-
1
-
-
0035426460
-
Optimal material control and performance evaluation in an assembly environment with component commonality
-
Agrawal, N., M. Cohen. 2001. Optimal material control and performance evaluation in an assembly environment with component commonality. Naval Res. Logist. 48 409-429.
-
(2001)
Naval Res. Logist.
, vol.48
, pp. 409-429
-
-
Agrawal, N.1
Cohen, M.2
-
3
-
-
0000797681
-
Rearrangement, majorization, and stochastic scheduling
-
Chang, C.S., D.D. Yao. 1990. Rearrangement, majorization, and stochastic scheduling, Math. Oper. Res. 18 658-684.
-
(1990)
Math. Oper. Res.
, vol.18
, pp. 658-684
-
-
Chang, C.S.1
Yao, D.D.2
-
4
-
-
0029288586
-
Multiple failures in a multi-item spare inventory model
-
Cheung, K.L., W. Hausman. 1995. Multiple failures in a multi-item spare inventory model, IIE Trans. 27 171-180.
-
(1995)
IIE Trans.
, vol.27
, pp. 171-180
-
-
Cheung, K.L.1
Hausman, W.2
-
5
-
-
0000879068
-
Optimal policies for a multi-echelon inventory problem
-
Clark, A.J., H. Scarf. 1960. Optimal policies for a multi-echelon inventory problem. Management Sci. 6 475-490.
-
(1960)
Management Sci.
, vol.6
, pp. 475-490
-
-
Clark, A.J.1
Scarf, H.2
-
7
-
-
0034156160
-
A supply network model with base-stock control and service requirements
-
Ettl, M., G.E. Feigin, G.Y. Lin, D.D. Yao. 2000. A supply network model with base-stock control and service requirements. Oper. Res. 48 216-232.
-
(2000)
Oper. Res.
, vol.48
, pp. 216-232
-
-
Ettl, M.1
Feigin, G.E.2
Lin, G.Y.3
Yao, D.D.4
-
8
-
-
0011658992
-
k/G/∞ batch arrival queue with heterogeneous dependent servers
-
k/G/∞ batch arrival queue with heterogeneous dependent servers. J. Appl. Probab. 31 841-846.
-
(1994)
J. Appl. Probab.
, vol.31
, pp. 841-846
-
-
Falin, G.1
-
9
-
-
0022721357
-
An inventory model with limited production capacity and uncertain demands, I: The average cost criterion, II: The discounted cost criterion
-
Federgruen, A., P. Zipkin. 1986. An inventory model with limited production capacity and uncertain demands, I: The average cost criterion, II: The discounted cost criterion. Math. Oper. Res. 11 193-207.
-
(1986)
Math. Oper. Res.
, vol.11
, pp. 193-207
-
-
Federgruen, A.1
Zipkin, P.2
-
10
-
-
0035536034
-
A simple and effective component procurement policy for stochastic assembly systems
-
Gallien, J., L. Wein. 2001. A simple and effective component procurement policy for stochastic assembly systems. Queueing Sys. 38 221-248.
-
(2001)
Queueing Sys.
, vol.38
, pp. 221-248
-
-
Gallien, J.1
Wein, L.2
-
11
-
-
0031101373
-
Bounds and asymptotics for planning critical safety stocks
-
Glasserman, P. 1997. Bounds and asymptotics for planning critical safety stocks. Oper. Res. 45 244-257.
-
(1997)
Oper. Res.
, vol.45
, pp. 244-257
-
-
Glasserman, P.1
-
12
-
-
0032202098
-
Leadtime-inventory tradeoffs in assemble-to-order systems
-
_, Y. Wang. 1998. Leadtime-inventory tradeoffs in assemble-to-order systems. Oper. Res. 46 858-871.
-
(1998)
Oper. Res.
, vol.46
, pp. 858-871
-
-
Wang, Y.1
-
13
-
-
0032169180
-
Order response time reliability in a multi-item inventory system
-
Hausman, W.H., H.L. Lee, A.X. Zhang. 1998. Order response time reliability in a multi-item inventory system. Eur. J. Oper. Res. 109 646-659.
