-
1
-
-
0027634134
-
-
Adler, L., Fraiman, N., Kobake, E., Pinedo, M., Plotnicoff, J.C. and Wu, T.P., BPSS. Sched. Support Syst. Packag. Ind., 1993, 41, 641-648.
-
(1993)
BPSS. Sched. Support Syst. Packag. Ind.
, vol.41
, pp. 641-648
-
-
Adler, L.1
Fraiman, N.2
Kobake, E.3
Pinedo, M.4
Plotnicoff, J.C.5
Wu, T.P.6
-
2
-
-
0036610796
-
Designing unbalanced lines - Understanding protective capacity and protective inventory
-
Blackstone Jr, J.H. and Cox, J.F., Designing unbalanced lines - understanding protective capacity and protective inventory. Prod. Plan. Control, 2002, 13, 416-423.
-
(2002)
Prod. Plan. Control
, vol.13
, pp. 416-423
-
-
Blackstone Jr., J.H.1
Cox, J.F.2
-
3
-
-
0033906893
-
Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
-
Botta-Genoulaz, V., Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. Int. J. Prod. Econ., 2000, 64, 1-3.
-
(2000)
Int. J. Prod. Econ.
, vol.64
, pp. 1-3
-
-
Botta-Genoulaz, V.1
-
4
-
-
0033078202
-
Heuristics for scheduling in a flow shop with multi processors
-
Brah, S.A. and Loo, L.L., Heuristics for scheduling in a flow shop with multi processors. Eur. J. Oper. Res., 1999, 113, 113-122.
-
(1999)
Eur. J. Oper. Res.
, vol.113
, pp. 113-122
-
-
Brah, S.A.1
Loo, L.L.2
-
5
-
-
0041917736
-
An evaluation of the DBR control mechanism in a job shop environment
-
Chakravorty, S.S., An evaluation of the DBR control mechanism in a job shop environment. Omega, 2001, 29, 335-342.
-
(2001)
Omega
, vol.29
, pp. 335-342
-
-
Chakravorty, S.S.1
-
6
-
-
0030555416
-
A comparative line design approaches for serial production systems
-
Chakravorty, S.S. and Atwater, J.B., A comparative line design approaches for serial production systems. Int. J. Oper. Prod. Manage., 1996, 16, 91-108.
-
(1996)
Int. J. Oper. Prod. Manage.
, vol.16
, pp. 91-108
-
-
Chakravorty, S.S.1
Atwater, J.B.2
-
7
-
-
12244312532
-
The impact of free goods on the performance of drum-buffer-rope scheduling systems
-
Chakravorty, S.S. and Atwater, J.B., The impact of free goods on the performance of drum-buffer-rope scheduling systems. Int. J. Prod. Econ., 2005, 95, 347-357.
-
(2005)
Int. J. Prod. Econ.
, vol.95
, pp. 347-357
-
-
Chakravorty, S.S.1
Atwater, J.B.2
-
8
-
-
0029254603
-
Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage
-
Chen, B., Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage. J. Oper. Res. Soc., 1995, 46, 234-244.
-
(1995)
J. Oper. Res. Soc.
, vol.46
, pp. 234-244
-
-
Chen, B.1
-
9
-
-
0028403388
-
A simulation comparison of traditional JIT and TOC manufacturing systems in a flow shop with bottlenecks
-
Cook, D.P., A simulation comparison of traditional JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod Invent. Manage. J., 1994, 35, 73-78.
-
(1994)
Prod Invent. Manage. J.
, vol.35
, pp. 73-78
-
-
Cook, D.P.1
-
10
-
-
0031556588
-
Scheduling with priority dispatching rules and drum-buffer-rope in a recorverable manufacturing system
-
Daniel, V. and Guide Jr, R., Scheduling with priority dispatching rules and drum-buffer-rope in a recorverable manufacturing system. Int. J. Prod. Econ., 1997, 53, 101-116.
-
(1997)
Int. J. Prod. Econ.
, vol.53
, pp. 101-116
-
-
Daniel, V.1
Guide Jr., R.2
-
11
-
-
0028196054
-
Heuristics for scheduling flexible flow lines
-
Ding, F.-Y. and Kittichartphayak, D., Heuristics for scheduling flexible flow lines. Comput. Ind. Eng., 1994, 26, 27-34.
-
(1994)
Comput. Ind. Eng.
, vol.26
, pp. 27-34
-
-
Ding, F.-Y.1
Kittichartphayak, D.2
-
12
-
-
0023984547
-
Computerized shop floor scheduling
-
Goldratt, E.M., Computerized shop floor scheduling. Int. J. Prod. Res., 1988, 26, 443-445.
-
(1988)
Int. J. Prod. Res.
, vol.26
, pp. 443-445
-
-
Goldratt, E.M.1
-
14
-
-
0004244246
-
-
North River Press: Cronton-on-Hudson, NY
-
Goldratt, E. and Cox, J., The Goal, 1986 (North River Press: Cronton-on-Hudson, NY).
-
(1986)
The Goal
-
-
Goldratt, E.1
Cox, J.2
-
15
-
-
0030129785
-
Scheduling using drum-buffer-rope in a remanufacturing environment
-
Guide Jr, V.D.R., Scheduling using drum-buffer-rope in a remanufacturing environment. Int. J. Prod. Res., 1996, 34, 1081-1091.
-
(1996)
Int. J. Prod. Res.
, vol.34
, pp. 1081-1091
-
-
Guide Jr., V.D.R.1
-
16
-
-
0036722154
-
Heuristics for hybrid flow shops with controllable processing times and assignable due dates
-
Gupta, J.N.D., Kruger, K., Lauff, V., Werner, F. and Sotskov, Y.N., Heuristics for hybrid flow shops with controllable processing times and assignable due dates. Comput. Oper. Res., 2002, 29, 1417-1439.
