메뉴 건너뛰기




Volumn 37, Issue 8, 1999, Pages 1903-1915

A new approach to finite scheduling

Author keywords

[No Author keywords available]

Indexed keywords

FINITE SCHEDULING; MATERIAL PLANNING METHOD; PRODUCTION LEAD TIMES;

EID: 0032656054     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499191058     Document Type: Article
Times cited : (3)

References (33)
  • 2
    • 0020103083 scopus 로고
    • Hierarchical production planning: A two-stage systems
    • Bitran, G. R., Haas, E. A. and Hax, A. C., 1982, Hierarchical production planning: a two-stage systems. Operations Research, 30, 232-251.
    • (1982) Operations Research , vol.30 , pp. 232-251
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 6
    • 0028698198 scopus 로고
    • Lot streaming in two-stage flow shop with set-up, processing and removal times separated
    • Cetinkaya, F. C., 1994, Lot streaming in two-stage flow shop with set-up, processing and removal times separated. Journal of the Operational Research Society, 45, 1445-1455.
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 1445-1455
    • Cetinkaya, F.C.1
  • 8
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due-date determination decisions
    • Cheng, T. C. E. and Gupta, M. C., 1989, Survey of scheduling research involving due-date determination decisions. European Journal of Operational Research, 38, 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 10
    • 0001861683 scopus 로고
    • A finite capacity planning and scheduling approach with improved lead time over MRP
    • November, Melbourne, Australia
    • Fallah, H. and Shayan, E., 1995, A finite capacity planning and scheduling approach with improved lead time over MRP. Proceedings of the 6th International Conference on Manufacturing Engineering, November, Melbourne, Australia, pp. 303-310.
    • (1995) Proceedings of the 6Th International Conference on Manufacturing Engineering , pp. 303-310
    • Fallah, H.1    Shayan, E.2
  • 12
    • 0024680497 scopus 로고
    • Due-date assignment in a multistage job shop
    • Fry, T. D., Philipoom, P. R. and Markland, R. E., 1989, Due-date assignment in a multistage job shop. IIE Transactions, 21, 153-161.
    • (1989) IIE Transactions , vol.21 , pp. 153-161
    • Fry, T.D.1    Philipoom, P.R.2    Markland, R.E.3
  • 13
    • 0020824513 scopus 로고
    • An improved lot sizing model for MRP systems
    • Gaither, N., 1983, An improved lot sizing model for MRP systems. Production and Inventory Management, 24, 1-20.
    • (1983) Production and Inventory Management , vol.24 , pp. 1-20
    • Gaither, N.1
  • 15
    • 84952500975 scopus 로고
    • Antecedents of lead time competitiveness in make-to-order manufacturing firms
    • Handheld, R. B. and Pannesi, R. T., 1995, Antecedents of lead time competitiveness in make-to-order manufacturing firms. International Journal of Production Research, 33, 511-537.
    • (1995) International Journal of Production Research , vol.33 , pp. 511-537
    • Handheld, R.B.1    Pannesi, R.T.2
  • 17
    • 0020206915 scopus 로고
    • Scheduling based M.R.P.: An integrated approach to production scheduling and material requirements planning
    • Hastings, N. A. J., Marshall, P. H. and Willis, R. J., 1982, Scheduling based M.R.P.: An integrated approach to production scheduling and material requirements planning. Journal of the Operational Research Society, 33, 1021-1029.
    • (1982) Journal of the Operational Research Society , vol.33 , pp. 1021-1029
    • Hastings, N.A.J.1    Marshall, P.H.2    Willis, R.J.3
  • 19
    • 0028401237 scopus 로고
    • An extended bill of material model for selecting production alternatives in a multi-routing environment
    • Kogan, K., 1994, An extended bill of material model for selecting production alternatives in a multi-routing environment. International Journal of Production Research, 32, 657-667.
    • (1994) International Journal of Production Research , vol.32 , pp. 657-667
    • Kogan, K.1
  • 20
    • 0024142562 scopus 로고
    • JIT and constraint theory: The issue of bottleneck management
    • 3rd Quarter
    • Lambrecht, M. and Decalure, L., 1988, JIT and constraint theory: the issue of bottleneck management. Production and Inventory Management, 3rd Quarter, 61-65.
    • (1988) Production and Inventory Management , pp. 61-65
    • Lambrecht, M.1    Decalure, L.2
  • 21
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimisation and heuristic methods in production scheduling
    • Maccarthy, B. L. and Liu, J., 1993, Addressing the gap in scheduling research: a review of optimisation and heuristic methods in production scheduling. International Journal of Production Research, 31, 59-79.
    • (1993) International Journal of Production Research , vol.31 , pp. 59-79
    • Maccarthy, B.L.1    Liu, J.2
  • 23
    • 0002654571 scopus 로고
    • Production management techniques in UK manufacturing industry: Usage and barriers to acceptance
    • Okland, J. and Sohal, A., 1987, Production management techniques in UK manufacturing industry: Usage and barriers to acceptance. International Journal of Operational Production Management, 7, 8-37.
    • (1987) International Journal of Operational Production Management , vol.7 , pp. 8-37
    • Okland, J.1    Sohal, A.2
  • 27
    • 0001872156 scopus 로고
    • Production planning and scheduling in CIM
    • G. X. Ritter (ed)
    • Solberg, J. J., 1989, Production planning and scheduling in CIM. In Information Processing.G. X. Ritter (ed), pp. 919-925.
    • (1989) In Information Processing , pp. 919-925
    • Solberg, J.J.1
  • 28
    • 0028406904 scopus 로고
    • A dynamic job shop scheduling framework: A backward approach
    • Sun, D. and Lin, L., 1994, A dynamic job shop scheduling framework: a backward approach.International Journal of Production Research, 32, 967-985.
    • (1994) International Journal of Production Research , vol.32 , pp. 967-985
    • Sun, D.1    Lin, L.2
  • 33
    • 0009350961 scopus 로고
    • On the design and development of scheduling systems
    • Yeh, B. P. C. and Pinedo, M., 1994, On the design and development of scheduling systems. IEEE, 197-203.
    • (1994) IEEE , pp. 197-203
    • Yeh, B.P.C.1    Pinedo, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.