Volumn 103, Issue 1, 2006, Pages 230-245

An algorithm for minimizing weighted earliness penalty in assembly job shops

Author keywords

Components; Earliness; Job shop; Penalty; Subassembly; Tardiness

Indexed keywords

ALGORITHMS; COMPONENTS; COMPUTATION THEORY; OPTIMIZATION; PROBLEM SOLVING; PRODUCT DESIGN;

EID: 33744990802     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.08.002     Document Type: Article
Times cited : (30)

References (22)
  • 1
    • 0027814043 scopus 로고
    • An evaluation for allocating components to kits in small lot, multi-echelon assembly systems
    • Chen J.F., and Wilhelm W.E. An evaluation for allocating components to kits in small lot, multi-echelon assembly systems. International Journal of Production Research 31 12 (1993) 2835-2856
    • (1993) International Journal of Production Research , vol.31 , Issue.12 , pp. 2835-2856
    • Chen, J.F.1    Wilhelm, W.E.2
  • 2
    • 84989672523 scopus 로고
    • Optimizing the allocating of components to kits in small lot, multi-echelon assembly systems
    • Chen J.F., and Wilhelm W.E. Optimizing the allocating of components to kits in small lot, multi-echelon assembly systems. Naval Research Logistics 41 (1994) 229-256
    • (1994) Naval Research Logistics , vol.41 , pp. 229-256
    • Chen, J.F.1    Wilhelm, W.E.2
  • 4
    • 33745006040 scopus 로고    scopus 로고
    • Framinan, J.M., Leisten, R., in press. A Heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness. International Journal of Production Economics, Corrected proof, available online 25 January 2005.
  • 6
    • 0037063279 scopus 로고    scopus 로고
    • Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products
    • Hicks C., Pongcharoen P., Braiden P.M., and Stewardson D.J. Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products. International Journal of Production Economics 78 3 (2002) 311-322
    • (2002) International Journal of Production Economics , vol.78 , Issue.3 , pp. 311-322
    • Hicks, C.1    Pongcharoen, P.2    Braiden, P.M.3    Stewardson, D.J.4
  • 9
    • 33745004689 scopus 로고    scopus 로고
    • McKoy, D.C., 1995. Minimizing production flow time in a process and assembly job shop. Ph.D. Thesis, Department of Industrial and Manufacturing Engineering, Pennsylvania State University, University Park, Pennsylvania, USA.
  • 10
    • 0032142734 scopus 로고    scopus 로고
    • Minimizing production flow time in a process and assembly job shop
    • McKoy D.C., and Egbelu P.J. Minimizing production flow time in a process and assembly job shop. International Journal of Production Research 36 8 (1998) 2315-2332
    • (1998) International Journal of Production Research , vol.36 , Issue.8 , pp. 2315-2332
    • McKoy, D.C.1    Egbelu, P.J.2
  • 11
    • 0032785177 scopus 로고    scopus 로고
    • Production scheduling in a process and assembly job shop
    • McKoy D.C., and Egbelu P.J. Production scheduling in a process and assembly job shop. Production Planning and Control 10 1 (1999) 76-86
    • (1999) Production Planning and Control , vol.10 , Issue.1 , pp. 76-86
    • McKoy, D.C.1    Egbelu, P.J.2
  • 12
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • Ow P.S., and Morton T.E. The single machine early/tardy problem. Management Science 35 2 (1989) 177-191
    • (1989) Management Science , vol.35 , Issue.2 , pp. 177-191
    • Ow, P.S.1    Morton, T.E.2
  • 13
    • 33744983389 scopus 로고    scopus 로고
    • Pathumnakul, S., 2000. Scheduling based on earliness and tardiness criteria in assembly job shops. Ph.D. Thesis, Department of Industrial and Manufacturing Systems Engineering, Iowa State University, Ames, Iowa, USA.
  • 14
    • 33745005803 scopus 로고    scopus 로고
    • Ramachandra, G., Elmaghraby, S.E., in press. Sequencing precedence-related jobs on two machines to minimize the weighted completion time. International Journal of Production Economics, Corrected proof, available online 2 February 2005.
  • 17
    • 0037464639 scopus 로고    scopus 로고
    • Static scheduling research to minimize weighted and unweighted tardiness: A state-of-the-art survey
    • Sen T., Sulek J.M., and Dileepan P. Static scheduling research to minimize weighted and unweighted tardiness: A state-of-the-art survey. International Journal of Production Economics 83 1 (2003) 1-12
    • (2003) International Journal of Production Economics , vol.83 , Issue.1 , pp. 1-12
    • Sen, T.1    Sulek, J.M.2    Dileepan, P.3
  • 18
    • 0037402009 scopus 로고    scopus 로고
    • Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
    • Sun X., Morizawa K., and Nagasawa H. Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling. European Journal of Operational Research 146 3 (2003) 498-516
    • (2003) European Journal of Operational Research , vol.146 , Issue.3 , pp. 498-516
    • Sun, X.1    Morizawa, K.2    Nagasawa, H.3
  • 19
  • 20
    • 2942685602 scopus 로고    scopus 로고
    • Two-stage flowshop earliness and tardiness machine scheduling involving a common due window
    • Yeung W.K., Ouz C., and Edwin Cheng T.C. Two-stage flowshop earliness and tardiness machine scheduling involving a common due window. International Journal of Production Economics 90 3 (2004) 421-434
    • (2004) International Journal of Production Economics , vol.90 , Issue.3 , pp. 421-434
    • Yeung, W.K.1    Ouz, C.2    Edwin Cheng, T.C.3
  • 21
    • 2642555389 scopus 로고    scopus 로고
    • Scheduling for two-stage production system with setup and assembly operations
    • Yokoyama M. Scheduling for two-stage production system with setup and assembly operations. Computers and Operations Research 31 12 (2004) 2063-2078
    • (2004) Computers and Operations Research , vol.31 , Issue.12 , pp. 2063-2078
    • Yokoyama, M.1
  • 22
    • 7444246192 scopus 로고    scopus 로고
    • Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
    • Yokoyama M., and Santos D.L. Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times. European Journal of Operational Research 161 3 (2005) 754-770
    • (2005) European Journal of Operational Research , vol.161 , Issue.3 , pp. 754-770
    • Yokoyama, M.1    Santos, D.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.