메뉴 건너뛰기




Volumn 44, Issue 17, 2006, Pages 3509-3531

Modified drum-buffer-rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation

Author keywords

Drum buffer rope (DBR); Finite capacity scheduling; Flow shop scheduling; Non identical parallel machine; Theory of constraint

Indexed keywords

CONSTRAINT THEORY; OPERATIONS RESEARCH; PLANT LAYOUT; PROCESS CONTROL; SCHEDULING;

EID: 33745117286     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600584805     Document Type: Article
Times cited : (22)

References (33)
  • 2
    • 0036610796 scopus 로고    scopus 로고
    • Designing unbalanced lines - Understanding protective capacity and protective inventory
    • Blackstone Jr, J.H. and Cox, J.F., Designing unbalanced lines - understanding protective capacity and protective inventory. Prod. Plan. Control, 2002, 13, 416-423.
    • (2002) Prod. Plan. Control , vol.13 , pp. 416-423
    • Blackstone Jr., J.H.1    Cox, J.F.2
  • 3
    • 0033906893 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
    • Botta-Genoulaz, V., Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. Int. J. Prod. Econ., 2000, 64, 1-3.
    • (2000) Int. J. Prod. Econ. , vol.64 , pp. 1-3
    • Botta-Genoulaz, V.1
  • 4
    • 0033078202 scopus 로고    scopus 로고
    • Heuristics for scheduling in a flow shop with multi processors
    • Brah, S.A. and Loo, L.L., Heuristics for scheduling in a flow shop with multi processors. Eur. J. Oper. Res., 1999, 113, 113-122.
    • (1999) Eur. J. Oper. Res. , vol.113 , pp. 113-122
    • Brah, S.A.1    Loo, L.L.2
  • 5
    • 0041917736 scopus 로고    scopus 로고
    • An evaluation of the DBR control mechanism in a job shop environment
    • Chakravorty, S.S., An evaluation of the DBR control mechanism in a job shop environment. Omega, 2001, 29, 335-342.
    • (2001) Omega , vol.29 , pp. 335-342
    • Chakravorty, S.S.1
  • 6
    • 0030555416 scopus 로고    scopus 로고
    • A comparative line design approaches for serial production systems
    • Chakravorty, S.S. and Atwater, J.B., A comparative line design approaches for serial production systems. Int. J. Oper. Prod. Manage., 1996, 16, 91-108.
    • (1996) Int. J. Oper. Prod. Manage. , vol.16 , pp. 91-108
    • Chakravorty, S.S.1    Atwater, J.B.2
  • 7
    • 12244312532 scopus 로고    scopus 로고
    • The impact of free goods on the performance of drum-buffer-rope scheduling systems
    • Chakravorty, S.S. and Atwater, J.B., The impact of free goods on the performance of drum-buffer-rope scheduling systems. Int. J. Prod. Econ., 2005, 95, 347-357.
    • (2005) Int. J. Prod. Econ. , vol.95 , pp. 347-357
    • Chakravorty, S.S.1    Atwater, J.B.2
  • 8
    • 0029254603 scopus 로고
    • Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage
    • Chen, B., Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage. J. Oper. Res. Soc., 1995, 46, 234-244.
    • (1995) J. Oper. Res. Soc. , vol.46 , pp. 234-244
    • Chen, B.1
  • 9
    • 0028403388 scopus 로고
    • A simulation comparison of traditional JIT and TOC manufacturing systems in a flow shop with bottlenecks
    • Cook, D.P., A simulation comparison of traditional JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod Invent. Manage. J., 1994, 35, 73-78.
    • (1994) Prod Invent. Manage. J. , vol.35 , pp. 73-78
    • Cook, D.P.1
  • 10
    • 0031556588 scopus 로고    scopus 로고
    • Scheduling with priority dispatching rules and drum-buffer-rope in a recorverable manufacturing system
    • Daniel, V. and Guide Jr, R., Scheduling with priority dispatching rules and drum-buffer-rope in a recorverable manufacturing system. Int. J. Prod. Econ., 1997, 53, 101-116.
    • (1997) Int. J. Prod. Econ. , vol.53 , pp. 101-116
    • Daniel, V.1    Guide Jr., R.2
  • 11
    • 0028196054 scopus 로고
    • Heuristics for scheduling flexible flow lines
    • Ding, F.-Y. and Kittichartphayak, D., Heuristics for scheduling flexible flow lines. Comput. Ind. Eng., 1994, 26, 27-34.
    • (1994) Comput. Ind. Eng. , vol.26 , pp. 27-34
    • Ding, F.-Y.1    Kittichartphayak, D.2
  • 12
    • 0023984547 scopus 로고
    • Computerized shop floor scheduling
    • Goldratt, E.M., Computerized shop floor scheduling. Int. J. Prod. Res., 1988, 26, 443-445.
    • (1988) Int. J. Prod. Res. , vol.26 , pp. 443-445
    • Goldratt, E.M.1
  • 14
    • 0004244246 scopus 로고
    • North River Press: Cronton-on-Hudson, NY
    • Goldratt, E. and Cox, J., The Goal, 1986 (North River Press: Cronton-on-Hudson, NY).
