-
2
-
-
0020103083
-
Hierarchical production planning: A two-stage systems
-
Bitran, G. R., Haas, E. A. and Hax, A. C., 1982, Hierarchical production planning: a two-stage systems. Operations Research, 30, 232-251.
-
(1982)
Operations Research
, vol.30
, pp. 232-251
-
-
Bitran, G.R.1
Haas, E.A.2
Hax, A.C.3
-
5
-
-
0024962824
-
Production scheduling: Practice and theory
-
Buxey, G., 1989, Production scheduling: practice and theory. European Journal of Operations Research, 39, 17-31.
-
(1989)
European Journal of Operations Research
, vol.39
, pp. 17-31
-
-
Buxey, G.1
-
6
-
-
0028698198
-
Lot streaming in two-stage flow shop with set-up, processing and removal times separated
-
Cetinkaya, F. C., 1994, Lot streaming in two-stage flow shop with set-up, processing and removal times separated. Journal of the Operational Research Society, 45, 1445-1455.
-
(1994)
Journal of the Operational Research Society
, vol.45
, pp. 1445-1455
-
-
Cetinkaya, F.C.1
-
7
-
-
0028410211
-
Generic kanban systems for dynamic environments
-
Chang, T. M. and Yin, Y., 1994, Generic kanban systems for dynamic environments. International Journal of Production Research, 32, 889-902.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 889-902
-
-
Chang, T.M.1
Yin, Y.2
-
8
-
-
0024303531
-
Survey of scheduling research involving due-date determination decisions
-
Cheng, T. C. E. and Gupta, M. C., 1989, Survey of scheduling research involving due-date determination decisions. European Journal of Operational Research, 38, 156-166.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
10
-
-
0001861683
-
A finite capacity planning and scheduling approach with improved lead time over MRP
-
November, Melbourne, Australia
-
Fallah, H. and Shayan, E., 1995, A finite capacity planning and scheduling approach with improved lead time over MRP. Proceedings of the 6th International Conference on Manufacturing Engineering, November, Melbourne, Australia, pp. 303-310.
-
(1995)
Proceedings of the 6Th International Conference on Manufacturing Engineering
, pp. 303-310
-
-
Fallah, H.1
Shayan, E.2
-
11
-
-
0026112946
-
Embedding JIT into MRP
-
Flapper, S. D. P., Miltenburg, G. J. and WijNGAARd, J., 1991, Embedding JIT into MRP. International Journal of Production Research, 29, 329-341.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 329-341
-
-
Flapper, S.D.P.1
Miltenburg, G.J.2
Wijngaard, J.3
-
12
-
-
0024680497
-
Due-date assignment in a multistage job shop
-
Fry, T. D., Philipoom, P. R. and Markland, R. E., 1989, Due-date assignment in a multistage job shop. IIE Transactions, 21, 153-161.
-
(1989)
IIE Transactions
, vol.21
, pp. 153-161
-
-
Fry, T.D.1
Philipoom, P.R.2
Markland, R.E.3
-
13
-
-
0020824513
-
An improved lot sizing model for MRP systems
-
Gaither, N., 1983, An improved lot sizing model for MRP systems. Production and Inventory Management, 24, 1-20.
-
(1983)
Production and Inventory Management
, vol.24
, pp. 1-20
-
-
Gaither, N.1
-
15
-
-
84952500975
-
Antecedents of lead time competitiveness in make-to-order manufacturing firms
-
Handheld, R. B. and Pannesi, R. T., 1995, Antecedents of lead time competitiveness in make-to-order manufacturing firms. International Journal of Production Research, 33, 511-537.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 511-537
-
-
Handheld, R.B.1
Pannesi, R.T.2
-
17
-
-
0020206915
-
Scheduling based M.R.P.: An integrated approach to production scheduling and material requirements planning
-
Hastings, N. A. J., Marshall, P. H. and Willis, R. J., 1982, Scheduling based M.R.P.: An integrated approach to production scheduling and material requirements planning. Journal of the Operational Research Society, 33, 1021-1029.
-
(1982)
Journal of the Operational Research Society
, vol.33
, pp. 1021-1029
-
-
Hastings, N.A.J.1
Marshall, P.H.2
Willis, R.J.3
-
18
-
-
0025243219
-
Maximising throughput in some simple time-constrained scheduling situations
-
Huisman, H. H., Polderman, G. L. and Weeda, P. J., 1990, Maximising throughput in some simple time-constrained scheduling situations. Engineering Costs and Production Economics, 18, 293-299.
