메뉴 건너뛰기




Volumn 37, Issue 4, 1999, Pages 809-821

Using an empirical queueing approach to predict future flow times

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; DATABASE SYSTEMS; DECISION SUPPORT SYSTEMS; ITERATIVE METHODS; MATHEMATICAL MODELS; PROCESS ENGINEERING; PRODUCTION CONTROL; QUEUEING THEORY; RESPONSE TIME (COMPUTER SYSTEMS); SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0033297291     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-8352(00)00013-9     Document Type: Article
Times cited : (10)

References (18)
  • 1
    • 0023981636 scopus 로고
    • Empirical evaluation of a queueing network model for semiconductor wafer fabrication
    • Chen H., Harrison J.M., Mandelbaum A., Van Ackere A., Wein L.M. Empirical evaluation of a queueing network model for semiconductor wafer fabrication. Operations Research. 36:(2):1988;202-215.
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 202-215
    • Chen, H.1    Harrison, J.M.2    Mandelbaum, A.3    Van Ackere, A.4    Wein, L.M.5
  • 8
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • Hung Y.-F., Leachman R.C. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Transactions on Semiconductor Manufacturing. 9:(2):1996;257-269.
    • (1996) IEEE Transactions on Semiconductor Manufacturing , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.-F.1    Leachman, R.C.2
  • 9
    • 0027842088 scopus 로고
    • Practical issues in scheduling and dispatching in semiconductor wafer fabrication
    • Johri P.K. Practical issues in scheduling and dispatching in semiconductor wafer fabrication. Journal of Manufacturing Systems. 12:(6):1993;474-485.
    • (1993) Journal of Manufacturing Systems , vol.12 , Issue.6 , pp. 474-485
    • Johri, P.K.1
  • 11
    • 0001829813 scopus 로고
    • Modeling technique for automated production planning in the semiconductor industry
    • T.A. Ciriani, & R.C. Leachman. England: Wiley
    • Leachman R.C. Modeling technique for automated production planning in the semiconductor industry. Ciriani T.A., Leachman R.C. Optimization in industry. 1993;1-30 Wiley, England.
    • (1993) Optimization in Industry , pp. 1-30
    • Leachman, R.C.1
  • 12
    • 0013367503 scopus 로고    scopus 로고
    • IMPReSS: An automated production-planning and delivery-quotation system at Harris corporation - Semiconductor sector
    • Leachman RC, Benson RF, Liu C, Raar DJ. IMPReSS: an automated production-planning and delivery-quotation system at Harris corporation - semiconductor sector. Interface 1996;26(1):6-37.
    • (1996) Interface , vol.26 , Issue.1 , pp. 6-37
    • Leachman, R.C.1    Benson, R.F.2    Liu, C.3    Raar, D.J.4
  • 15
    • 0028481114 scopus 로고
    • Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants
    • Lu S.C.H., Ramaswamy D., Kumar P.R. Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants. IEEE Transactions on Semiconductor Manufacturing. 7:(3):1994;374-388.
    • (1994) IEEE Transactions on Semiconductor Manufacturing , vol.7 , Issue.3 , pp. 374-388
    • Lu, S.C.H.1    Ramaswamy, D.2    Kumar, P.R.3
  • 17
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
    • Uzsoy R., Lee C.Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry. Part I: system characteristics, performance evaluation and production planning. IIE Transactions. 24:(4):1992;47-60.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 18
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part II: Shop-floor control
    • Uzsoy R., Lee C.Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry. Part II: shop-floor control. IIE Transactions. 26:(5):1994;44-55.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.