    • (1986) The Goal
    • Goldratt, E.1    Cox, J.2
  • 15
    • 0030129785 scopus 로고    scopus 로고
    • Scheduling using drum-buffer-rope in a remanufacturing environment
    • Guide Jr, V.D.R., Scheduling using drum-buffer-rope in a remanufacturing environment. Int. J. Prod. Res., 1996, 34, 1081-1091.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 1081-1091
    • Guide Jr., V.D.R.1
  • 16
    • 0036722154 scopus 로고    scopus 로고
    • Heuristics for hybrid flow shops with controllable processing times and assignable due dates
    • Gupta, J.N.D., Kruger, K., Lauff, V., Werner, F. and Sotskov, Y.N., Heuristics for hybrid flow shops with controllable processing times and assignable due dates. Comput. Oper. Res., 2002, 29, 1417-1439.
    • (2002) Comput. Oper. Res. , vol.29 , pp. 1417-1439
    • Gupta, J.N.D.1    Kruger, K.2    Lauff, V.3    Werner, F.4    Sotskov, Y.N.5
  • 18
    • 0043043661 scopus 로고    scopus 로고
    • Preemptive scheduling in two-stage multiprocessor flow shop is NP-hard
    • Hoogeveen, J.A., Lenstra, J.K. and Veltman, B., Preemptive scheduling in two-stage multiprocessor flow shop is NP-hard. Eur. J. Oper. Res., 1996, 89, 145-172.
    • (1996) Eur. J. Oper. Res. , vol.89 , pp. 145-172
    • Hoogeveen, J.A.1    Lenstra, J.K.2    Veltman, B.3
  • 19
    • 0345072525 scopus 로고    scopus 로고
    • Inventory and capacity trade-offs in a manufacturing cell
    • Hurley, S.F. and Whybark, D.C., Inventory and capacity trade-offs in a manufacturing cell. Int. J. Prod. Econ., 1999, 59, 203-212.
    • (1999) Int. J. Prod. Econ. , vol.59 , pp. 203-212
    • Hurley, S.F.1    Whybark, D.C.2
  • 20
    • 0002636447 scopus 로고
    • Buffer stock allocation in serial and assembly type of production lines
    • Lambrecht, M. and Segaert, A., Buffer stock allocation in serial and assembly type of production lines. Int. J. Oper. Prod. Manage., 1990, 10, 47-61.
    • (1990) Int. J. Oper. Prod. Manage. , vol.10 , pp. 47-61
    • Lambrecht, M.1    Segaert, A.2
  • 22
    • 0032114853 scopus 로고    scopus 로고
    • A quantitative approach to estimate the size of the time buffer in the theory of constraints
    • Radovilsky, Z.D., A quantitative approach to estimate the size of the time buffer in the theory of constraints. Int. J. Prod. Econ., 1998, 55, 113-119.
    • (1998) Int. J. Prod. Econ. , vol.55 , pp. 113-119
    • Radovilsky, Z.D.1
  • 23
    • 0025657214 scopus 로고
    • Synchronized manufacturing as in OPT: From practice to theory
    • Ronen, B. and Starr, M.K., Synchronized manufacturing as in OPT: from practice to theory. Comput. Ind. Eng., 1990, 18, 585-600.
    • (1990) Comput. Ind. Eng. , vol.18 , pp. 585-600
    • Ronen, B.1    Starr, M.K.2
  • 24
    • 0031100373 scopus 로고    scopus 로고
    • Order review/release and lot splitting in drum-buffer-rope
    • Russell, G.R., Order review/release and lot splitting in drum-buffer-rope. Int. J. Prod. Res., 1997, 35, 827-845.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 827-845
    • Russell, G.R.1
  • 26
    • 0022680737 scopus 로고
    • Some no-wait shops scheduling problems: Complexity aspect
    • Sriskandarajah, C. and Ladet, P., Some no-wait shops scheduling problems: complexity aspect. Eur. J. Oper. Res., 1986, 24, 424-438.
    • (1986) Eur. J. Oper. Res. , vol.24 , pp. 424-438
    • Sriskandarajah, C.1    Ladet, P.2
  • 31
    • 0028530072 scopus 로고
    • Simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing
    • Wu, S., Morris, J. and Gorgon, T.A., Simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing. Comput. Ind. Eng., 1994, 26, 757-764.
    • (1994) Comput. Ind. Eng. , vol.26 , pp. 757-764
    • Wu, S.1    Morris, J.2    Gorgon, T.A.3
  • 32
    • 0024748810 scopus 로고
    • Practical approach to scheduling a multistage, multiprocessor flow-shop problem
    • Yanney, J.D. and Kuo, W., Practical approach to scheduling a multistage, multiprocessor flow-shop problem. Int. J. Prod. Res., 1989, 27, 1733-1742.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1733-1742
    • Yanney, J.D.1    Kuo, W.2
  • 33
    • 4444329378 scopus 로고
    • Application of optimized production technology in a capacity constrained flow shop: A case study in a battery factory
    • Yenradee, P., Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory. Comput. Ind. Eng., 1994, 27, 217-220.
    • (1994) Comput. Ind. Eng. , vol.27 , pp. 217-220
    • Yenradee, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.