-
(1990)
Engineering Costs and Production Economics
, vol.18
, pp. 293-299
-
-
Huisman, H.H.1
Polderman, G.L.2
Weeda, P.J.3
-
19
-
-
0028401237
-
An extended bill of material model for selecting production alternatives in a multi-routing environment
-
Kogan, K., 1994, An extended bill of material model for selecting production alternatives in a multi-routing environment. International Journal of Production Research, 32, 657-667.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 657-667
-
-
Kogan, K.1
-
20
-
-
0024142562
-
JIT and constraint theory: The issue of bottleneck management
-
3rd Quarter
-
Lambrecht, M. and Decalure, L., 1988, JIT and constraint theory: the issue of bottleneck management. Production and Inventory Management, 3rd Quarter, 61-65.
-
(1988)
Production and Inventory Management
, pp. 61-65
-
-
Lambrecht, M.1
Decalure, L.2
-
21
-
-
0027146758
-
Addressing the gap in scheduling research: A review of optimisation and heuristic methods in production scheduling
-
Maccarthy, B. L. and Liu, J., 1993, Addressing the gap in scheduling research: a review of optimisation and heuristic methods in production scheduling. International Journal of Production Research, 31, 59-79.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 59-79
-
-
Maccarthy, B.L.1
Liu, J.2
-
22
-
-
0026817845
-
A simulation study of bottleneck scheduling
-
Neely, A. D. and Byrne, M. D., 1992, A simulation study of bottleneck scheduling.International Journal of Production Economics, 26, 187-192.
-
(1992)
International Journal of Production Economics
, vol.26
, pp. 187-192
-
-
Neely, A.D.1
Byrne, M.D.2
-
23
-
-
0002654571
-
Production management techniques in UK manufacturing industry: Usage and barriers to acceptance
-
Okland, J. and Sohal, A., 1987, Production management techniques in UK manufacturing industry: Usage and barriers to acceptance. International Journal of Operational Production Management, 7, 8-37.
-
(1987)
International Journal of Operational Production Management
, vol.7
, pp. 8-37
-
-
Okland, J.1
Sohal, A.2
-
25
-
-
0009448734
-
Systems for supporting the MRP II/JIT environment
-
Rao, A. and Scheraga, D. I., 1987, Systems for supporting the MRP II/JIT environment. Computer Integrated Manufacturing Review, 3, 15-23.
-
(1987)
Computer Integrated Manufacturing Review
, vol.3
, pp. 15-23
-
-
Rao, A.1
Scheraga, D.I.2
-
27
-
-
0001872156
-
Production planning and scheduling in CIM
-
G. X. Ritter (ed)
-
Solberg, J. J., 1989, Production planning and scheduling in CIM. In Information Processing.G. X. Ritter (ed), pp. 919-925.
-
(1989)
In Information Processing
, pp. 919-925
-
-
Solberg, J.J.1
-
28
-
-
0028406904
-
A dynamic job shop scheduling framework: A backward approach
-
Sun, D. and Lin, L., 1994, A dynamic job shop scheduling framework: a backward approach.International Journal of Production Research, 32, 967-985.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 967-985
-
-
Sun, D.1
Lin, L.2
-
29
-
-
0009458010
-
Theory and practice of throughput materials requirement planning (T-MRP) in repetitive manufacturing
-
Adelaide, Australia
-
Tam, M. M. C., Chung, W. W. C., Saxena, K. B. C., Yung, K. L. and David, A. K., 1993, Theory and practice of throughput materials requirement planning (T-MRP) in repetitive manufacturing. Australian Conference on Manufacturing Engineering, Adelaide, Australia, pp. 151-156.
-
(1993)
Australian Conference on Manufacturing Engineering
, pp. 151-156
-
-
Tam, M.M.C.1
Chung, W.W.C.2
Saxena, K.B.C.3
Yung, K.L.4
David, A.K.5
-
30
-
-
29444446547
-
Interactive due-date management system
-
Tsubone, H., Matsuura, H. and Kanda, M., 1992, Interactive due-date management system. OMEGA International Journal of Management Science, 20, 91-98.
-
(1992)
OMEGA International Journal of Management Science
, vol.20
, pp. 91-98
-
-
Tsubone, H.1
Matsuura, H.2
Kanda, M.3
-
32
-
-
0004035262
-
-
Ph.D. thesis, Swinburne University of Technology, Melbourne, Australia
-
Woxvold, E. R. A., 1993, ARMOR: An application package for processes and assembly manufacturing which combines MRPII, PERT/CPM, and Just-In-Time functions into one system. Ph.D. thesis, Swinburne University of Technology, Melbourne, Australia.
-
(1993)
ARMOR: An Application Package for Processes and Assembly Manufacturing Which Combines MRPII, PERT/CPM, and Just-In-Time Functions into One System.
-
-
Woxvold, E.1
-
33
-
-
0009350961
-
On the design and development of scheduling systems
-
Yeh, B. P. C. and Pinedo, M., 1994, On the design and development of scheduling systems. IEEE, 197-203.
-
(1994)
IEEE
, pp. 197-203
-
-
Yeh, B.P.C.1
Pinedo, M.2
|