Heuristic procedures for scheduling job families with set-ups and due dates
-
BAKER, K. R., 1999, Heuristic procedures for scheduling job families with set-ups and due dates. Naval Research Logistics, 46, 978-991.
-
(1999)
Naval Research Logistics
, vol.46
, pp. 978-991
-
-
Baker, K.R.1
-
2
-
-
0037985759
-
Minimizing maximum lateness with job families
-
BAKER, K. R. and MAGAZINE, M. J., 2000, Minimizing maximum lateness with job families. European Journal of Operational Research, 127, 126-139.
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 126-139
-
-
Baker, K.R.1
Magazine, M.J.2
-
3
-
-
0000612586
-
Complexity of tasks sequencing with deadlines, set-up times and changeover costs
-
BRUNO, J. and DOWNEY, P., 1978, Complexity of tasks sequencing with deadlines, set-up times and changeover costs. SIAM Journal of Computing, 7, 393-404.
-
(1978)
SIAM Journal of Computing
, vol.7
, pp. 393-404
-
-
Bruno, J.1
Downey, P.2
-
4
-
-
0031517374
-
Single machine scheduling with batch set-up times to minimize maximum lateness
-
HARIRI, A. M. A. and POTTS, C. N., 1997, Single machine scheduling with batch set-up times to minimize maximum lateness. Annals of Operations Research, 70, 75-92.
-
(1997)
Annals of Operations Research
, vol.70
, pp. 75-92
-
-
Hariri, A.M.A.1
Potts, C.N.2
-
5
-
-
0024736520
-
On the complexity of scheduling with batch setup times
-
MONMA, C. L. and POTTS, C. N., 1989, On the complexity of scheduling with batch setup times. Operations Research, 37, 798-804.
-
(1989)
Operations Research
, vol.37
, pp. 798-804
-
-
Monma, C.L.1
Potts, C.N.2
-
6
-
-
84974861854
-
Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
-
POTTS, C. N. and VANWASSENHOVE, L. N., 1992, Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. Journal of the Operational Research Society, 43, 395-406.
-
(1992)
Journal of the Operational Research Society
, vol.43
, pp. 395-406
-
-
Potts, C.N.1
Vanwassenhove, L.N.2
-
7
-
-
0030215229
-
Single machine scheduling with release dates, due dates and family setup times
-
SCHUTTEN, J. M., VAN DE VELDE, S. L. and ZIJM, W. H., 1996, Single machine scheduling with release dates, due dates and family setup times. Management Science, 42, 1165-1174.
-
(1996)
Management Science
, vol.42
, pp. 1165-1174
-
-
Schutten, J.M.1
Van De Velde, S.L.2
Zijm, W.H.3
-
8
-
-
0002436722
-
Batch sequencing
-
UNAL, A. T. and KIRNAN, A. S., 1992, Batch sequencing. IIE Transactions, 24, 73-83.
-
(1992)
IIE Transactions
, vol.24
, pp. 73-83
-
-
Unal, A.T.1
Kirnan, A.S.2
-
9
-
-
0029338650
-
Scheduling groups of jobs on a single machine
-
WEBSTER, S. and BAKER, K. R., 1995, Scheduling groups of jobs on a single machine. Operations Research, 43, 692-703.
-
(1995)
Operations Research
, vol.43
, pp. 692-703
-
-
Webster, S.1
Baker, K.R.2
|