메뉴 건너뛰기




Volumn 35, Issue 3-4, 1998, Pages 439-442

Multi-objective scheduling with fuzzy due-date

Author keywords

Fuzzy due date; Fuzzy flowshop scheduling problem; Multi objective scheduling problem

Indexed keywords

COMPUTER SIMULATION; FUZZY SETS; MEMBERSHIP FUNCTIONS; PROBLEM SOLVING; PROCESS CONTROL; SCHEDULING;

EID: 0032306052     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-8352(98)00128-4     Document Type: Article
Times cited : (25)

References (6)
  • 3
    • 0028523480 scopus 로고
    • Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems
    • Ishibuchi, H., N.Yamamoto, T.Murata and H.Tanaka. Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets and Systems, 67, 1, 81-100 (1994).
    • (1994) Fuzzy Sets and Systems , vol.67 , Issue.1 , pp. 81-100
    • Ishibuchi, H.1    Yamamoto, N.2    Murata, T.3    Tanaka, H.4
  • 5
    • 0030675347 scopus 로고    scopus 로고
    • Reformulation of various non-fuzzy scheduling problems using the concept of fuzzy due-date
    • Murata, T., H.Ishibuchi and K.-H.Lee. Reformulation of various non-fuzzy scheduling problems using the concept of fuzzy due-date. Proc. 6th FUZZ-IEEE, 447-452 (1997).
    • (1997) Proc. 6th FUZZ-IEEE , pp. 447-452
    • Murata, T.1    Ishibuchi, H.2    Lee, K.-H.3
  • 6
    • 0029254827 scopus 로고
    • Multiple and bicriteria scheduling: A literature survey
    • Nagar, A., J.Haddock and S.Heragu. Multiple and bicriteria scheduling: A literature survey. European J. Opr. Research, 81, 88-104 (1995).
    • (1995) European J. Opr. Research , vol.81 , pp. 88-104
    • Nagar, A.1    Haddock, J.2    Heragu, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.