
-
Ammar, M.A. and Elbeltagi, E. (2001) Algorithm for determining controlling path considering resource continuity. Journal of Computing in Civil Engineering, ASCE, 15(4), 292-8.
-
(2001)
Journal of Computing in Civil Engineering
, vol.15
, Issue.4
, pp. 292-298
-
-
Ammar, M.A.1
Elbeltagi, E.2
-
3
-
-
0022778511
-
Line-of-balance scheduling in pavement construction
-
ASCE
-
Arditi, D. and Albulak, M.Z. (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering, ASCE, 112(3), pp. 411-24.
-
(1986)
Journal of Construction Engineering
, vol.112
, Issue.3
, pp. 411-424
-
-
Arditi, D.1
Albulak, M.Z.2
-
4
-
-
0019030430
-
Simulation of repetitive-unit construction
-
ASCE
-
Ashley, D.B. (1980) Simulation of repetitive-unit construction. Journal of the Construction Division, ASCE, 106(2), 185-94.
-
(1980)
Journal of the Construction Division
, vol.106
, Issue.2
, pp. 185-194
-
-
Ashley, D.B.1
-
7
-
-
0019064535
-
Construction planning - Beyond the critical path
-
ASCE
-
Birrell, G.S. (1980) Construction planning - beyond the critical path. Journal of the Construction Division, ASCE, 106(3), 389-407.
-
(1980)
Journal of the Construction Division
, vol.106
, Issue.3
, pp. 389-407
-
-
Birrell, G.S.1
-
8
-
-
4043152659
-
Flow chart to control progress on housing units
-
Building Research Station
-
Building Research Station (1971) Flow chart to control progress on housing units. Building Research Station Digest, 134, 1-7.
-
(1971)
Building Research Station Digest
, vol.134
, pp. 1-7
-
-
-
9
-
-
0000981977
-
Planning construction of repetitive building units
-
ASCE
-
Carr, R.I. and Meyer, W.L. (1974) Planning construction of repetitive building units. Journal of the Construction Division, ASCE, 100(3), pp. 403-12.
-
(1974)
Journal of the Construction Division
, vol.100
, Issue.3
, pp. 403-412
-
-
Carr, R.I.1
Meyer, W.L.2
-
10
-
-
0022917749
-
Application of linear scheduling
-
ASCE
-
Chrzanowski, E.N. and Johnston, D.W. (1986) Application of linear scheduling. Journal of Construction Engineering, ASCE, 112(4), 476-91.
-
(1986)
Journal of Construction Engineering
, vol.112
, Issue.4
, pp. 476-491
-
-
Chrzanowski, E.N.1
Johnston, D.W.2
-
11
-
-
0004116989
-
-
The MIT Press and McGraw-Hill, Inc., New York
-
Cormen, T.H., Leiserson, C.E. and Rovest, R.L. (1992) Introduction to Algorithms, The MIT Press and McGraw-Hill, Inc., New York.
-
(1992)
Introduction to Algorithms
-
-
Cormen, T.H.1
Leiserson, C.E.2
Rovest, R.L.3
-
12
-
-
0019193555
-
Construction management in West Germany
-
ASCE
-
Dressler, J. (1980) Construction management in West Germany. Journal of the Construction Division, ASCE, 106(4), 477-87.
-
(1980)
Journal of the Construction Division
, vol.106
, Issue.4
, pp. 477-487
-
-
Dressler, J.1
-
13
-
-
3743100358
-
How to get visual impact on planning diagram
-
Gorman, J.E. (1972) How to get visual impact on planning diagram. Roads and Streets, 115(8), 74-5.
-
(1972)
Roads and Streets
, vol.115
, Issue.8
, pp. 74-75
-
-
Gorman, J.E.1
-
16
-
-
0000674566
-
Scheduling projects with repeating activities
-
ASCE
-
Harris, R.B. and Ioannou, P.G. (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, ASCE, 124(4), 269-78.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.4
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
17
-
-
0019583188
-
Linear scheduling method for highway construction
-
ASCE
-
Johnston, D.W. (1981) Linear scheduling method for highway construction. Journal of the Construction Division, ASCE, 107(2), 247-61.
-
(1981)
Journal of the Construction Division
, vol.107
, Issue.2
, pp. 247-261
-
-
Johnston, D.W.1
-
18
-
-
0004749860
-
The application of the line of balance technique to the construction industry
-
319-20
-
Khisty, C.J. (1970) The application of the line of balance technique to the construction industry. Indian Concrete Journal, 44(7), 297-300, 319-20.
-
(1970)
Indian Concrete Journal
, vol.44
, Issue.7
, pp. 297-300
-
-
Khisty, C.J.1
-
22
-
-
0016643558
-
VPM scheduling for high-rise buildings
-
ASCE
-
O'Brien, J.J. (1975) VPM scheduling for high-rise buildings. Journal of the Construction Division, ASCE, 101(4), 895-905.