-
(1998)
Eur. J. Oper. Res.
, vol.109
, pp. 646-659
-
-
Hausman, W.H.1
Lee, H.L.2
Zhang, A.X.3
-
14
-
-
16744363621
-
Maximally dependent random variables
-
Lai, T., H. Robbins. 1976. Maximally dependent random variables. Proc. National Acad. Sci. 73 286-288.
-
(1976)
Proc. National Acad. Sci.
, vol.73
, pp. 286-288
-
-
Lai, T.1
Robbins, H.2
-
15
-
-
0026923203
-
Tandem queues with planned inventories
-
Lee, Y., P. Zipkin. 1992. Tandem queues with planned inventories. Oper. Res. 40 936-947.
-
(1992)
Oper. Res.
, vol.40
, pp. 936-947
-
-
Lee, Y.1
Zipkin, P.2
-
16
-
-
0024701994
-
Optimal inventory policies for assembly systems under random demands
-
Rosling, K. 1989. Optimal inventory policies for assembly systems under random demands. Oper. Res. 37 565-579.
-
(1989)
Oper. Res.
, vol.37
, pp. 565-579
-
-
Rosling, K.1
-
19
-
-
0000728997
-
Strong stochastic convexity and its applications
-
Shanthikumar, J.G., D.D. Yao. 1991a. Strong stochastic convexity and its applications, J. Appl. Probab. 28 131-145.
-
(1991)
J. Appl. Probab.
, vol.28
, pp. 131-145
-
-
Shanthikumar, J.G.1
Yao, D.D.2
-
20
-
-
0000492685
-
Bivariate characterization of some stochastic order relations
-
_, _. 1991b. Bivariate characterization of some stochastic order relations. Adv. Appl. Probab. 23 642-659.
-
(1991)
Adv. Appl. Probab.
, vol.23
, pp. 642-659
-
-
-
22
-
-
0032201713
-
On the order fill rate in a multi-item, base-stock inventory system
-
Song, J.S. 1998. On the order fill rate in a multi-item, base-stock inventory system. Oper. Res. 46 831-845.
-
(1998)
Oper. Res.
, vol.46
, pp. 831-845
-
-
Song, J.S.1
-
23
-
-
0033700685
-
A note on assemble-to-order systems with batch ordering
-
_. 2000. A note on assemble-to-order systems with batch ordering. Management Sci. 46 739-743.
-
(2000)
Management Sci.
, vol.46
, pp. 739-743
-
-
-
24
-
-
0036541991
-
Order-based backorders and their implications in multi-item inventory systems
-
_. 2002. Order-based backorders and their implications in multi-item inventory systems. Management Sci. 48 499-516.
-
(2002)
Management Sci.
, vol.48
, pp. 499-516
-
-
-
25
-
-
0002779268
-
Order fulfillment performance measures in an assembly-to-order system with stochastic lead-times
-
_, S. Xu, B. Liu. 1999. Order fulfillment performance measures in an assembly-to-order system with stochastic lead-times. Oper. Res. 47 131-149.
-
(1999)
Oper. Res.
, vol.47
, pp. 131-149
-
-
Xu, S.1
Liu, B.2
-
28
-
-
0034186998
-
Majorization of weighted trees: A new tool to study correlated stochastic systems
-
Xu, S.H., H. Li. 2000. Majorization of weighted trees: A new tool to study correlated stochastic systems. Math. Oper. Res. 25 298-323.
-
(2000)
Math. Oper. Res.
, vol.25
, pp. 298-323
-
-
Xu, S.H.1
Li, H.2
-
29
-
-
0000301836
-
Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands
-
Zhang, A.X. 1997. Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demands. Production Oper. Management 6 309-324.
-
(1997)
Production Oper. Management
, vol.6
, pp. 309-324
-
-
Zhang, A.X.1
|