메뉴 건너뛰기




Volumn 107, Issue 2, 2007, Pages 397-403

Single-station performance evaluation and improvement in semiconductor manufacturing: A graphical approach

Author keywords

China; Cycle time; Manufacturing systems; Queue; Semiconductor manufacturing

Indexed keywords

CHINA; GRAPHIC METHODS; MANAGERS; OPTIMIZATION; THROUGHPUT;

EID: 34047181192     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2006.08.011     Document Type: Article
Times cited : (21)

References (21)
  • 1
    • 0031382160 scopus 로고    scopus 로고
    • Aurand, S., Miller, P., 1997. The operating curve: a method to measure and benchmark manufacturing line productivity. In: IEEE/SEMI Advanced Semiconductor Manufacturing Conference, pp. 391-397.
  • 3
    • 0023981636 scopus 로고
    • Empirical evaluation of a queuing network model for semiconductor wafer fabrication
    • Chen J. Empirical evaluation of a queuing network model for semiconductor wafer fabrication. Operation Research 36 1 (1988) 202-215
    • (1988) Operation Research , vol.36 , Issue.1 , pp. 202-215
    • Chen, J.1
  • 4
    • 0002958880 scopus 로고
    • Simulation of VLSI manufacturing areas
    • Dayhoff J.E., and Atherton R.W. Simulation of VLSI manufacturing areas. VLSI Design 4 (1984) 84-92
    • (1984) VLSI Design , vol.4 , pp. 84-92
    • Dayhoff, J.E.1    Atherton, R.W.2
  • 5
    • 34047161932 scopus 로고    scopus 로고
    • Fowler, J.W., Robinson, J.K., 1995. Measurement and improvement of manufacturing capacity (MIMAC) project final report. Manufacturing Science and Technology for IC Production.
  • 6
    • 0031345119 scopus 로고    scopus 로고
    • Fowler, J.W., Brown, S., Gold, H., Schoemig, A., 1997, Measurable improvements in cycle-time-constrained capacity. In: Proceedings of the Sixth International Symposium on Semiconductor Manufacturing (ISSM), San Francisco, USA.
  • 7
    • 0036532881 scopus 로고    scopus 로고
    • Performance analysis and optimization of cyclic production lines
    • Han M., and Park D. Performance analysis and optimization of cyclic production lines. IIE Transaction 34 (2002) 411-422
    • (2002) IIE Transaction , vol.34 , pp. 411-422
    • Han, M.1    Park, D.2
  • 9
    • 0033297291 scopus 로고    scopus 로고
    • Using an empirical queuing approach to predict future flow times
    • Hung Y.F., and Chang C.B. Using an empirical queuing approach to predict future flow times. Computers & Industrial Engineering 37 (1999) 809-821
    • (1999) Computers & Industrial Engineering , vol.37 , pp. 809-821
    • Hung, Y.F.1    Chang, C.B.2
  • 11
    • 10444275081 scopus 로고    scopus 로고
    • The influence of demand variability on the performance of a make-to-stock queue
    • Jemaï Z., and Karaesmen F. The influence of demand variability on the performance of a make-to-stock queue. European Journal of Operational Research 164 (2005) 195-205
    • (2005) European Journal of Operational Research , vol.164 , pp. 195-205
    • Jemaï, Z.1    Karaesmen, F.2
  • 12
    • 1442310383 scopus 로고    scopus 로고
    • Comparing variance reduction to managing system variance in a job shop
    • Kher H.V., and Fredendall L.D. Comparing variance reduction to managing system variance in a job shop. Computers & Industrial Engineering 46 1 (2004) 101-120
    • (2004) Computers & Industrial Engineering , vol.46 , Issue.1 , pp. 101-120
    • Kher, H.V.1    Fredendall, L.D.2
  • 13
    • 1642461404 scopus 로고    scopus 로고
    • Reducing cycle times in manufacturing and supply chains by input and service rate smoothing
    • Ko S.-S., Serfozo R., and Sivakumar A.I. Reducing cycle times in manufacturing and supply chains by input and service rate smoothing. IIE Transactions 36 2 (2004) 145-153
    • (2004) IIE Transactions , vol.36 , Issue.2 , pp. 145-153
    • Ko, S.-S.1    Serfozo, R.2    Sivakumar, A.I.3
  • 14
    • 84976808911 scopus 로고
    • Simulation of a semiconductor manufacturing line
    • Miller D. Simulation of a semiconductor manufacturing line. Communication of ACM 33 (1990) 98-108
    • (1990) Communication of ACM , vol.33 , pp. 98-108
    • Miller, D.1
  • 15
    • 0029771094 scopus 로고    scopus 로고
    • Performance analysis of scheduling policies in re-entrant manufacturing systems
    • Narahari Y., and Khan L.M. Performance analysis of scheduling policies in re-entrant manufacturing systems. Computers & Operations Research 23 1 (1996) 37-51
    • (1996) Computers & Operations Research , vol.23 , Issue.1 , pp. 37-51
    • Narahari, Y.1    Khan, L.M.2
  • 16
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos H.T., and Heavey C. Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research 92 (1996) l-27
    • (1996) European Journal of Operational Research , vol.92
    • Papadopoulos, H.T.1    Heavey, C.2
  • 19
    • 0036758161 scopus 로고    scopus 로고
    • Performance analysis and optimization of assemble-to-order systems with random lead times
    • Song J.S., and Yao D. Performance analysis and optimization of assemble-to-order systems with random lead times. Operations Research 50 5 (2002) 889
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 889
    • Song, J.S.1    Yao, D.2
  • 20
    • 0036242668 scopus 로고    scopus 로고
    • Analysis, design, and control of queuing systems
    • Stidham Jr. S. Analysis, design, and control of queuing systems. Operations Research 50 1 (2002) 197-216
    • (2002) Operations Research , vol.50 , Issue.1 , pp. 197-216
    • Stidham Jr., S.1
  • 21
    • 13844298908 scopus 로고    scopus 로고
    • An examination of variability and its basic properties for a manufacturing system
    • Wu K. An examination of variability and its basic properties for a manufacturing system. IEEE Transaction on Manufacturing 18 1 (2005) 214-222
    • (2005) IEEE Transaction on Manufacturing , vol.18 , Issue.1 , pp. 214-222
    • Wu, K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.