-
(1975)
Journal of the Construction Division
, vol.101
, Issue.4
, pp. 895-905
-
-
O'Brien, J.J.1
-
23
-
-
2142649813
-
Network analysis and construction planning
-
ASCE
-
Peer, S. (1974) Network analysis and construction planning. Journal of the Construction Division, ASCE, 100(3), 203-10.
-
(1974)
Journal of the Construction Division
, vol.100
, Issue.3
, pp. 203-210
-
-
Peer, S.1
-
24
-
-
0019181302
-
Planning of housing construction using control charts
-
Perera, S. (1980) Planning of housing construction using control charts. Housing Science, 4(5), 447-58.
-
(1980)
Housing Science
, vol.4
, Issue.5
, pp. 447-458
-
-
Perera, S.1
-
25
-
-
0031362303
-
Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story buildings construction
-
New York
-
Riley, D. and Savindo, V. (1997) Space planning for mechanical, electrical, plumbing, and fire protection trades in multi-story buildings construction, in Proceedings of the 5th ASCE Construction Congress, New York, pp. 102-9.
-
(1997)
Proceedings of the 5th ASCE Construction Congress
, pp. 102-109
-
-
Riley, D.1
Savindo, V.2
-
26
-
-
84971645470
-
Use of linear scheduling in transportation projects
-
TRB, National Research Council, Washington, DC
-
Rowings, J.E. and Rahbar, F. (1992) Use of linear scheduling in transportation projects. Transportation Research Record, 1351, TRB, National Research Council, Washington, DC.
-
(1992)
Transportation Research Record
, vol.1351
-
-
Rowings, J.E.1
Rahbar, F.2
-
27
-
-
0023984188
-
Extensions to linear scheduling optimization
-
ASCE
-
Russell, A.D. and Caselton, W.F. (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, ASCE, 114(4), 36-52.
-
(1988)
Journal of Construction Engineering and Management
, vol.114
, Issue.4
, pp. 36-52
-
-
Russell, A.D.1
Caselton, W.F.2
-
28
-
-
0027607475
-
New generation of planning structures
-
ASCE
-
Russell, A.D. and Wong, W. (1993) New generation of planning structures. Journal of Construction Engineering and Management, ASCE, 119(2), 196-214.
-
(1993)
Journal of Construction Engineering and Management
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.2
-
31
-
-
0020178299
-
Time space scheduling method
-
ASCE
-
Stradal, O. and Cacha, J. (1982) Time space scheduling method. Journal of the Construction Division, ASCE, 108(3), 445-57.
-
(1982)
Journal of the Construction Division
, vol.108
, Issue.3
, pp. 445-457
-
-
Stradal, O.1
Cacha, J.2
-
32
-
-
0028495816
-
CPM/LOB: New methodology to integrate CPM and line of balance
-
ASCE
-
Suhail, S.A. and Neale, R.H. (1994) CPM/LOB: new methodology to integrate CPM and line of balance. Journal of Construction Engineering and Management, ASCE, 120(3), 667-84.
-
(1994)
Journal of Construction Engineering and Management
, vol.120
, Issue.3
, pp. 667-684
-
-
Suhail, S.A.1
Neale, R.H.2
-
33
-
-
0002872941
-
Linear scheduling and visualization
-
Vorster, M.C., Beliveau, Y.J. and Bafna, T. (1992) Linear scheduling and visualization. Transportation Research Record, 1351, 32-9.
-
(1992)
Transportation Research Record
, vol.1351
, pp. 32-39
-
-
Vorster, M.C.1
Beliveau, Y.J.2
Bafna, T.3
-
34
-
-
4043100270
-
Disturbance scheduling technique for managing renovation work
-
ASCE
-
Whiteman, W.E. and Irwig, H.G. (1988) Disturbance scheduling technique for managing renovation work. Journal of Construction Engineering and Management, ASCE, 114(2), 191-213.
-
(1988)
Journal of Construction Engineering and Management
, vol.114
, Issue.2
, pp. 191-213
-
-
Whiteman, W.E.1
Irwig, H.G.2
-
36
-
-
4043118882
-
Resource-driven scheduling for repetitive projects: A pull system approach
-
Singapore, 6-8 August
-
Yang, I.T. and Ioannou, P.G. (2001) Resource-driven scheduling for repetitive projects: a pull system approach, in Proceedings of the 9th International Group for Lean Construction Conference, Singapore, 6-8 August, pp. 365-77.
-
(2001)
Proceedings of the 9th International Group for Lean Construction Conference
, pp. 365-377
-
-
Yang, I.T.1
Ioannou, P.G.2
|