메뉴 건너뛰기




Volumn 3982 LNCS, Issue , 2006, Pages 610-620

Using constraint satisfaction approach to solve the capacity allocation problem for photolithography area

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; MATHEMATICAL MODELS; PHOTOLITHOGRAPHY; PROBLEM SOLVING; SEARCH ENGINES;

EID: 33745877613     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/11751595_65     Document Type: Conference Paper
Times cited : (4)

References (14)
  • 1
    • 0035248367 scopus 로고    scopus 로고
    • Cycle-time improvements for photolithography process in semiconductor manufacturing
    • Akçali, E., Nemoto, K., Uzsoy, R.: Cycle-Time Improvements for Photolithography Process in Semiconductor Manufacturing. IEEE Transactions on Semiconductor Manufacturing. 14(1) (2001) 48-56.
    • (2001) IEEE Transactions on Semiconductor Manufacturing , vol.14 , Issue.1 , pp. 48-56
    • Akçali, E.1    Nemoto, K.2    Uzsoy, R.3
  • 3
    • 33745929420 scopus 로고    scopus 로고
    • Capacity allocation model for photolithography workstation with the constraints of process window and machine dedication
    • Accepted
    • Chung, S.H., Huang, C.Y., Lee, A.H.I.: Capacity Allocation Model for Photolithography Workstation with the Constraints of Process Window and Machine Dedication. Production Planning and Control. Accepted. (2006).
    • (2006) Production Planning and Control
    • Chung, S.H.1    Huang, C.Y.2    Lee, A.H.I.3
  • 5
    • 0036468754 scopus 로고    scopus 로고
    • Hybrid capacity modeling for alternative machine types in linear programming production planning
    • Hung, Y.F., Cheng, G.J.: Hybrid Capacity Modeling for Alternative Machine Types in Linear Programming Production Planning. IIE Transactions. 34(2) (2002) 157-165.
    • (2002) IIE Transactions , vol.34 , Issue.2 , pp. 157-165
    • Hung, Y.F.1    Cheng, G.J.2
  • 6
    • 33745879211 scopus 로고    scopus 로고
    • ILOG Inc., France
    • ILOG Inc.: ILOG OPL Studio 3.5. ILOG Inc., France. (2001)
    • (2001) ILOG OPL Studio 3.5
  • 7
    • 0036468657 scopus 로고    scopus 로고
    • Shift scheduling for steppers in the semiconductor wafer fabrication process
    • Kim, S., Yea, S.H., Kim, B.: Shift Scheduling for Steppers in the Semiconductor Wafer Fabrication Process. IIE Transactions. 34(2) (2002) 167-177.
    • (2002) IIE Transactions , vol.34 , Issue.2 , pp. 167-177
    • Kim, S.1    Yea, S.H.2    Kim, B.3
  • 9
    • 0002549571 scopus 로고
    • On capacity modeling for production planning with alternative machine types
    • Leachman, R.C., Carmon, T.F.: On Capacity Modeling for Production Planning with Alternative Machine Types. HE Transactions. 24(4) (1992) 62-72.
    • (1992) HE Transactions , vol.24 , Issue.4 , pp. 62-72
    • Leachman, R.C.1    Carmon, T.F.2
  • 10
    • 0036468738 scopus 로고    scopus 로고
    • Experimental study on input and bottleneck scheduling for a semiconductor fabrication line
    • Lee, Y.H., Park, J., Kim, S.: Experimental Study on Input and Bottleneck Scheduling for a Semiconductor Fabrication Line. IIE Transactions. 34(2) (2002) 179-190.
    • (2002) IIE Transactions , vol.34 , Issue.2 , pp. 179-190
    • Lee, Y.H.1    Park, J.2    Kim, S.3
  • 11
    • 0035565940 scopus 로고    scopus 로고
    • Program does not equal program: Constraint programming and its relationship to mathematical programming
    • Lustig, I.J., Puget, J.-F.P.: Program Does Not Equal Program: Constraint Programming and Its Relationship to Mathematical Programming. Interfaces. 31(6) (2001) 29-53.
    • (2001) Interfaces , vol.31 , Issue.6 , pp. 29-53
    • Lustig, I.J.1    Puget, J.-F.P.2
  • 12
    • 0000262471 scopus 로고    scopus 로고
    • A capacity allocation problem with integer side constraints
    • Toktay, L.B., Uzsoy, R.: A Capacity Allocation Problem with Integer Side Constraints. European Journal of Operational Research. 109(1) (1998) 170-182.
    • (1998) European Journal of Operational Research , vol.109 , Issue.1 , pp. 170-182
    • Toktay, L.B.1    Uzsoy, R.2
  • 13
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry (I): System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.-Y., Martin-Vega, L.A.: A Review of Production Planning and Scheduling Models in the Semiconductor Industry (I): System Characteristics, Performance Evaluation and Production Planning. IIE Transactions. 24(4) (1992) 47-60.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 14
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry (II): Shop-floor control
    • Uzsoy, R., Lee, C.-Y., Martin-Vega, L.A.: A Review of Production Planning and Scheduling Models in the Semiconductor Industry (II): Shop-Floor Control. IIE Transactions. 26(5) (1994) 44-55.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.