메뉴 건너뛰기




Volumn 37, Issue 4, 1996, Pages 19-24

A practical application of a multi-project scheduling heuristic

Author keywords

[No Author keywords available]

Indexed keywords

GARMENT MANUFACTURE; HEURISTIC METHODS; PRODUCTION CONTROL; PRODUCTIVITY; SCHEDULING;

EID: 0030414507     PISSN: 08978336     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (13)
  • 2
    • 0015725454 scopus 로고
    • Project Scheduling under Resource Constraints: Historical Review and Categorization of Procedures
    • Davis, E. W. "Project Scheduling Under Resource Constraints: Historical Review and Categorization of Procedures." AIIE Transactions 5, no. 4 (1973): 297-313.
    • (1973) AIIE Transactions , vol.5 , Issue.4 , pp. 297-313
    • Davis, E.W.1
  • 3
    • 0000813734 scopus 로고
    • Optimal Project Scheduling under Multiple Resource Constraints
    • _, and G. E. Heidorn. "Optimal Project Scheduling Under Multiple Resource Constraints." Management Science 17, no. 21 (1971): 803-816.
    • (1971) Management Science , vol.17 , Issue.21 , pp. 803-816
    • Heidorn, G.E.1
  • 4
    • 0023824517 scopus 로고
    • Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
    • Dumond, J., and V. Mabert. "Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis." Management Science 34, no. 1 (1988): 101-118.
    • (1988) Management Science , vol.34 , Issue.1 , pp. 101-118
    • Dumond, J.1    Mabert, V.2
  • 5
    • 0011717163 scopus 로고
    • Toward the Development of a Complete Multi-Project Scheduling System
    • Fendley, L. G. "Toward the Development of a Complete Multi-Project Scheduling System." Journal of Industrial Engineering 19, no. 10 (1968): 505-515.
    • (1968) Journal of Industrial Engineering , vol.19 , Issue.10 , pp. 505-515
    • Fendley, L.G.1
  • 6
    • 0024876781 scopus 로고
    • Heuristic Framework for the Resource Constrained Multi-Project Scheduling Problem
    • Kim, S., and M. Schniederjans. "Heuristic Framework for the Resource Constrained Multi-Project Scheduling Problem." Computers and Operations Research 16, no. 6 (1989): 541-556.
    • (1989) Computers and Operations Research , vol.16 , Issue.6 , pp. 541-556
    • Kim, S.1    Schniederjans, M.2
  • 7
    • 0020087944 scopus 로고
    • Multi-Project Scheduling: Categorization of Heuristic Rules Performance
    • Kurtulus, I, and E. W. Davis. "Multi-Project Scheduling: Categorization of Heuristic Rules Performance," Management Science 28, no. 2, (1982): 161-172.
    • (1982) Management Science , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.1    Davis, E.W.2
  • 8
    • 0022025928 scopus 로고
    • Multi-Project Scheduling: Analysis of Project Performance
    • Kurtulus, I. S., and S. C. Narula. "Multi-Project Scheduling: Analysis of Project Performance." IIE Transactions 17, no. 1 (1985): 58-65.
    • (1985) IIE Transactions , vol.17 , Issue.1 , pp. 58-65
    • Kurtulus, I.S.1    Narula, S.C.2
  • 9
    • 0015742216 scopus 로고
    • Alternative Methods of Project Scheduling with Limited Resources
    • Patterson, J. H. "Alternative Methods of Project Scheduling with Limited Resources." Naval Research Logistics Quarterly 20, no. 4 (1973): 767-784.
    • (1973) Naval Research Logistics Quarterly , vol.20 , Issue.4 , pp. 767-784
    • Patterson, J.H.1
  • 10
    • 0021460636 scopus 로고
    • A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
    • _. "A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem." Management Science 30, no. 7 (1984): 854-867.
    • (1984) Management Science , vol.30 , Issue.7 , pp. 854-867
  • 11
    • 0018011301 scopus 로고
    • Multiple Resource-Constrained Scheduling Using Branch and Bound
    • Srinson, J. P., E. W. Davis, and B. M. Khumawala. "Multiple Resource-Constrained Scheduling Using Branch and Bound." AIIE Transactions 10, no. 3 (1978): 252-259.
    • (1978) AIIE Transactions , vol.10 , Issue.3 , pp. 252-259
    • Srinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 12
    • 0017997005 scopus 로고
    • An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
    • Talbot, F. B., and J. H. Patterson. "An Efficient Integer Programming Algorithm With Network Cuts for Solving Resource-Constrained Scheduling Problems." Management Science 24, no. 11 (1978): 1163-1174.
    • (1978) Management Science , vol.24 , Issue.11 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2
  • 13
    • 0025701908 scopus 로고
    • A Heuristic for Multi-Project Scheduling with Limited Resources in the Housing Industry
    • Tsubakitani, S., and R. F. Deckro. "A Heuristic for Multi-Project Scheduling with Limited Resources in the Housing Industry." European Journal of Operational Research 49 (1990): 80-91.
    • (1990) European Journal of Operational Research , vol.49 , pp. 80-91
    • Tsubakitani, S.1    Deckro, R.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.