-
1
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing
-
Akçali, E., Nemoto, K., Uzsoy, R.: Cycle-Time Improvements for Photolithography Process in Semiconductor Manufacturing. IEEE Transactions on Semiconductor Manufacturing. 14(1) (2001) 48-56.
-
(2001)
IEEE Transactions on Semiconductor Manufacturing
, vol.14
, Issue.1
, pp. 48-56
-
-
Akçali, E.1
Nemoto, K.2
Uzsoy, R.3
-
2
-
-
0033338820
-
Constraint satisfaction problems: Algorithms and applications
-
Brailsford, S.C., Potts, C.N., Smith, B.M.: Constraint Satisfaction Problems: Algorithms and Applications, European Journal of Operational Research. 119(3) (1999) 557-581.
-
(1999)
European Journal of Operational Research
, vol.119
, Issue.3
, pp. 557-581
-
-
Brailsford, S.C.1
Potts, C.N.2
Smith, B.M.3
-
3
-
-
33745929420
-
Capacity allocation model for photolithography workstation with the constraints of process window and machine dedication
-
Accepted
-
Chung, S.H., Huang, C.Y., Lee, A.H.I.: Capacity Allocation Model for Photolithography Workstation with the Constraints of Process Window and Machine Dedication. Production Planning and Control. Accepted. (2006).
-
(2006)
Production Planning and Control
-
-
Chung, S.H.1
Huang, C.Y.2
Lee, A.H.I.3
-
5
-
-
0036468754
-
Hybrid capacity modeling for alternative machine types in linear programming production planning
-
Hung, Y.F., Cheng, G.J.: Hybrid Capacity Modeling for Alternative Machine Types in Linear Programming Production Planning. IIE Transactions. 34(2) (2002) 157-165.
-
(2002)
IIE Transactions
, vol.34
, Issue.2
, pp. 157-165
-
-
Hung, Y.F.1
Cheng, G.J.2
-
6
-
-
33745879211
-
-
ILOG Inc., France
-
ILOG Inc.: ILOG OPL Studio 3.5. ILOG Inc., France. (2001)
-
(2001)
ILOG OPL Studio 3.5
-
-
-
7
-
-
0036468657
-
Shift scheduling for steppers in the semiconductor wafer fabrication process
-
Kim, S., Yea, S.H., Kim, B.: Shift Scheduling for Steppers in the Semiconductor Wafer Fabrication Process. IIE Transactions. 34(2) (2002) 167-177.
-
(2002)
IIE Transactions
, vol.34
, Issue.2
, pp. 167-177
-
-
Kim, S.1
Yea, S.H.2
Kim, B.3
-
8
-
-
0035421261
-
Optimized operations by extended X-factor theory including unit hours concept
-
Kishimoto, M., Ozawa, K., Watanabe, K., Martin, D.: Optimized Operations by Extended X-Factor Theory Including Unit Hours Concept. IEEE Transactions on Semiconductor Manufacturing. 14(3) (2001) 187-195.
-
(2001)
IEEE Transactions on Semiconductor Manufacturing
, vol.14
, Issue.3
, pp. 187-195
-
-
Kishimoto, M.1
Ozawa, K.2
Watanabe, K.3
Martin, D.4
-
9
-
-
0002549571
-
On capacity modeling for production planning with alternative machine types
-
Leachman, R.C., Carmon, T.F.: On Capacity Modeling for Production Planning with Alternative Machine Types. HE Transactions. 24(4) (1992) 62-72.
-
(1992)
HE Transactions
, vol.24
, Issue.4
, pp. 62-72
-
-
Leachman, R.C.1
Carmon, T.F.2
-
10
-
-
0036468738
-
Experimental study on input and bottleneck scheduling for a semiconductor fabrication line
-
Lee, Y.H., Park, J., Kim, S.: Experimental Study on Input and Bottleneck Scheduling for a Semiconductor Fabrication Line. IIE Transactions. 34(2) (2002) 179-190.
-
(2002)
IIE Transactions
, vol.34
, Issue.2
, pp. 179-190
-
-
Lee, Y.H.1
Park, J.2
Kim, S.3
-
11
-
-
0035565940
-
Program does not equal program: Constraint programming and its relationship to mathematical programming
-
Lustig, I.J., Puget, J.-F.P.: Program Does Not Equal Program: Constraint Programming and Its Relationship to Mathematical Programming. Interfaces. 31(6) (2001) 29-53.
-
(2001)
Interfaces
, vol.31
, Issue.6
, pp. 29-53
-
-
Lustig, I.J.1
Puget, J.-F.P.2
-
12
-
-
0000262471
-
A capacity allocation problem with integer side constraints
-
Toktay, L.B., Uzsoy, R.: A Capacity Allocation Problem with Integer Side Constraints. European Journal of Operational Research. 109(1) (1998) 170-182.
-
(1998)
European Journal of Operational Research
, vol.109
, Issue.1
, pp. 170-182
-
-
Toktay, L.B.1
Uzsoy, R.2
-
13
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry (I): System characteristics, performance evaluation and production planning
-
Uzsoy, R., Lee, C.-Y., Martin-Vega, L.A.: A Review of Production Planning and Scheduling Models in the Semiconductor Industry (I): System Characteristics, Performance Evaluation and Production Planning. IIE Transactions. 24(4) (1992) 47-60.
-
(1992)
IIE Transactions
, vol.24
, Issue.4
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
14
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry (II): Shop-floor control
-
Uzsoy, R., Lee, C.-Y., Martin-Vega, L.A.: A Review of Production Planning and Scheduling Models in the Semiconductor Industry (II): Shop-Floor Control. IIE Transactions. 26(5) (1994) 44-55.
-
(1994)
IIE Transactions
, vol.26
, Issue.5
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
|