메뉴 건너뛰기




Volumn 90, Issue 3, 2004, Pages 345-359

Scheduling a multi-stage fabrication shop for efficient subsequent assembly operations

Author keywords

Assembly; Heuristics; Lot scheduling; Production planning; Sequencing

Indexed keywords

ALGORITHMS; ASSEMBLY; DECISION MAKING; HEURISTIC METHODS; PLANNING; PRODUCTION ENGINEERING; REFRIGERATORS;

EID: 2942633560     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2003.08.006     Document Type: Article
Times cited : (11)

References (18)
  • 5
    • 0022246606 scopus 로고
    • Production planning and control: A personal philosophy
    • Burbidge J. Production planning and control. A personal philosophy Computers in Industry. 6:1985;477-487.
    • (1985) Computers in Industry , vol.6 , pp. 477-487
    • Burbidge, J.1
  • 6
  • 7
    • 0031220048 scopus 로고    scopus 로고
    • A framework for decision support systems for scheduling problems
    • Ecker K., Gupta J.N.D. A framework for decision support systems for scheduling problems. European Journal of Operational Research. 101:1997;452-462.
    • (1997) European Journal of Operational Research , vol.101 , pp. 452-462
    • Ecker, K.1    Gupta, J.N.D.2
  • 8
    • 0017931081 scopus 로고
    • The economic lot-scheduling problem: Review and extensions
    • Elmaghraby S.E. The economic lot-scheduling problem. Review and extensions Management Science. 24:1978;587-598.
    • (1978) Management Science , vol.24 , pp. 587-598
    • Elmaghraby, S.E.1
  • 10
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves S.C. A review of production scheduling. Operations Research. 29:1981;646-674.
    • (1981) Operations Research , vol.29 , pp. 646-674
    • Graves, S.C.1
  • 11
    • 0346932895 scopus 로고    scopus 로고
    • Optimal scheduling of the 3-machine assembly type flowshop
    • Haouari M., Daouas T. Optimal scheduling of the 3-machine assembly type flowshop. Operations Research. 33:1999;439-445.
    • (1999) Operations Research , vol.33 , pp. 439-445
    • Haouari, M.1    Daouas, T.2
  • 14
    • 0027590319 scopus 로고
    • Minimizing the makespan in the 3-machine assembly type flowshop scheduling problem
    • Lee C.-Y., Cheng T.C.E., Lin B.M.T. Minimizing the makespan in the 3-machine assembly type flowshop scheduling problem. Management Science. 39:1993;616-625.
    • (1993) Management Science , vol.39 , pp. 616-625
    • Lee, C.-Y.1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 18
    • 0037063281 scopus 로고    scopus 로고
    • Planning and replanning the master production schedule under demand uncertainty
    • Tang O., Grubbstrom R.W. Planning and replanning the master production schedule under demand uncertainty. International Journal of Production Economics. 78:2002;323-334.
    • (2002) International Journal of Production Economics , vol.78 , pp. 323-334
    • Tang, O.1    Grubbstrom, R.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.