메뉴 건너뛰기




Volumn 37, Issue 6, 1999, Pages 1427-1435

Part dispatching and machine loading in flexible manufacturing systems using central queues

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; FAILURE ANALYSIS; INVENTORY CONTROL; MACHINING; PROCESS CONTROL; PRODUCTION CONTROL; QUEUEING THEORY; SCHEDULING; STRATEGIC PLANNING;

EID: 0032641794     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499191337     Document Type: Article
Times cited : (12)

References (17)
  • 1
    • 0024133022 scopus 로고
    • The part mix and routing mix problem in FMS: A coupling between a LP model and a closed queuing network
    • Avonts, L. H. and van Wassenhove, L. N., 1988, The part mix and routing mix problem in FMS: a coupling between a LP model and a closed queuing network. International Journal of Production Research, 26, 1891-1902.
    • (1988) International Journal of Production Research , vol.26 , pp. 1891-1902
    • Avonts, L.H.1    Van Wassenhove, L.N.2
  • 5
    • 0026254174 scopus 로고
    • Effects of loading and routing decisions on performance of flexible manufacturing systems
    • Chen, I. J. and Chung, C. H., 1991, Effects of loading and routing decisions on performance of flexible manufacturing systems. International Journal of Production Research, 29, 2209-2225.
    • (1991) International Journal of Production Research , vol.29 , pp. 2209-2225
    • Chen, I.J.1    Chung, C.H.2
  • 6
    • 0027675841 scopus 로고
    • Investigation into the impact of flexibility on manufacturing performance
    • Das, S. K. and Nagendra, P., 1993, Investigation into the impact of flexibility on manufacturing performance. International Journal of Production Research, 31, 2337-2354.
    • (1993) International Journal of Production Research , vol.31 , pp. 2337-2354
    • Das, S.K.1    Nagendra, P.2
  • 13
    • 0024673761 scopus 로고
    • The periodic routing of a flexible manufacturing system with centralised inprocess inventory flow
    • Liu, J. J., 1989, The periodic routing of a flexible manufacturing system with centralised inprocess inventory flow. International Journal of Production Research, 27, 943-951.
    • (1989) International Journal of Production Research , vol.27 , pp. 943-951
    • Liu, J.J.1
  • 14
    • 0025485232 scopus 로고
    • An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell
    • Mahmoodi, F., Dooley, K. J. and Starr, P. J., 1990, An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell. International Journal of Production Research, 28, 1695-1711.
    • (1990) International Journal of Production Research , vol.28 , pp. 1695-1711
    • Mahmoodi, F.1    Dooley, K.J.2    Starr, P.J.3
  • 15
    • 0022060472 scopus 로고
    • A loading and dispatching problem in a random flexible manufacturing system
    • Shanker, K. and Tzen, Y. J., 1985, A loading and dispatching problem in a random flexible manufacturing system, International Journal of Production Research, 23, 579-595.
    • (1985) International Journal of Production Research , vol.23 , pp. 579-595
    • Shanker, K.1    Tzen, Y.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.