-
(2002)
Comput. Oper. Res.
, vol.29
, pp. 1417-1439
-
-
Gupta, J.N.D.1
Kruger, K.2
Lauff, V.3
Werner, F.4
Sotskov, Y.N.5
-
18
-
-
0043043661
-
Preemptive scheduling in two-stage multiprocessor flow shop is NP-hard
-
Hoogeveen, J.A., Lenstra, J.K. and Veltman, B., Preemptive scheduling in two-stage multiprocessor flow shop is NP-hard. Eur. J. Oper. Res., 1996, 89, 145-172.
-
(1996)
Eur. J. Oper. Res.
, vol.89
, pp. 145-172
-
-
Hoogeveen, J.A.1
Lenstra, J.K.2
Veltman, B.3
-
19
-
-
0345072525
-
Inventory and capacity trade-offs in a manufacturing cell
-
Hurley, S.F. and Whybark, D.C., Inventory and capacity trade-offs in a manufacturing cell. Int. J. Prod. Econ., 1999, 59, 203-212.
-
(1999)
Int. J. Prod. Econ.
, vol.59
, pp. 203-212
-
-
Hurley, S.F.1
Whybark, D.C.2
-
20
-
-
0002636447
-
Buffer stock allocation in serial and assembly type of production lines
-
Lambrecht, M. and Segaert, A., Buffer stock allocation in serial and assembly type of production lines. Int. J. Oper. Prod. Manage., 1990, 10, 47-61.
-
(1990)
Int. J. Oper. Prod. Manage.
, vol.10
, pp. 47-61
-
-
Lambrecht, M.1
Segaert, A.2
-
22
-
-
0032114853
-
A quantitative approach to estimate the size of the time buffer in the theory of constraints
-
Radovilsky, Z.D., A quantitative approach to estimate the size of the time buffer in the theory of constraints. Int. J. Prod. Econ., 1998, 55, 113-119.
-
(1998)
Int. J. Prod. Econ.
, vol.55
, pp. 113-119
-
-
Radovilsky, Z.D.1
-
23
-
-
0025657214
-
Synchronized manufacturing as in OPT: From practice to theory
-
Ronen, B. and Starr, M.K., Synchronized manufacturing as in OPT: from practice to theory. Comput. Ind. Eng., 1990, 18, 585-600.
-
(1990)
Comput. Ind. Eng.
, vol.18
, pp. 585-600
-
-
Ronen, B.1
Starr, M.K.2
-
24
-
-
0031100373
-
Order review/release and lot splitting in drum-buffer-rope
-
Russell, G.R., Order review/release and lot splitting in drum-buffer-rope. Int. J. Prod. Res., 1997, 35, 827-845.
-
(1997)
Int. J. Prod. Res.
, vol.35
, pp. 827-845
-
-
Russell, G.R.1
-
25
-
-
0025699540
-
Drum-buffer-rope shop floor control
-
Schragenheim, E. and Ronen, B., Drum-buffer-rope shop floor control. Prod. Invent. Manage. J., 1990, 31, 18-22.
-
(1990)
Prod. Invent. Manage. J.
, vol.31
, pp. 18-22
-
-
Schragenheim, E.1
Ronen, B.2
-
26
-
-
0022680737
-
Some no-wait shops scheduling problems: Complexity aspect
-
Sriskandarajah, C. and Ladet, P., Some no-wait shops scheduling problems: complexity aspect. Eur. J. Oper. Res., 1986, 24, 424-438.
-
(1986)
Eur. J. Oper. Res.
, vol.24
, pp. 424-438
-
-
Sriskandarajah, C.1
Ladet, P.2
-
27
-
-
0031200236
-
Minimizing makespan in parallel flowshops
-
Sundararaghavan, P.S., Kunnathur, A.S. and Viswanathan, I., Minimizing makespan in parallel flowshops. J. Oper. Res. Soc., 1997, 48, 834-842.
-
(1997)
J. Oper. Res. Soc.
, vol.48
, pp. 834-842
-
-
Sundararaghavan, P.S.1
Kunnathur, A.S.2
Viswanathan, I.3
-
30
-
-
0003492414
-
-
Spectrum: Guilford, CT
-
Umble, M.M. and Srikanth, M.L., Synchronous Manufacturing, Principles for World Class Manufacturing, 1996 (Spectrum: Guilford, CT).
-
(1996)
Synchronous Manufacturing, Principles for World Class Manufacturing
-
-
Umble, M.M.1
Srikanth, M.L.2
-
31
-
-
0028530072
-
Simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing
-
Wu, S., Morris, J. and Gorgon, T.A., Simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing. Comput. Ind. Eng., 1994, 26, 757-764.
-
(1994)
Comput. Ind. Eng.
, vol.26
, pp. 757-764
-
-
Wu, S.1
Morris, J.2
Gorgon, T.A.3
-
32
-
-
0024748810
-
Practical approach to scheduling a multistage, multiprocessor flow-shop problem
-
Yanney, J.D. and Kuo, W., Practical approach to scheduling a multistage, multiprocessor flow-shop problem. Int. J. Prod. Res., 1989, 27, 1733-1742.
-
(1989)
Int. J. Prod. Res.
, vol.27
, pp. 1733-1742
-
-
Yanney, J.D.1
Kuo, W.2
-
33
-
-
4444329378
-
Application of optimized production technology in a capacity constrained flow shop: A case study in a battery factory
-
Yenradee, P., Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory. Comput. Ind. Eng., 1994, 27, 217-220.
-
(1994)
Comput. Ind. Eng.
, vol.27
, pp. 217-220
-
-
Yenradee, P.1
|