메뉴 건너뛰기




Volumn 34, Issue 7, 2002, Pages 601-612

Intelligent agent modeling of an industrial warehousing problem

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; HIERARCHICAL SYSTEMS; INDUSTRIAL PLANTS; PROBLEM SOLVING; SCHEDULING; WAREHOUSES;

EID: 0036643293     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1014547520852     Document Type: Article
Times cited : (62)

References (27)
  • 2
    • 0003960789 scopus 로고
    • Manufacturing control with a market-driven contract net
    • Ph.D. thesis, Rensselaer Polytechnic Institute, Troy, New York
    • (1991)
    • Baker, A.D.1
  • 11
    • 0003502925 scopus 로고    scopus 로고
    • EtoPlan: A concept for concurrent manufacturing planning and control - Building holarchies for manufacture-to-order environments
    • Ph.D. thesis, University of Twente, Netherlands
    • (2000)
    • Giebels, M.M.T.1
  • 13
    • 85023863029 scopus 로고    scopus 로고
    • Holonic/intelligent agent based framework for manufacturing systems control
    • DSES Technical Report No. 38-00-480, Rensselaer Polytechnic Institute, Troy, NY
    • (2000)
    • Heragu, S.S.1    Graves, R.J.2    Kim, B.3    St. Onge, A.4
  • 17
    • 0003965725 scopus 로고    scopus 로고
    • A hybrid scheduling and control system architecture for warehouse management
    • DSES Technical Report No. 38-01-484, Rensselaer Polytechnic Institute, Troy, NY
    • (2001)
    • Kim, B.1    Heragu, S.S.2    Graves, R.J.3    St. Onge, A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.