-
1
-
-
21844513640
-
Operations Planning Issues in an Assembly/Disassembly Environment
-
Brennan L., Gupta S. M. and Taleb K. N., "Operations Planning Issues in an Assembly/Disassembly Environment", International Journal of Operations and Production Management, Vol. 14, No. 9, 57-67, 1994.
-
(1994)
International Journal of Operations and Production Management
, vol.14
, Issue.9
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
2
-
-
0035837942
-
A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures
-
Gungor A. and Gupta S. M., "A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures", International Journal of Production Research, Vol. 39, No. 7, 1427-1467, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
3
-
-
0037143030
-
Disassembly Line in Product Recovery
-
Gungor A. and Gupta S. M., "Disassembly Line in Product Recovery", International Journal of Production Research, Vol. 40, No. 11, 2569-2589, 2002.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.11
, pp. 2569-2589
-
-
Gungor, A.1
Gupta, S.M.2
-
4
-
-
0033358107
-
Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey
-
Gungor A. and Gupta S. M., "Issues in Environmentally Conscious Manufacturing and Product Recovery: A Survey", Computer and Industrial Engineering, Vol. 36, No. 4, 811-853, 1999.
-
(1999)
Computer and Industrial Engineering
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
5
-
-
0032089489
-
Adapting Just-In-Time Manufacturing Systems to Preventive Maintenance Interrupts
-
Gupta S. M. and Al-Turki Y. A. Y., "Adapting Just-In-Time Manufacturing Systems to Preventive Maintenance Interrupts". Production Planning and Control, Vol. 9, No. 4, 349-359, 1998.
-
(1998)
Production Planning and Control
, vol.9
, Issue.4
, pp. 349-359
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
6
-
-
0031103287
-
An Algorithm to Dynamically Adjust the Number of Kanbans in a Stochastic Processing Times and Variable Demand Environment
-
Gupta S. M. and Al-Turki Y. A. Y., "An Algorithm to Dynamically Adjust the Number of Kanbans in a Stochastic Processing Times and Variable Demand Environment", Production Planning and Control, Vol. 8, No. 2, 133-141, 1997.
-
(1997)
Production Planning and Control
, vol.8
, Issue.2
, pp. 133-141
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
7
-
-
0032122862
-
The Effect of Sudden Material Handling System Breakdown on the Performance of a JIT System
-
Gupta S. M. and Al-Turki Y. A. Y., "The Effect of Sudden Material Handling System Breakdown on the Performance of a JIT System", International Journal of Production Research, Vol. 36, No. 7, 1935-1960, 1998.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.7
, pp. 1935-1960
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
-
8
-
-
3543124095
-
Flexible Kanban System
-
Gupta S. M., Al-Turki Y. A. Y. and Perry R. F., "Flexible Kanban System", International Journal of Operations and Production Management, vol. 19, No. 10, 1065-1093, 1999.
-
(1999)
International Journal of Operations and Production Management
, vol.19
, Issue.10
, pp. 1065-1093
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
Perry, R.F.3
-
11
-
-
0004177242
-
-
WCB, McGraw-Hill, New York
-
Kelton D. W., Sadowski R. P. and Sadowski, D. A., "Simulation with Arena®", WCB, McGraw-Hill, New York, 1998.
-
(1998)
Simulation with Arena®
-
-
Kelton, D.W.1
Sadowski, R.P.2
Sadowski, D.A.3
-
12
-
-
0035766557
-
Adaptive Kanban Control Mechanism for a Single Stage Hybrid System
-
Newton, Massachusetts, October 28-29, pp
-
Korugan, A. and Gupta, S. M., "Adaptive Kanban Control Mechanism for a Single Stage Hybrid System", Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing II, Newton, Massachusetts, October 28-29, pp. 175-182, 2001.
-
(2001)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing
, vol.2
, pp. 175-182
-
-
Korugan, A.1
Gupta, S.M.2
-
13
-
-
0036721661
-
Determine Optimum Disassembly Sequences in Electronic Equipment
-
Lambert A. J. D., "Determine Optimum Disassembly Sequences in Electronic Equipment", Computer and Industrial Engineering, Vol. 43, 553-575, 2002.
-
(2002)
Computer and Industrial Engineering
, vol.43
, pp. 553-575
-
-
Lambert, A.J.D.1
-
14
-
-
0038156629
-
Disassembly Sequencing: A Survey
-
Lambert A. J. D., "Disassembly Sequencing: A Survey", International Journal of Production Research, Vol. 41, No. 16, 3721-3759, 2003.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.16
, pp. 3721-3759
-
-
Lambert, A.J.D.1
-
15
-
-
29344464281
-
-
CRC Press, Boca Raton, Florida, ISBN: 1-57444-334-8
-
Lambert, A. J. D. and Gupta, S. M., Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling, CRC Press, Boca Raton, Florida, ISBN: 1-57444-334-8, 2005.
-
(2005)
Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
16
-
-
0242492016
-
Greedy Algorithm for Disassembly Line Scheduling
-
Man, and Cybernetics, Washington, DC, October 5-8, pp
-
McGovern S. M. and Gupta S. M., "Greedy Algorithm for Disassembly Line Scheduling", Proceedings of the 2003 IEEE International Conference on Systems, Man, and Cybernetics, Washington, DC, October 5-8, pp. 1737-1744, 2003.
-
(2003)
Proceedings of the 2003 IEEE International Conference on Systems
, pp. 1737-1744
-
-
McGovern, S.M.1
Gupta, S.M.2
-
17
-
-
0034828875
-
A Systematic Approach to Disassembly Line Design
-
Denver, Colorado, May 7-9, pp
-
Tang Y., Zhou M. and Caudill R., "A Systematic Approach to Disassembly Line Design", Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment, Denver, Colorado, May 7-9, pp. 173-178, 2001.
-
(2001)
Proceedings of the 2001 IEEE International Symposium on Electronics and the Environment
, pp. 173-178
-
-
Tang, Y.1
Zhou, M.2
Caudill, R.3
-
18
-
-
1642381827
-
Differences between Forward and Reverse Logistics in a Retail Environment
-
Tibben-Lembke R. S. and Rogers D. S., "Differences between Forward and Reverse Logistics in a Retail Environment", Supply Chain Management, Vol. 7, No. 5, 271-282, 2002.
-
(2002)
Supply Chain Management
, vol.7
, Issue.5
, pp. 271-282
-
-
Tibben-Lembke, R.S.1
Rogers, D.S.2
-
19
-
-
33644632380
-
Multi-Kanban Mechanism for Appliance Disassembly
-
5997, pp
-
Udomsawat, G. and Gupta, S. M., "Multi-Kanban Mechanism for Appliance Disassembly", Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing V, Vol. 5997, pp. 30-41, 2005.
-
(2005)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing
, vol.5
, pp. 30-41
-
-
Udomsawat, G.1
Gupta, S.M.2
|